India Energy Storage Market Update 2025
India Energy Storage Market Update 2025
Investments
1. ReNEw announced that it will Invest INR22K Crores in RE projects in AP, the project includes a 1.8 GW Solar, 1 GW wind
facility along with 2 GWh of BESS
2. IFC announced participation in financing India’s largest Stationary storage BESS with support from Clean Technology Firm
and Global Energy Storage Program. (Indigrid Gujarat Project)
Policy and Regulatory Enablers
1. In a recent discussion of National Committee on Transmission (NCT), BESS was discussed as an alternative to HVDC line for
Rajasthan, a proposed 6 GW *4.25 Hrs. would cost around INR 21K Crores as against HVDC line (VSC Tech) cost of INR 34K
Cr., further a lifetime cost benefit analysis is directed to be conducted.
Note: Limited to utility scale competitive bid tenders only
2. CTUIL proposed 3 acres/100 MWh as benchmark land requirement for BESS Projects
3. Rajasthan Mandated BESS for Captive projects exceeding 100% contract demand.
4. Forum of Regulators proposed exempting PSPs for electricity duties and cess on input energy for pumping to reduce costs
and promote investments in PSPs. They also suggested extending the waiver on ISTS charges for new PSPs beyond June 30,
2025
As of May 2025, BESS capacity of 500 MWh is operational, with ~0.5 GWh worth capacity expected 29
to come online by Q3-Q4, 2025
35
Of the total ESS capacity, 35% is under various stages of execution, 24% is
9 26 7
cancelled and 39% is under tendering process 25
1 4
4 11 4
14 5 24
2
2 4
5 12 3 15
2 3 2
2 10 7
2 2
1 1
1
1 1
1 2
1 1 3 5
2018 2019 2020 2021 2022 2023 2024 2025 Total
Legend Operational Under Construction Awarded Bidding Closed Cancelled Open Tender Notice for Tender
Note: The numbers in the graph refers to the number of tenders. Captures only projects/ tenders in competitive bidding domain
Updated till 29 May 2025
Source: Tender nodal agency websites, press releases, compiled by Debmalya Sen
As of May 2025, 160 GWh of ESS Capacity tenders has been shared of which 57 GWh is in various stages of
execution and 53 GWh is in tendering process with 39 GWh tenders cancelled
Technology Breakup of Tenders (GWh) Capacity wise Tender Status as of May 2025 (GWh)
Operational
Others
160 0%
4% 160
Execution BOOT
29% RfS 7% 0.5
36%
EPC
47 23% Business 46.1
Models
Awarded
7% BOO
106 1 Bidding 66%
10 Cancelled Closed 10.4
25% 3%
35
1.7 X 39.0
47 70
54 5.4
39 5.6 X
13 41 41.3 43
1 1.4 2.5 1.9
10 39
48.1
8
7 31.6 7.2 28.1
32 7 7 5.8
7 2.9
9 10 3.5 7.5 12.5 10.0 10.1
BESS (GWh) PSP (GWh) Total ESS (GWh) 2018
2018 - 2022 2023 2024 2025 Total
Legend Operational Under Construction Awarded Bidding Closed Cancelled Open Tender Notice for Tender
Note: Captures only projects/ tenders in competitive bidding domain. Certain tenders are agnostic of technology hence not captured in BESS or PSP but taken into the total ESS column
The Indian Energy Storage Tender Landscape – Multiple Innovations, some hits and some misses
RE Solar
Standalone FDRE
Tender Category + +
Assured Load Peak ESS/ RTC BESS
BESS PSP RTC Total
Peak Following Supply
Solar (GW) +
Unit GWh GWh GW GW GW GW GW GW
BESS (GWh)
Number of Tenders 36 13 9 6 3 2 20 9 30
Total Capacity 32.5 13.9 10.3 5.4 3.6 1.7 21.6 9.5 12.3 / 16.5
Note: Limited to utility scale competitive bid tenders only
Tender Open 4.0 35.4 1.5 1.0 - 1.5 5.1 0.5 2.8/ 6.1
Present Status of Tender
Tender Awarded 4.4 - 3.2 0.6 2.0 0.2 5.6 1.9 3.4/ 5.4
Cancelled 4.7 34.5 0.4 3.8 1.5 - 5.7 5.8 1.2 / 0.7
Solar + BESS
Standalone BESS
A total of 0.5 GWh of BESS Capacity is commissioned with 46 GWh (ESS) under execution as of May2025
A total of 1 GWh of capacity is expected to come online in 2025, with the capacity since increasing steadily YOY till 2029-30
REMCL PAN India 900 Optional BOO RTC Sprng, NTPC, Ayana NA 3.99, 4.10, 4.10/kWh
KREDL Karnataka 2 4.5 EPC Solar + ESS NSure Reliable BESS -
SECI Kaza 2 1 EPC Solar + ESS Suryam International BESS -
SJVN PAN India 2368 664 BOO FDRE Peak O2, Blupine, ACME, HFE, TPREL, Juniper, ReNew BESS 4.38 - 4.39/kWh
GUVNL Gujarat - 500 BOO Standalone Indigrid, Gensol BESS 4.49 lacs/MW/month
MSEDCL Maharashtra - 24000 BOOT Standalone JSW & Torrent PSP 0.80 - 1.10 Cr/MW/year
SECI Leh 25 50 EPC Solar + ESS Prozeal BESS 313 Crores
NTPC Noida - 3 EPC Standalone Rays Power BESS -
NHPC PAN India 1400 - BOO FDRE Peak Brightnight, HFE, Blupine, Juniper, ReNew, ACME BESS 4.55 – 4.63/kWh
NTPC PAN India 1530 415 BOO FDRE Peak Axis, ReNew,TPREL, Juniper,Serentica, Brightnight, HFE BESS 4.64 – 4.73/kWh
SECI PAN India 1200 1200 BOO Solar+ ESS Peak Mgmt. BESS 3.41-3.42/kWh
MSEDCL Maharashtra - 1500 BOO Standalone Pace Digitek BESS 2.19 lac/MW/month
BSPGCL Bihar 185 254 EPC Solar + BESS L&T BESS -
GUVNL Gujarat - 500 BOO Standalone Gensol BESS 3.72 Lacs/MW/month
SECI Kerala - 500 BOO Standalone JSW BESS 4.41 [Link]/month
GUVNL Gujarat - 1000 BOO Standalone HG Infra, Advait, Bhilwara, Kintech BESS 2.26 lacs/MW/month
UPPCL Uttar Pradesh - 12000 BOO Standalone JSW & Adani PSP 93.9 lacs/MW/year
Source: Tender nodal agency websites, compiled by Debmalya Sen
Opportunity @ 53 GWh ESS Capacity with 8 GW RE as of March 2025 | 20 GWh BESS, 35 GWh PSP
Tendering RE ESS Tender Storage Tender Tender
Location Use Case
Authority (MW) (MWh) Scope Technology Year Month
DoP, WB West Bengal - 4500 DFBOT Peak Mgmt. PSP 2023 Jul-23
MPPMCL PAN India - 3000 BOOM Peak Mgmt. PSP 2023 Oct-23
THDC PAN India - 12000 EPC Peak Mgmt. PSP 2024 Apr-24
KREDL Karnataka 100 100 EPC Peak Mgmt. BESS 2024 Jul-24
RUMSL Madhya Pradesh 600 Mandatory BOO Peak Mgmt. BESS 2024 Sep-24
NTPC Ramagundam - 400 EPC Peak Mgmt. BESS 2024 Oct-24
NTPC PAN India 1200 Mandatory BOO Firm and Dispatchable RE BESS 2024 Oct-24
PSPCL PAN India 1000 - BOO Firm and Dispatchable RE Agnostic 2024 Dec-24
SECI Lakshadweep 9 32 RESCO Peak Mgmt. BESS 2025 Jan-25
REMCL PAN India 500 Optional BOO RTC - 2025 Jan-25
NTPC PAN India 1200 2400 BOO Peak Mgmt. BESS 2025 Jan-25
BSPGCL Bihar - 500 BOOT Peak Mgmt. BESS 2025 Feb-25
NHPC Andhra Pradesh - 1000 BOO Peak Mgmt. BESS 2025 Feb-25
NTPC PAN India - 1000 BOO Peak Mgmt. BESS 2025 Feb-25
SJVN Uttar Pradesh - 1500 BOO Peak Mgmt. BESS 2025 Feb-25
Note: Limited to utility scale competitive bid tenders only
SECI PAN India 1200 1200 BOO RE + ESS AMP,ReNew,HFE, ACME 4.64 - 4.73/kWh Nov-22 Apr-23
REMCL PAN India 700 Optional BOO RTC Torrent,ReNew,O2,NTPC,ACME,TATA 4.25 - 4.43/kWh Sep-23 Jan-24
SECI PAN India 630 Mandatory BOO FDRE Load Serentica, JSW, HFE, Vena, Hexa 4.98 - 4.99/kWh Aug-23 Jul-24
SJVN PAN India 1200 Mandatory BOO FDRE Peak Hero, Zelestra, Juniper, ReNew, Avaada 4.25/kWh Mar-24 Oct-24
NTPC RJ/ GJ - 1000 BOO Standalone Indigrid, HG infra, Kintech Synergy 2.37-2.39 lacs/MW/month Jun-24 Oct-24
NTPC PAN India 760 Mandatory BOO FDRE Peak Hexa Climate, ACME, Avaada 4.69 – 4.70/kWh Jun-24 Nov-24
SECI PAN India 200 800 BOO FDRE Peak O2 Power 8.50/kWh Sep-24 Jan-25
NHPC PAN India 1200 1200 BOO Solar + BESS Onix, NTPC, Jindal, Rays Power, Adani 3.09/kWh Sep-24 Jan-25
RVUNL Rajasthan - 1000 BOO Standalone Oriana, Solarworld, JSW, Rays Power 2.21-2.24 lacs/MW/month Nov-24 Jan-25
TGGENCO Telangana - 500 BOO Standalone Bondada Engg, Oriana Power, Pace Digitek 2.40 – 2.45 lacs/MW/month Jan-25 Mar-25
GUVNL Gujarat - 1000 BOO Standalone Solarworld. HG Infra 2.80-2.85 lacs/MW/month Jan-25 Apr-25
NHPC Kerala - 500 BOO Standalone NTPC, Opera Energy 4.34-4.58 lacs/MW/month Jan-25 May-25
SECI PAN India 432 - BOO RTC Jndal India, Sembcorp, Hexa, HFE 5.06-5.07/kWh Oct-24 May-25
Source: Tender nodal agency websites and commission notes, compiled by Debmalya Sen
Solar with BESS gained significant traction in 2024, the year saw 6.5X increase in tendered capacity compared to
2018-2023 combined, 3.09/kWh for 2 Hrs. 3.32/kWh for 4 Hrs. has been the L1 Discovered Tariff
Legend Operational Under Construction Awarded Bidding Closed Cancelled Open Tender Notice for Tender
5000 8
6.99
Bid Capacity (Solar (MW) and BESS (MWh)
4000
4000
5.6 6
L1 Tariff (INR/kWh)
3000
2400 4
3.41 3.52
3.32
2000 3.09
2000
4 Hours 4 Hours
20 8 35 57
0 0
NLC GSECL SECI 1 SECI2 NHPC SJVN
April June March August September May
2018 2021 2024 2025
Bid Winning month
Source: Tender nodal agency websites, commission notes, compiled by Debmalya Sen
Solar with BESS Tenders Overview | 2018 - 2025
Tendering RE ESS Tender Winning Bid Tender
Sl. No. Location Use Case Current Status Winner
authority (MW) (MWh) scope (INR) Year
1 NLC A&N Islands 20 8 EPC DG Optimization Operational L&T 133 Crores (6.99/kWh) 2018
2 SECI 1 Leh 3 3.2 EPC DG Optimization Cancelled Sunsource 2019
3 GPCL Modera 6 15 EPC RE Integration Operational Mahindra-Susten 65 Crores 2019
4 SECI 2 Lakshadweep 1.7 1.4 EPC DG Optimization Operational Sunsource - 2019
5 SECI 3 A&N Islands 4 2 BOO DG Optimization Under Execution Sunsource - 2020
6 SECI 4 Chhattisgarh 100 120 EPC RE Integration, peak mgmt. Operational TATA Power 770 Crores 2020
7 SECI 5 Leh 20 50 EPC DG Optimization Cancelled TATA Power 368 Crores 2020
8 TANGEDCO Tamil Nadu 1 3 BOO RE Integration, peak mgmt. Cancelled 2021
9 GSECL Kutch 35 57 EPC RE Integration Operational L&T 335 Crores (5.6/kWh) 2021
10 KREDL 1 Karnataka 5 16 EPC Peak Mgmt. Cancelled 2022
11 KREDL 2 Karnataka 2 4.5 EPC Peak Mgmt. Tender Awarded NSure Reliable - 2022
12 SECI 6 Kaza 2 1 EPC DG Optimization Under Execution Suryam International - 2023
13 RUVNL PAN India 1200 600 BOO Peak Mgmt. Cancelled Blupine, ACME 6.68/kWh (600 MW) 2023
14 BSPGCL Bihar 185 254 EPC Peak Mgmt. Tender Awarded L&T 2023
15 SECI 7 PAN India 1200 1200 BOO RE Integration Under Execution Pace Digitech, ACME, HFE 3.41 - 3.42/kWh 2024
16 SECI 8 Lakshadweep 1.4 1.1 RESCO DG Optimization RfS Issued 2024
17 SECI 9 Leh 25 50 EPC Peak Mgmt. Tender Awarded Prozeal 313 Crores 2024
18 KREDL 3 Karnataka 100 100 EPC Peak Mgmt. RfS Issued 2024
Reliance, Blupine, HFE,
19 SECI 10 PAN India 2000 4000 BOO Peak Mgmt. Tender Awarded 3.52 – 3.53/kWh 2024
Sembcorp, NTPC
SAEL, Hindistan Power, Relaince,
20 SJVN PAN India 1200 2400 BOO Peak Mgmt. Tender Awarded 3.32 – 3.33/kWh 2024
Jindal,JBM
21 RUMSL Madhya Pradesh 600 Mandatory BOO Peak Mgmt. RfS Issued 2024
22 NHPC PAN India 1200 1200 BOO Peak Mgmt. Tender Awarded Onix,Renew,Adani,Kolar,NTPC 3.09 – 3.10/kWh 2024
23 SJVN PAN India 1500 Mandatory BOO Peak Mgmt. NIT 2024
24 SECI Lakshadweep 9 32 RESCO Peak Mgmt. NIT 2025
25 NTPC PAN India 1200 2400 BOO Peak Mgmt. RfS Issued 2025
26 NTPC Noida 5 12 EPC Peak Mgmt. EoI 2025
27 BSPGCL Bihar 116 202 EPC Peak Mgmt. RfS Issued 2025
28 NHPC PAN India 1200 2400 BOO Peak Mgmt. RfS Issued 2025
29 KREDL Karnataka 250 1100 BOO Peak Mgmt. RfS Issued 2025
30 PowerGrid MadhyaPradesh 98 20 EPC Peak Mgmt. RfS Issued 2025
Source: Tender nodal agency websites, compiled by Debmalya Sen
Firm and Dispatchable Renewables (FDRE) Status Overview | 2023 - 2025
FDRE consists of 4 different configurations, including (1) assured peak power, (2) Round the Clock (RTC) RE with firm delivery during demand hours, (3) Load following
power delivery as specified by DISCOM, and (4) RE projects with Firm delivery of power for fixed hours as per requirement of DISCOMs.
SECI RTC
(1200 MW) 21.6
SECI FDRE 5 SJVN FDRE 4
(1000 MW) (1500 MW)
Source: MNRE Guidelines, tender nodal agency websites, compiled by Debmalya Sen
Legend: Under Construction Cancelled Awarded (partial) Awarded Tendered Bidding closed Load following model RTC model Peak dispatch specific
Note: NTPC 1: 1,584 MW awarded out of 3,000 MW, NHPC 1: 1.4 GW awarded out of 1.5 GW, NTPC 2, 760 MW awarded out of 1200 MW, SECI FDRE 6, 200 MW awarded out of 2 GW;SJVN
RTC 480 MW tendered out of 1.2GW
Firm and Dispatchable Renewables (FDRE) Status Overview | 2023 - 2025
4000 10
8.5
3000 7.5
Source: Tender nodal agency websites, commission notes, compiled by Debmalya Sen
5.59
4.98 5.06
4.64 4.69 4.81
2000 4.55 4.37 4.48 4.38 5
4.25
ESS
Optional
1000 2.5
0 0
SECI FDRE 2 SECI FDRE 4 NHPC FDRE NHPC FDRE NHPC FDRE NTPC FDRE NTPC FDRE SJVN FDRE 1 SJVN FDRE 2 SECI FDRE 6 SJVN RTC 1 SECI RTC2
1 2 3 1 2
SECI 630 Mandatory BOO Load Following Commission Approved Serentica, JSW, HFE, Vena, Hexa 4.98 - 4.99/kWh Aug-23 Jul-24 Mar-25
Brightnight, HFE, Blupine, Juniper,
NHPC 1400 Mandatory BOO Assured Peak Under Execution 4.55 - 4.63/kWh Sep-23 Feb-24 Jan-25
ReNew, ACME
RUMSL 400 Mandatory BOO Assured Peak Cancelled Oct-23 Aug-24
Axis, ReNew, TPREL, Juniper,
NTPC 1530 415 BOO Assured Peak Under Execution 4.64 - 4.73/kWh Oct-23 Mar-24
Serentica, Brightnight, HFE
SECI 1000 Mandatory BOO Load Following Cancelled Nov-23 Sep-24
Essar, Juniper, Serentica, Hexa
NHPC 1200 Mandatory BOO Assured Peak Tender Awarded 4.37 - 4.38/kWh Jan-24 Jul-24
Climate, Avaada
Hero, Zelestra, Juniper, ReNew,
SJVN 1200 Mandatory BOO RTC Tender Awarded 4.25/kWh Mar-24 Oct-24
Avaada
NTPC 760 Mandatory BOO Assured Peak Tender Awarded Hexa Climate, ACME, Avaada 4.69 - 4.70/kWh Jun-24 Nov-24
NHPC 1200 Mandatory BOO Assured Peak Tender Awarded Rays Power, Avaada, ACME, Juniper 4.48 - 4.56/kWh Jun-24 Dec-24
SECI 200 Mandatory BOO Peak Only Tender Awarded O2 Power 8.50/kWh Sep-24 Jan-25
ReNew, Eg Energy, Dinesh Chandra,
SJVN 448 Mandatory BOO RTC Tender Awarded 4.82-4.91/kWh Sep-24 Feb-25
Serentica, TPREL
NTPC 1200 Mandatory BOO Assured Peak RfS Issued Oct-24
SECI 1200 Mandatory BOO RTC Tender Awarded HFE, Hexa, Jindal, Sembcorp 5.06-5.07/kWh Oct-24 May-25
PSPCL 1000 Mandatory BOO Load Following RfS Issued Dec-24
SJVN 1500 Mandatory BOO Peak Only RfS Issued Dec-24
TATA Power D 250 Mandatory BOO Assured Peak RfS Issued Apr-25
Note: SECI FDRE 2 cancelled after being awarded; NTPC: 1,584 MW awarded out of 3,000 MW, SJVN 1: 1.18 GW awarded out of 1.5 GW, NHPC: 1.4 GW awarded out of 1.5 GW, NTPC 2 – 760 of 1200MW awarded,
SECI FDRE 6, 200 MW out of 2GW awarded. SECI FDRE 4 PSA not signed
Standalone BESS Tenders Growth Trend | 2022 - 2025
The Stationary storage market has seen a huge turnaround with the decreasing cost of batteries over the last 2 years. The approval of viability gap funding for the
sector has further accelerated tendering activities by various central and state nodal agencies. In between 2023 - 24, the market grew by 5.8X times!
KPTCL
GUVNL Ph 2
GUVNL Ph 3
GUVNL Ph 4
BRPL
UPPCL
NVVN ESS 1
RVUNL
SECI ESS 1
SECI ESS 2
MSEDCL
TGGENCO
GUVNL
NHPC
KSEB
SECI(KSEBL)
x
x
x x
April OctoberSeptemberNovember March June October November January February March April May
2022 2023 2024 2025
Capacity (MWh) L1 Tariff INR (Lacs/MW/month) Single Cycle
Source: Tender nodal agency websites, press releases, compiled by Debmalya Sen
Standalone BESS Tenders – Tracker (2022 – 2025)
Power Energy
Tendering No of Cycles Business Winning Quote
Tender Month Capacity Capacity Subsidy/VGF Present Status Winners
Authority per day Model (INR)
(MW) (MWh)
Jan-25 GUVNL 500 1000 2 BOO RfS Issued Solarworld, HG Infra 2.80 lacs/MW/month
Jan-25 NHPC 125 500 2 BOO 30% VGF Tender Awarded NTPC, Opera Energy 4.34 lacs/MW/month
Jan-25 TGGENCO 250 500 2 BOO 30% VGF Tender Awarded Bondada Engg, Oriana Power, Pace Digitek 2.40 Lacs/MW/month
Jan-25 NTPC 2500 10,000 2 EPC + O&M NIT
Feb-25 KPTCL 500 1000 2 BOOT 30% VGF Tender Awarded Sarala, Oriana, Pace Digitek 2.49 lacs/MW/month
Source: MNRE Guidelines, tender nodal agency websites, compiled by Debmalya Sen
In the competitive bidding space, of the total capacity tendered, 35% is in various stages of execution, 28% in under tendering process while 37% has been
cancelled. The table below details the status of all 13 tenders issued by various nodal agencies since 2019
RE Integration,
2023 PCKL Karnataka - 1000 8000 BOO Cancelled JSW, Greenko 1.48 Cr/MW/year
peak mgmt.
2023 NTPC PAN India - 1500 9000 BOO RE Integration (RTC) Cancelled
Firm and Dispatchable
2023 NTPC PAN India - 2000 12000 BOO Cancelled
Renewables
2023 DoP, WB West Bengal - 900 4500 DFBOT Peak Mgmt. RfS Issued
2023 MPPMCL PAN India - 500 3000 BOOM Peak Mgmt. RfS Issued
0.80 - 1.10
2024 MSEDCL Maharashtra - 3000 24000 BOOT RE Integration (RTC) Under Execution JSW & Torrent
Cr/MW/year
2024 UPPCL UP - 2000 12000 BOO RE Integration (RTC) Under Execution JSW & Adani 76-96 lacs/MW/year
2024 GRIDCO PAN India - 500 2500 BOO Peak Mgmt. Cancelled
2024 THDC PAN India - 2000 12000 EPC Peak Mgmt. RfS Issued
2025 UPPCL PAN India - 2000 12000 EPC Peak Mgmt. RfS Issued
2025 AEML Pan India - 750 3750 BOO Peak Mgmt. RfS Issued
Source: Tender nodal agency websites, compiled by Debmalya Sen