Road project
Project AAA
I.no. description of work unit Qty
17.01 clearing & grubbing ha 95
To Bill Summary
Bill No. 3 Drainage
21.01 Excavation for open drains:
21.01(a) Soft Material cu.m 2320
21.01(b) Hard Material cu.m 1025
21.02 Subsuface drains excavated in:
21.02(a) Soft Material m 515
21.02(b) Hard Material m 260
21.03 Concrete outlet structures to subsurface drains cu.m 10
21.04 Banks and dykes cu.m 260
22.01 Excavation Material
22.01(a) Soft Material cu.m 1210
22.02(b) Hard Material cu.m 275
22.02 Backfilling using approved backfill materials cu.m 955
Concrete pipe culverts, on Class A bedding 525 mm
22.03(1)(i) dia RCP m 50
Concrete pipe culverts, on Class A bedding 600mm dia
22.03(b)(ii RCP m 50
Concrete pipe culverts, on Class A bedding 750 mm
22.03(a)(iii dia RCP m 50
Concrete pipe culverts, on Class A bedding 900 mm
22.03(a)(ivdia RCP m 2945
Concrete pipe culverts, on Class A bedding 1050 mm
22.03(a)(v)dia RCP m 185
Concrete pipe culverts, on Class A bedding 1200 mm
22.03(a)(vidia RCP m 50
Cast in situ concrete in Class A bedding, blinding
22.06(a) layers and encasing of pipes cu.m 100
Cast in situ Class C concrete in box culvert and inlet
and outlet structures, including formwork and Class U2
22.06( c) surface finish cu.m 710
To Bill Summary
22.07(a) Steel reinforcement, mild steel Gr.40 Kg 3680
22.08 Removing existing concrete:
22.08(a) Plain Concrete cu.m 510
22.08(b) Reinforced Concrete cu.m 255
22.10 Storm drain gully with manhole no 700
Remove silt deposits in existing pipe, box and slab
22.14 culverts no 16
Cast in situ concrete Class 35/20 for rainling and posts
22.15 of bridges and slab m 46
Prefabricated guide posts for approaches of drainage
22.16 structures m 170
22.17 Dowels for joining old and new concrete kg 3310
23.01 Concrete kerbing:
Page1/9Target cost
Road project
Project AAA
I.no. description of work unit Qty
23.01(a) Semi-barrier Class 20/20 concrete kerbing (Type A) m 8000
23.01(b) Class 20/20 concrete edging kerb (Type B) m 5300
24.01 Stone Pitching:
24.01(a)(i) Plain Pitching, 200 mm thick sq.m 1850
24.01(a)(ii)Plain Pitching, 250 mm thick sq.m 1600
24.01(a)(iiiPlain Pitching, 300 mm thick sq.m 1150
24.01(b)(i) Grouted Pitching, 200 mm thick sq.m 1220
24.01(b)(ii Grouted Pitching, 250 mm thick sq.m 1070
24.01(b)(iiiGrouted Pitching, 300 mm thick sq.m 810
24.02 Riprap:
24.02(a)(i) Packed Riprap. 25 kg critical mass cu.m 5
24.02(b) Dumped Riprap, 150 kg critical mass cu.m 7
24.03(b) Cement mortared stone masonry walls cu.m 18
Interlocking precast concrete block pitching for Precast
24.04(b) concrete Paved Trapezoidal Waterway sq.m 8000
To Bill Sammary
Bill No 4 Earhwork Subbase, Shoulders and Bases
34.01 Cut and Borrow to fill:
34.01(a) Ordinary Fill cu.m 130270
34.01(b) Rock fill cu.m 11560
34.01(c ) Selected subgrade cu.m 18000
34.01(d) Capping Layer cu.m 82900
34.04 Cut to spoil
34.04(a) In soft material cu.m 25440
34.04(b) In hard material cu.m 600
34.12 Construction of drainage blankets cu.m 6200
Gravel subbase Type 1, constructed from material
obtained from borrow and compacted to 95% B.S.
35.01 heavy density (AASHTO T 180 D) cu.m 39383
Subbase Type 2, constructed from crushed gravel or
crushed stone material compacted to 95% B.S heavy
35.02 density (AASHTO T 180 D) density (AASHTO T 180 D) cu.m 142569
Crushed stone base compacted to 100% B.S. Heavy
37.01 density (AASHTO T 180 D) cu.m 108440
To Bill Summary
Bill No. 5 Bituminous Surface Courses
41.01(a) Prime Coat: MC-30 curback bitumen l 347,550
43.01 Double seal surface treatment using:
19.0 mm and 9.5 mm aggregate with 85/100 pen
43.01(a) bitumen sq.m 231700
Bituminous binder variations 85/100 pen bitumen (rate
43.02(a) only) l 1
43.03 Aggregate variations:
43.03(a) 19.0 mm aggregate (rate only) cu.m 1
Page2/9Target cost
Road project
Project AAA
I.no. description of work unit Qty
43.03(c ) 9.5 mm aggregate (rate only) cu.m 1
Bitumen penetration macadam. 75 mm compacted
thickness, using 63 mm and 19 mm aggregate and 9.5
mm surface sealing chippings, 85/100 penetration
bitumen and MC-800 cut back bitumen at the rates
45.01(a) specified in the specifications sq.m 157100
45.02 Bituminous binder variations:
45.02(a) 85/100 penetration bitumen (rate only) l 1
45.02(c ) MC-800 cut back bitumen (rate only) l 1
45.03 Aggregate variations:
45.03(a) 63 mm aggregate (rate only) cu.m 1
45.03(c ) 19mm aggregate (rate only) cu.m 1
45.03(e) 9.5mm aggregate (rate only) cu.m 1
To Bill Summary
Bill No 6 Miscellaneous Items
51.01(a) Grbion boxes, as shown on the drawings cu.m 1920
51.01(b) Gabion mattresses as shown on the drawings cu.m 840
51.02 Wire netting slope protection sq.m 930
52.01(c ) Kilometer Posts no. 49
53.01 Guardrails on steel posts galvanized:
53.01(a) W Beam Guard Rail m 720
53.01(b) Tubular Guard Rail m 72
Guard rail terminal sections in accordance with the
53.02 Drawings no. 27
Sign faces with painted background symbols, lettering
and borders in Engineering grade retro-flective
material with signboard constructed from Aluminium
54.01 (1.60 mm thick):
54.01(a) Traffic signs no. 27
54.01(b) Direction signs no. 6
54.02 Sign supports Concrete Class A no. 36
Concrte Class B in road sign footings including
54.03 excavation and backfilling' no. 36
55.03 Reflecting paint:
55.03(a)(i) White lines (broken). 100 mm width km 24
55.03(a)(ii)White lines (unbrocken). 100 mm width km 26
55.03(b) Yellow lines (unbrocken). 100 mm width km 100
55.03(c ) White lettering and symbols sq.m 12
55.04 Variation in rate of application:
55.04(a) White paint (rate only) l 1
55.04(b) Yellow paint (rate only) l 1
To Bill Summary
Bill No 6 Miscellancous Item
Page3/9Target cost
Road project
Project AAA
I.no. description of work unit Qty
55.04(c) Glass beads (rate only) kg 1
65.01 Stockpiling of Top soil cu.m 300
56.02 Preparation of area for grassing
56.02(a) Topsoiling cu.m 540
56.02(b) Provide and apply chemical fertilizer t 15
56.03 Grassing
56.03(a) Planting of grass cuttings ha 15
56.03(b) Seeding ha 15
56.04 Provide seedling and labour for trees plantation no 10500
58.04 Subbase for sidewalks and footways cu.m 330
58.05 Sidewalk precast concrete block tiles sq.m 3120
74.03 Class B massonry retaining walls cu.m 15400
Repair of cracks and plastering of concrete or masonry
75.01 structures sq.m 300
Clearing of exposed reinforcement and patching of
75.02 reinforced concrete surface with epoxy mortar sq.m 15
75.03 Repair of crack with cement mortar m 9
75.04 Injection of cracks with epoxy resins m 9
Repair of existing parapet, footway curbs, guide post,
75.05 etc. cu.m 9
75.06 Repiacement of missing or damaged steel hand raill kg 150
To Bill Summary
Grand summary
Page4/9Target cost
consumption rates
Project AAA
No. Activity Performance/key resource
GROUP II - EARTH WORK
1 Clearing and grubbing 0.10 Ha/dozer(D7H)-hr
2 Excavation to waste 50.00 m3/dozer(D8R)-hr
3 Rock Excavation to waste 35.00 m3/dozer(D8R)-hr
Borrow Excavation
4 Material Production 80.00 m3/dozer(D8R)-hr
5 Material hauling 120.00 m3/loader(CAT 938F)-hr
6 Material placing and compacting 75.00 m3/grader(CAT 140G)-hr
GROUP III - PAVEMENT
Selected Sub base Material
7 Material production 80.00 m3/dozer(D8R)-hr
8 Crushing 60.00 m3/crusher(75 t/hr)-hr
9 Material Hauling 150.00 m3/loader(CAT 950F)-hr
10 Material Placing and compacting 50.00 m3/grader(CAT 140G)-hr
GROUP IV - MINOR DRAINAGE
STRUCTURE
11 Structure Excavation 12.00 m3/excavator(CAT 255)-hr
12 Foundation Fill 2.50 m3/h. driven roller-hr
13 Class 'B' Bedding Material 2.50 m3/h. driven roller-hr
14 Class 'A' Concrete 3.00 m3/mixer(500 lit)-hr
15 Class 'C' Concrete 3.00 m3/mixer(500 lit)-hr
16 Reinforcement Steel 15.00 Kg/barbender-hr
17 Class 'B' Masonry 0.25 m3/mason-hr
30" R.C. Pipe
18 Pipe production 3.00 m3/mixer(500 lit)-hr
19 Pipe hauling 35.00 km./truck-hr
20 Pipe laying 1.50 m/mason-hr
36" R.C. Pipe
21 Pipe production 3.00 m3/mixer(500 lit)-hr
22 Pipe hauling 35.00 km./truck-hr
23 Pipe laying 1.50 m/mason-hr
42" R.C. Pipe
24 Pipe production 3.00 m3/mixer(500 lit)-hr
25 Pipe hauling 35.00 km./truck-hr
26 Pipe laying 1.20 m/mason-hr
48" R.C. Pipe
27 Pipe production 3.00 m3/mixer(500 lit)-hr
28 Pipe hauling 35.00 km./truck-hr
29 Pipe laying 1.20 m/mason-hr
30 Grouted Rubble Paved Waterway 0.70 m2/mason-hr
31 Formwork ,minor 0.70 m2/carpenter-hr
32 Mortar 1.50 m3/mixer(350 lit)-hr
GROUP IV - MINOR DRAINAGE
STRUCTURE
33 Structural Excavation 15.00 m3/excavator(CAT 255)-hr
34 Selected Granular backfill 3.00 m3/h. driven roller-hr
35 Class A Concrete 2.50 m3/mixer(500 lit)-hr
36 Class C concrete 2.50 m3/mixer(500 lit)-hr
37 Reinforcement steel 15.00 Kg/barbender-hr
38 Class B stone masonry 0.25 m3/mason-hr
39 R.C. Bridge Railing 0.16 m/carpenter-hr
40 Bridge Bearings 0.16 m/carpenter-hr
41 Guide Posts 5.00 Pcs/crew-hr
42 Formwork ,Major 0.70 m2/carpenter-hr
GROUP VI RETAINING WALL & MISCELLANEOUS
43 Class B stone masonry 0.25 m3/mason-hr
44 Class C concrete 2.50 m3/mixer(500 lit)-hr
45 Guide Posts 5.00 Pcs/crew-hr
46 Reflective sign face no. 1 8.00 Pcs/carpenter-hr
47 Concrete post 13.00 pcs/mixer(500 lit)-hr
Page5/9Productivity target
Road project
Project road
Resourc cons. resourc
I.no. description of work unit Qty e Rate e qty Remark
(unit/hr) (hrs)
1 17.01 clearing & grubbing ha 95
Dozer 0.1 950
To Bill Summary
Bill No. 3 Drainage
21.01 Excavation for open drains:
2 21.01(a) Soft Material cu.m 2320
Dozer 50 46.4
3 21.01(b) Hard Material cu.m 1025
Dozer 35 29.2857
21.02 Subsuface drains excavated in:
4 21.02(a) Soft Material m 515 g 5m deep
Dozer 3.33333 154.5 3m wide
5 21.02(b) Hard Material m 260 5m deep
Dozer 2.33333 111.429 3m wide
21.03 subsurface drains cu.m 10
21.04 Banks and dykes cu.m 260
22.01 Excavation Material
22.01(a) Soft Material cu.m 1210
22.02(b) Hard Material cu.m 275
22.02 backfill materials cu.m 955
Concrete pipe culverts, on Class
22.03(1)(iA bedding 525 mm dia RCP m 50
Concrete pipe culverts, on Class
22.03(b)(iA bedding 600mm dia RCP m 50
Concrete pipe culverts, on Class
22.03(a)(iA bedding 750 mm dia RCP m 50
Concrete pipe culverts, on Class
22.03(a)(iA bedding 900 mm dia RCP m 2945
Concrete pipe culverts, on Class
22.03(a)( A bedding 1050 mm dia RCP m 185
Concrete pipe culverts, on Class
22.03(a)(vA bedding
Cast in situ1200 mm dia
concrete RCP A
in Class m 50
bedding, blinding layers and
22.06(a) encasing of Class
Cast in situ pipes C concrete in cu.m 100
box culvert and inlet and outlet
structures, including formwork
22.06( c) and Class U2 surface finish cu.m 710
To Bill Summary
22.07(a) Gr.40 Kg 3680
22.08 Removing existing concrete:
22.08(a) Plain Concrete cu.m 510
22.08(b) Reinforced Concrete cu.m 255
22.10 Storm drain gully with manhole no 700
Remove silt deposits in existing
22.14 pipe,in
Cast box and
situ slab culverts
concrete Class 35/20 no 16
for rainling and posts of bridges
22.15 and slab
Prefabricated guide posts for m 46
approaches of drainage
22.16 structures m 170
22.17 concrete kg 3310
23.01 Concrete kerbing:
Page6/9Target cost
Road project
Project road
Resourc cons. resourc
I.no. description of work unit Qty e Rate e qty Remark
(unit/hr) (hrs)
Semi-barrier Class 20/20
23.01(a) concrete kerbing (Type A) m 8000
23.01(b) (Type B) m 5300
24.01 Stone Pitching:
24.01(a)(iPlain Pitching, 200 mm thick sq.m 1850
24.01(a)(iPlain Pitching, 250 mm thick sq.m 1600
24.01(a)(iPlain Pitching, 300 mm thick sq.m 1150
24.01(b)(iGrouted Pitching, 200 mm thick sq.m 1220
24.01(b)(iGrouted Pitching, 250 mm thick sq.m 1070
24.01(b)(iGrouted Pitching, 300 mm thick sq.m 810
24.02 Riprap:
24.02(a)(imass cu.m 5
24.02(b) mass cu.m 7
24.03(b) walls
block pitching for Precast cu.m 18
concrete Paved Trapezoidal
24.04(b) Waterway sq.m 8000
To Bill Sammary
Bill No 4 Earhwork Subbase, Shoulders and Bases
34.01 Cut and Borrow to fill:
34.01(a) Ordinary Fill cu.m 130270
34.01(b) Rock fill cu.m 11560
34.01(c )Selected subgrade cu.m 18000
34.01(d) Capping Layer cu.m 82900
34.04 Cut to spoil
34.04(a) In soft material cu.m 25440
34.04(b) In hard material cu.m 600
34.12 blankets
Gravel subbase Type 1, cu.m 6200
constructed from material
obtained from borrow and
35.01 compacted
Subbase Type to 95% B.S. heavy
2, constructed cu.m 39383
from crushed gravel or crushed
stone material compacted to
95% B.S heavy density (AASHTO
35.02 T 180 D) stone
Crushed density (AASHTO
base T 180 cu.m 142569
compacted
to 100% B.S. Heavy density
37.01 (AASHTO T 180 D) cu.m 108440
To Bill Summary
Bill No. 5 Bituminous Surface Courses
41.01(a) bitumen l ###
43.01 using:
19.0 mm and 9.5 mm aggregate
43.01(a) with 85/100 pen bitumen sq.m 231700
Bituminous binder variations
43.02(a) 85/100 pen bitumen (rate only) l 1
43.03 Aggregate variations:
43.03(a) 19.0 mm aggregate (rate only) cu.m 1
43.03(c ) 9.5 mm aggregate (rate only) cu.m 1
Page7/9Target cost
Road project
Project road
Resourc cons. resourc
I.no. description of work unit Qty e Rate e qty Remark
(unit/hr) (hrs)
Bitumen penetration macadam.
75 mm compacted thickness,
using 63 mm and 19 mm
aggregate and 9.5 mm surface
sealing chippings, 85/100
penetration bitumen and MC-800
45.01(a) cut back bitumen at the rates sq.m 157100
45.02 Bituminous binder variations:
45.02(a) (rate only) l 1
45.02(c ) only) l 1
45.03 Aggregate variations:
45.03(a) 63 mm aggregate (rate only) cu.m 1
45.03(c ) 19mm aggregate (rate only) cu.m 1
45.03(e) 9.5mm aggregate (rate only) cu.m 1
To Bill Summary
Bill No 6 Miscellaneous Items
51.01(a) drawings cu.m 1920
51.01(b) the drawings cu.m 840
51.02 Wire netting slope protection sq.m 930
52.01(c )Kilometer Posts no. 49
53.01 galvanized:
53.01(a) W Beam Guard Rail m 720
53.01(b) Tubular Guard Rail m 72
Guard rail terminal sections in
53.02 accordance withpainted
Sign faces with the Drawings no. 27
background symbols, lettering
and borders in Engineering
grade retro-flective material with
54.01 signboard constructed from
54.01(a) Traffic signs no. 27
54.01(b) Direction signs no. 6
54.02 Sign supports
Concrte Concrete
Class B Class A
in road sign no. 36
footings including excavation
54.03 and backfilling' no. 36
55.03 Reflecting paint:
55.03(a)(iwidth km 24
55.03(a)(iwidth km 26
55.03(b) mm width km 100
55.03(c ) White lettering and symbols sq.m 12
55.04 Variation in rate of application:
55.04(a) White paint (rate only) l 1
55.04(b) Yellow paint (rate only) l 1
To Bill Summary
Bill No 6 Miscellancous Item
55.04(c) Glass beads (rate only) kg 1
65.01 Stockpiling of Top soil cu.m 300
56.02 Preparation of area for grassing
56.02(a) Topsoiling cu.m 540
56.02(b) fertilizer t 15
Page8/9Target cost
Road project
Project road
Resourc cons. resourc
I.no. description of work unit Qty e Rate e qty Remark
(unit/hr) (hrs)
56.03 Grassing
56.03(a) Planting of grass cuttings ha 15
56.03(b) Seeding ha 15
56.04 trees plantation no 10500
58.04 footways cu.m 330
58.05 tiles sq.m 3120
74.03 Class
RepairBof
massonry retaining
cracks and walls cu.m
plastering 15400
of concrete or masonry
75.01 structures
reinforcement and patching of sq.m 300
reinforced concrete surface with
75.02 epoxy mortar sq.m 15
75.03 mortar m 9
75.04 resins m 9
Repair of existing parapet,
75.05 footway curbs, guide post, etc. cu.m 9
Repiacement of missing or
75.06 damaged steel hand raill kg 150
To Bill Summary
Grand summary
Page9/9Target cost