2011

The East-West Corridor project in Assam is detailed in the document, including its current status and specific information for Cachar and Dima Hasao districts. The document outlines year-wise funds allocated, released, and utilized from 2014 to 2018, as well as mentions any cost overruns and the tentative completion date. Additional details regarding the project’s progress and completion status are provided in annexures.

Uploaded by

saravana222003
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views

2011

The East-West Corridor project in Assam is detailed in the document, including its current status and specific information for Cachar and Dima Hasao districts. The document outlines year-wise funds allocated, released, and utilized from 2014 to 2018, as well as mentions any cost overruns and the tentative completion date. Additional details regarding the project’s progress and completion status are provided in annexures.

Uploaded by

saravana222003
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 11

GOVERNMENT OF INDIA

MINISTRY OF ROAD TRANSPORT AND HIGHWAYS

LOK SABHA
UNSTARRED QUESTION NO. 665
ANSWERED ON 13TH DECEMBER, 2018

EAST-WEST CORRIDOR PROJECT IN ASSAM

665. KUMARI SUSHMITA DEV:

Will the Minister of ROAD TRANSPORT AND HIGHWAYS

सड़क परिवहन औि िाजमार्ग मंत्री


be pleased to state:

(a) the details of current status of the East-West Corridor project in Assam, particularly in
the districts of Cachar and Dima Hasao;

(b) the year-wise funds allocated, funds released and funds utilised on the project from
2014 to 2018;

(c) whether there is any cost over-run for completion of the projects, if so, the details
thereof; and

(d) the tentative date of completion of the project?

ANSWER

THE MINISTER OF STATE IN THE


MINISTRY OF ROAD TRANSPORT AND HIGHWAYS

(SHRI MANSUKH L. MANDAVIYA)

(a) Details of East-West Corridor are given at Annexure-I.

(b) to (d) Details given at Annexure II.


Annexure -I
ANNEXURE REFERRED TO IN REPLY TO PART (C) TO (D) OF LOK SABHA UNSTARRED QUESTION NO.665 ANSWERED ON 13TH DECEMBER, 2018 ASKED
BY KUMARI SUSHMITA DEV REGARDING ‘EAST WEST CORRIDOR PROJECT IN ASSAM’.

Details of 4 - Lane / 2 - Lane in NE Region

Total Length
Sl. NH No. Total Length
Project District Scheme Completed Remarks
No (Old / New)
(Km) (Km)
State Assam (East -West Corridor Projects)

4 laning from WB Border The Contract was terminated on 29.03.2016.


NHDP PH -
1 (Srirampur) to Kochugaon section 31C / 27 30.000 27.595 Project reawarded on 31.07.2017 to M/s
Kokrajhar II Simplex Infrastructure Projects Ltd.
(AS-12)
(BTC)
4 laning from Kachugaon to NHDP PH -
2 31C / 27 29.715 29.715 Project Completed
Karigaon section (AS-11) II+E8:E23
4 laning from Karigaon to Bongaigaon & NHDP PH -
3 31C / 27 32.671 32.671 Project Completed
Rakhaldobi section (AS-10) Chirang (BTC) II
4 laning from Rakhaldobi to
4 31 / 27 Bongaigaon 21.500 21.500 Project Completed
Patiladoha section (AS-09)
4 laning from Patiladoha to Kaljhar Barpeta &
5 31 / 27 30.000 30.000 Project Completed
section (AS-08) Baska (BTC)
4 laning from Kaljhar to
6 31 / 27 Barpeta 27.300 25.405 Ongoing Project
Patacharkuchi section (AS-07)
NHDP PH -
4 laning from Patacharkuchi to Nalbari & II
7 31 / 27 24.700 24.700 Project Substantially Completed
Nalbari section (AS-06) Baska (BTC)
Nalbari &
4 laning from Nalbari to Puthimari
8 31 / 27 Kamrup 28.000 28.000 Project Completed
section (AS-05)
(Rural)
4 laning from Puthimari to Amingaon Kamrup
9 31 / 27 26.814 26.814 Project Completed
section (AS-04) (Rural)
Total Length
Sl. NH No. Total Length
Project District Scheme Completed Remarks
No (Old / New)
(Km) (Km)
State Assam (East -West Corridor Projects)
Construction of New Brahamaputra
Kamrup
10 Bridge (Amingaon to Jalukbari) (AS- 31 / 27 4.700 4.700 Project Substantially Completed
(Metrol)
28)
Kamrup
11 4 laning of Guwahati Bypass 37 / 27 18.000 18.000 Project Completed
(Metrol)
4 laning from Khanapara (Guwahati) Kamrup
12 37 / 27 19.100 19.100 Ongoing Project
to Sonapur (AS-03) (Metrol)
4 laning from Sonapur to Jagiroad Kamrup
13 37 / 27 22.000 22.000 Project Substantially Completed
section (AS-20) (Metrol)
4 laning from Jagirod to Dharmatul
14 37 / 27 Morigaon 25.500 25.500 Project Completed
section (AS-19)
4 laning from Dharmaful to Raha Morigaon &
15 37 / 27 24.500 24.500 Project Completed
section (AS-02) Nagaon
4 laning from Raha to Nagaon
16 section (i/c Naogaon Bypass) (AS- 37 / 27 23.663 23.663 Project Completed
18)
4 laning from Nagaon to Doboka
17 36 / 27 30.362 30.362 Project Completed
section (AS-17)
Nagaon
4 laning from Doboka to Lanka
18 section (i/c Daboka Bypass) (AS- 54 / 27 24.032 24.032 Project Completed
16)
4 laning from Lanka to Udali section
19 54 / 27 18.000 18.000 Project Completed
(AS-15)
4 laning from Udali to Manderdisa
20 54 / 27 Hojai 20.250 20.250 Project Substantially Completed
(Lumding) section (AS-27)
4 laning from Manderdisa (Lumding)
21 54 / 27 Dima Hasao 22.900 22.900 Project Substantially Completed
to Hatikhali section(AS-26)
Total Length
Sl. NH No. Total Length
Project District Scheme Completed Remarks
No (Old / New)
(Km) (Km)
State Assam (East -West Corridor Projects)
4 laning from Hatikhali to Lailing
22 54 / 27 27.600 27.600 Project Substantially Completed
section (AS-25)
4 laning from Lailing to Maibong
23 54 / 27 15.450 15.450 Project Completed
section (AS-24)
4 laning from Maibong to
24 54 / 27 15.570 15.390 Project Substantially Completed
Narimbanglo section (AS-23)
4 laning from Narimbanglo to
25 54 / 27 Dima Hasao 23.380 20.940 Foreclosed
Jatinga section (AS-22)
4 laning from Jatinga to Harangajao
26 54 / 27 25.190 4.000 Contract Terminated
section (AS-21)
4 laning from Balachera to Silchar
27 54 / 27 Cachar 25.760 25.760 Project Completed
section (AS-01)

Total 636.657 608.547


Annexure-II
ANNEXURE REFERRED TO IN REPLY TO PART (C) TO (D) OF LOK SABHA UNSTARRED QUESTION NO.665 ANSWERED ON 13TH DECEMBER, 2018 ASKED
BY KUMARI SUSHMITA DEV REGARDING ‘EAST WEST CORRIDOR PROJECT IN ASSAM’.

Date of Additi-
NH Cost of Revise
Sl. onal
Contract Pkg No. Length Commen Award d Cost During
N District Cost During During During Remarks
Stretch No. (Old/ (km) ce-ment Comp Comp (Rs in ( Rs in FY
o. ( Rs in FY FY FY
New) (as per (Org) (likely) Crore) Crore) 2017-
Crore) 14 -15 15-16 16-17
contract) 18
1 2 3 4 5 6 8 9 10 17 18 19 23 24 25 26 32
Four Laning of
WB Border
(Srirampur) to
The Contract
Kochugaon
18.10.05 17.04.08 - 218.38 218.38 0.00 3.22 0.00 0.19 0.00 was terminated
section from Km
on 29.03.2016
00.00 to Km
30.00
(Terminated)
31C /
1 Balance work of {AS-12} 30.000
27
four Laning of
Balance work
WB Border Kokrajhar
was Re-
(Srirampur) to (BTC)
awarded on
Kochugaon 05.10.17 04.04.20 - 129.19 129.19 0.00 0.00 0.00 0.00 0.00
31.07.2017 to
section from Km
M/s Simplex
00.00 to Km
infra Ltd..
30.00
(Reawarded)
Four Laning of
Kachugaon to Project
31C / Project
2 Karigaon section {AS-11} 29.715 06.10.05 05.04.08 Comple 199.41 220.20 20.79 24.38 38.00 21.22 29.45
27 Completed
from Km 30.00 to ted
Km 60.00
Four Laning of Bongaiga
Project
Karigaon to on & 31C Project
3 {AS-10} 32.671 06.10.05 05.04.08 Comple 248.69 281.78 33.09 56.46 63.93 37.26 15.58
Rakhaldobi Chirang /27 Completed
ted
section from Km (BTC)
Date of Additi-
NH Cost of Revise
Sl. onal
Contract Pkg No. Length Commen Award d Cost During
N District Cost During During During Remarks
Stretch No. (Old/ (km) ce-ment Comp Comp (Rs in ( Rs in FY
o. ( Rs in FY FY FY
New) (as per (Org) (likely) Crore) Crore) 2017-
Crore) 14 -15 15-16 16-17
contract) 18
1 2 3 4 5 6 8 9 10 17 18 19 23 24 25 26 32
60.00 to Km
93.00
(Old length 33.00
Km)
Four Laning of
Rakhaldobi to
Project
Patiladoha Bongaiga Project
4 {AS-9} 31 /27 21.500 03.11.05 02.05.08 Comple 131.23 151.91 20.68 9.14 0.00 0.00 2.38
section from Km on Completed
ted
961.50 to Km
983.00
Four Laning of
Patiladoha to Barpeta Project
31 / Project
5 Kaljhar section & Baska {AS-8} 30.000 03.11.05 02.05.08 Comple 187.08 204.00 16.92 10.31 5.26 0.00 0.00
27 Completed
from Km 983.00 (BTC) ted
to Km 1013.00
Four Laning of Show Caused
Kaljhar to Notice has
Patacharkuchi been issued to
section from Km 31 / 31.03.1 the contractor
6 Barpeta (AS-7) 27.30 19.10.05 19.04.08 207.17 230.00 22.84 7.81 5.37 22.47 0.66
1013.00 to Km 27 9 by the NHAI
1040.30 HQ under
clause 63.1 of
CoPA
Four Laning of 26.04.1
Patacharkuchi to Nalbari & 9 Project
31 /
7 Nalbari section Baska (AS-6) 24.700 10.11.05 10.07.08 (For full 182.48 193.26 10.78 4.16 4.31 6.00 2.88 Substantially
27
from Km 1040.30 (BTC) comple Completed
to Km 1065.00 tion)
Date of Additi-
NH Cost of Revise
Sl. onal
Contract Pkg No. Length Commen Award d Cost During
N District Cost During During During Remarks
Stretch No. (Old/ (km) ce-ment Comp Comp (Rs in ( Rs in FY
o. ( Rs in FY FY FY
New) (as per (Org) (likely) Crore) Crore) 2017-
Crore) 14 -15 15-16 16-17
contract) 18
1 2 3 4 5 6 8 9 10 17 18 19 23 24 25 26 32
Four Laning of
Nalbari to Nalbari & Project
31 / Project
8 Puthimari section Kamrup (AS-5) 28.000 02.12.05 01.06.08 Comple 192.87 236.75 43.88 53.64 12.91 0.00 6.31
27 Completed
from Km 1065.00 (Rural) ted
to Km 1093.00
Four Laning of
Puthimari to
Project
Amingaon Kamrup 31 / Project
9 (AS-4) 26.814 02.12.05 01.06.08 Comple 173.63 210.00 36.37 55.40 41.74 0.00 4.42
section from Km (Rural) 27 Completed
ted
1093.00 to Km
1119.814
Construction of Project
New Substantially
30.04.1
Brahamaputra Completed.
9
Bridge Kamrup 31 / Under DLP
10 (AS-28) 4.700 22.10.06 25.04.10 (For full 238.14 360.84 122.70 56.61 50.32 49.39 5.15
(Amingaon to (Metrol) 27 Bridge has
comple
Jalukbari) from been
tion)
Km 1119.81 to inaugurated on
Km 1124.51 29.01.2017.
Four Laning of
Khanapara
(Guwahati) to Kamrup 37 / 31.12.1 Ongoing
11 {AS-3) 19.100 25.10.05 24.07.08 166.72 174.34 7.62 0.00 21.22 0.00 4.72
Sonapur section (Metrol) 27 8 Project
from Km 163.90
to Km 183.00
Four Laning of 28.02.1
Project
Sonapur to 9
Kamrup 37 / Substantially
12 Jagiroad section (AS-20) 22.000 21.12.05 20.06.08 (For full 137.75 167.98 30.23 0.00 4.13 6.11 13.27
(Metrol) 27 Completed.
from Km 183.00 comple
Under DLP
to Km 205.00 tion)
Date of Additi-
NH Cost of Revise
Sl. onal
Contract Pkg No. Length Commen Award d Cost During
N District Cost During During During Remarks
Stretch No. (Old/ (km) ce-ment Comp Comp (Rs in ( Rs in FY
o. ( Rs in FY FY FY
New) (as per (Org) (likely) Crore) Crore) 2017-
Crore) 14 -15 15-16 16-17
contract) 18
1 2 3 4 5 6 8 9 10 17 18 19 23 24 25 26 32
Four Laning of
Jagiroad to
Project
Dharamtul 37 / Project
13 Morigaon {AS-19} 25.500 25.11.05 30.06.08 Comple 173.14 284.27 111.13 40.46 24.80 1.76 8.19
section from Km 27 Completed
ted
205.00 to Km
230.50
Four Laning of
Dharamtul to Project
Morigaon 37 / Project
14 Raha section {AS-02} 24.500 25.11.05 30.06.08 Comple 273.80 372.91 99.11 5.73 13.51 22.86 24.01
& Nagaon 27 Completed
from Km 230.50 ted
to Km 255.00
Four Laning of
Raha to Nagaon
section from Km Project
37 / Project
15 255.00 to Km {AS-18} 23.663 16.11.05 15.05.08 Comple 238.72 301.21 62.49 0.00 0.00 0.00 0.00
27 Completed
262.725 & ted
15.943 Km of
Nagaon Bypass
Four Laning of
Nagaon to Project
Nagaon 36 / Project
16 Daboka section {AS-17} 30.362 25.11.05 01.07.08 Comple 202.18 309.83 107.65 0.00 0.00 0.00 0.00
27 Completed
from Km 5.500 to ted
Km 35.862
Four Laning of
Daboka to Lanka
Project
section from Km 54 / Project
17 {AS-16} 24.032 29.11.05 28.06.08 Comple 198.65 221.57 22.92 0.00 0.00 0.00 0.00
0.00 to Km 22.00 27 Completed
ted
& 4.14 Km of
Dakoka Bypass
Date of Additi-
NH Cost of Revise
Sl. onal
Contract Pkg No. Length Commen Award d Cost During
N District Cost During During During Remarks
Stretch No. (Old/ (km) ce-ment Comp Comp (Rs in ( Rs in FY
o. ( Rs in FY FY FY
New) (as per (Org) (likely) Crore) Crore) 2017-
Crore) 14 -15 15-16 16-17
contract) 18
1 2 3 4 5 6 8 9 10 17 18 19 23 24 25 26 32
Four Laning of
Lanka to Udali
Project
section from Km 54 / Project
18 {AS-15} 18.000 14.03.08 13.09.10 Comple 143.97 186.76 42.79 0.00 0.00 0.00 0.00
22.00 to Km 27 Completed
ted
40.00 including
Lanka Bypass
Four Laning of
Udali to 31.12.1
Project
Manderdisa 8
54 / Substantially
19 (Lumding) Hojai {AS-27} 20.250 15.10.06 14.04.09 (For full 198.68 229.40 30.72 46.98 31.49 28.35 24.33
27 Completed.
section from Km comple
Under DLP
40.00 to Km tion)
60.50
Four Laning of
30.09.1
Manderdisa Project
8
(Lumding) to 54 / Substantially
20 {AS-26} 22.900 24.07.11 23.01.14 (For full 255.00 326.25 71.25 81.26 89.06 49.58 54.72
Hatikhali section 27 Completed.
comple
from Km 60.50 to Under DLP
tion)
Km 83.40
Four Laning of 31.03.1
Project
Hatikhali to Dima 9
54 / Substantially
21 Laining section Hasao {AS-25} 27.600 31.01.11 31.07.13 (For full 372.63 279.65 -92.98 67.89 41.06 48.35 50.26
27 Completed.
from Km 83.40 to comple
Under DLP
Km 111.00 tion)
Four Laning of
Lailing to Project
54 / Project
22 Maibong section {AS-24} 15.450 14.01.11 13.07.13 Comple 225.33 210.84 -14.49 27.81 32.22 14.19 24.92
27 Completed
from Km 111.00 ted
to Km 126.55
Date of Additi-
NH Cost of Revise
Sl. onal
Contract Pkg No. Length Commen Award d Cost During
N District Cost During During During Remarks
Stretch No. (Old/ (km) ce-ment Comp Comp (Rs in ( Rs in FY
o. ( Rs in FY FY FY
New) (as per (Org) (likely) Crore) Crore) 2017-
Crore) 14 -15 15-16 16-17
contract) 18
1 2 3 4 5 6 8 9 10 17 18 19 23 24 25 26 32
Four Laning of Project
Maibong to Substantially
31.12.1
Narimbanglo Completed.
8
section from Km 54 / Under DLP
23 {AS-23} 15.570 05.08.06 04.02.09 (For full 317.11 404.00 86.89 41.07 40.30 39.69 6.14
126.45 to Km 27 Affected by
comple
140.70 & Km landslide. 180m
tion)
164.08 to Km road has been
165.40 damaged.
Four Laning of Affected by
Narimbanglo to landslide.
Jatinga section 4 lane has

Foreclosed
from Km 140.70 been damaged
54 /
24 to Km 164.08 {AS-22} 23.380 03.11.11 02.05.14 318.69 612.90 294.21 64.96 71.52 104.24 118.76 in some areas
27
due to landslide
Dima & sinking.
Hasao Package
foreclosed
Four Laning of Contract
Jatinga to Terminated.
Harangajao 4 lane has

Contract Terminated.
section from Km been damaged
165.40 to Km due to landslide
190.59 & sinking.
54 /
25 {AS-21} 25.190 30.10.11 29.04.14 333.83 362.95 29.12 22.81 18.18 6.98 0.00 The
27
maintenance of
the existing NH
has been taken
up for the
benefits of the
road users and
Date of Additi-
NH Cost of Revise
Sl. onal
Contract Pkg No. Length Commen Award d Cost During
N District Cost During During During Remarks
Stretch No. (Old/ (km) ce-ment Comp Comp (Rs in ( Rs in FY
o. ( Rs in FY FY FY
New) (as per (Org) (likely) Crore) Crore) 2017-
Crore) 14 -15 15-16 16-17
contract) 18
1 2 3 4 5 6 8 9 10 17 18 19 23 24 25 26 32
the road is
being
maintained
now.

Four Laning of
Balachera to Project
54 /
26 Silchar section Cachar (AS-1) 25.760 17.09.04 16.09.07 Comple 115.86 151.60 35.74 14.26 0.17 11.45 0.00 Completed
27
from Km 275.00 ted
to Km 300.76
7032.7 1252.4
Grand Total 618.657 5780.32 694.36 609.50 470.09 396.15
7 5
Guwahati Bypass 18.000 Km
Total length of East - West Corridor 636.657 Km