MASDAR CITY
MASDAR CITY
a sustainable urban development blending innovation, renewable energy, and traditional design.
TIMELINE:
2006 2008 2010 2015 2023-2030
Project conceived Groundbreaking Phase 1 completed, The solar farm starts Ongoing expansions
by the Abu Dhabi ceremony; including key supplying energy. and gradual scaling
Future Energy construction begins residential and of smart
Company (ADFEC). with the Masdar academic facilities. infrastructure and
Institute of Science population targets.
and Technology.
CHALLENGES:
High Development Costs
Climate-Specific Design:
1. While the design addresses Abu Dhabi's
desert climate, it limits adaptability for cities in
different climatic zones.
Car-Free Concept
Sustainability vs. Urban Growth:
2. Balancing sustainable infrastructure with
urban expansion is a delicate issue.
Delayed Timelines