02 KFSC-KF05-KIC-00-ZXX-NL-1A0-02-000019-Partations Types Plan-Part 03

The document appears to be a detailed architectural or engineering drawing, including various rooms and their dimensions, such as meeting rooms, prayer rooms, and facilities. It includes notes on copyright, dimensions, and general information relevant to the layout. Additionally, it emphasizes that all dimensions are in meters and should be verified on-site.

Uploaded by

amrrkhattab
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views1 page

02 KFSC-KF05-KIC-00-ZXX-NL-1A0-02-000019-Partations Types Plan-Part 03

The document appears to be a detailed architectural or engineering drawing, including various rooms and their dimensions, such as meeting rooms, prayer rooms, and facilities. It includes notes on copyright, dimensions, and general information relevant to the layout. Additionally, it emphasizes that all dimensions are in meters and should be verified on-site.

Uploaded by

amrrkhattab
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

3.

70

3.00
1.70

4.20

4.20

4.50
3.00
Lobby Copyright by MINISTRY OF SPORT (MOS) All rights reserved. This document may not, in whole or in part,
be reproduced, stored, transmitted or distributed in any form or by any means, whether electronic,
1.04 0.10 1.02 0.10 1.02 0.10 1.07 0.10 GR-56 mechanical, by photocopy, recording or otherwise, without the prior written permission of MOS. Except where
otherwise expressly agreed in writing by MOS, MOS shall have no responsibility or liability for any loss (direct,
W01

0.20
consequential or otherwise) which may arise from reliance on or use of this document or the information
Y04-C
contained therein.
4.45 0.10 300
، ‫ ا اوور ةنينإ ةاتيإ اذق قفرستاا وو خنراات وو اللت وو خوراعت‬. ‫قلوح قفطلب وقفاشو ﻳم قلق ورقمإ قفمايرا ﻳوم ( عرلب قفقلوح ﻳقووحا‬
(

W01 W01
W01 W01 ‫ نوع قفقصوﻋ‬، ‫ لوقس اياك ةفتتموالا وو ﻳلتيالتلا وو نم قماا قفتصواو وو قفتسولق وو رلو ذفا‬، ‫ عوا شتق وو عوا ولللا‬، ‫اليلق ووعرييلق‬
200 300

0.65
‫ نلع ةذع اتيعي ﻳسلا ﻳم‬MOS. ‫ ﻳي فر اتر قاخويح نلع الا ذفا ًمققالاتيعيلق ﻳم قلق‬MOS ‫ فم ختقرق‬، MOS ‫وا ﻳسلوفلا وو‬

0.20 0.70
W02

0.15
C2.T2 C1.T2 . ‫قفترقا نم وا اسيمإ ) ﻳليشمإ وو خلعلا وو رلو ذفا ( قا خاشت نم قانترين نلع وو قلتننقا اذه قفوثللا وو قفرعلوﻳيا قفوقمنإ للهي‬

1.00
0.18
200 W01

0.30

0.90 0.15
Y06-R N
KEY PLAN LOCATION
3.20

0.30 1.00 1.00 1.15 1.00 1.00 1.20 0.10 1.55 6.05 0.30 2.85
0.10 0.53 W01/
0.35

0.62
W01

2.10

2.72
300
W01 W02

1.55
C1.T.2 C1.T2 W01
2.20 0.20 200 100 C1.T.1

3.10
Meeting 300

4.10
2.00
Y03-C

3.90
Majlis Room
GR-77 GR-42
1.90

2.10
W03 W02

1.75

0.23 0.95
100 W01

1.00
C1.T2 C1.T2 W01
2.20 0.20 100 GATE 05

ENTRY/
EXIT

AMBULANCE
PARKING
10K LIT

WATER TANK

PARKING
CLINIC
3710 X 4050

STORE CONTAINER
10K LIT

HSE QS 10120 X 8250

4810 X 4050

QCM CM PROJECT MANAGER

TOILET
PRM CM

MAIN
SO CONF OFFICE

ABULATION AREA

SMOKE SHLTR
TRA MOSQUE

1.00
W01 W01

0.03

0.10
C1.T.2 C1.T2 Y05-R
200
0.20 1.00

0.15 0.95 6.60 0.30 2.85


NORTH ARROW LOCATION

1.00
W01 (With Makkah)
0.20 0.20

Y02-C
GRAPHIC SCALE LOCATION
1.80

2.20 0.20 4.45 0.10 W01 W02

3.02

2.83
C1.T2 C1.T2

2.96
Meeting
Prayer 100 100 Room
GENERAL NOTES
1.00

Room

2.00
GR-43

4.15
GR-78 1. ALL DIMENSIONS ARE IN METER (M)
W01 2. DO NOT SCALE. DIMENSIONS ARE GIVEN IN THIS DRAWING.
1.00

W01 300 3. ALL DIMENSIONS TO BE VERIFIED ON SITE.


C1.T.2
W01 C1.T2 W01 W03
Conference
1.70

200 C1.T.2 C1.T2 C1.T2 C1.T2

0.95
0.20 W01 W01 Room 02 200 200

1.00
Y01-C
0.30 0.90

GR-41 W01
1.60 0.30 4.45 0.30 1.23 1.00 2.52 1.00 1.48 4.28 5.20 0.10 2.25 4.20 3.50 0.30
0.10

0.30
0.20

0.20

0.23
Y04-R

3.00

3.04
W04 W02

C1.T2
100 First Aid

2.15
X03-C X10-U
W01 GR-45
C1.T.2 C1.T2
2.40

2.40

2.43

200 W02

3.30
W01

3.60

W03
200
C1.T.1
W01 C1.T2 C1.T2
W01 300
C1.T2 C1.T2 Manager Manager 100 W01
100 300 C1.T.2 C1.T2 2.85

4.90
GR-24 GR-25 200

1.00

1.45
W01

C1.T2
W02 W02 Corridor
0.10 1.00

1.00

W02 100
1.20

100

3.03
GR-49 Y03-R
100 Dual Office 0.20 1.00 2.80 0.20 3.30 IT Room 0.30
0.23 0.95 2.33 0.22 0.75 2.58
GR-30 W01 GR-44

1.00
C1.T2 C1.T2

1.53
100
0.13 0.95

2.90

0.95 2.45 0.15


00 22/03/2025 Shop Drawing For Approval - -

0.50
3 4.00 3.30 REV .No Date
REASON FOR ISSUE APPROVED CHECKED
0.10

1.00
0.18

W01 DRAWING

Sec 2 Drawing Status Label


0.92

W03 W01 STATUS

1.00
1.94
C1.T2 C1.T2 W01 C1.T.1
200 300 Client ‫ﻋاﻳن‬

5.60
Document Prayer
Control W02 Room
1.00

Prayer

0.40
W01 100 2.85 0.15

4.40
GR-31 GR-47 Room
2.00

0.30

0.50
GR-46
CW01 0.23
0.95 0.10 0.90
2.75

1.55
0.25 W02

1.00
W01 2.83 0.95 W01 W02
W01 200
0.10

W02 C1.T2 C1.T2 C1.T.2 C1.T2 C1.T.2 C1.T2 CONSULTANT ‫قالتشيما‬


100 200 200 200

1.90
100 Male
Smoke

0.48

0.95
0.20
Room
0.10

0.10
2.17

GR-54 Y02-R
3.00 3.50 Generic 5.25 2.25 0.40 1.00 3.10 1.00 0.20 2.00 0.20 2.80 0.30
Wall
1.02

(Material

1.00
W02
C1.T2

W01

1.75
By B2010 W01

2.00
Category), 200 200
W02 SUPERVISION CONSULTANT
200mm C2.T2
200
C1.T2 Wash ‫قلتشيما قرشمقا‬
thick W01 C1.T.1
Lobby
3.55

1.60

GR-50

0.20

1.20
300
1.47
W04

1.00 0.40 0.80 3.20 0.80 0.20


0.20
200

GR-39

C1.T2

C2.T2
W02 C1.T2
W02 0.20 1.00 0.80 0.20

5.20

5.45
200 100 Disabled 2.80
1.55

1.00
C1.T2

0.20 W.C W01


0.98

0.10 0.92

0.30
Reception Toilets GR-52 2.80 Female

W02
200
2.60 0.23 0.95 2.33 0.20
0.22 0.95 1.58 0.30 0.80 1.10 2.45 0.80 0.20 4.00 0.10 6.60 & Visitor 0.20 2.50 0.10 1.60 0.20 1.80 0.20 1.00 0.80 0.20 Smoke 0.30

W02
GR-53

200
0.10

CONTRACTOR ‫قفرليوﻋ‬
0.20

3.20
0.15

0.15

0.15

Waiting 0.20

0.65
W02 Room
1

3.35
Area W.C GR-55
200

W03
100
Electrical GR-40 GR-51 Sec 1
C2.T2
KHONAINI INTERNATIONAL COMPANY
C1.T2

Room

C2.T2

1.00
1.90

GR-34 0.30
Printer
Manager 0.30 1.00 1.00 0.80 1.00 0.80 1.00 1.00 0.22 0.78 1.70 0.10 1.60 0.200.60 1.20 0.20 2.00 0.20 2.80
3.30

3.30

3.30

0.35
Room
3.30

0.30
GR-23 W03

0.15
3.70
W04

GR-33 Y01-R
200

C1.T2 C1.T2
200
Design Consultant ‫ قلتشيما قفتصرلر‬Sub Contractor ‫ﻳليوﻋ ﻳم قفليقم‬
Control W03
W01 Room 300
C1.T.1
W01 W01
C1.T2

C1.T.2 C1.T2 W01 W01 C1.T.1 W01 C2.T.1


200 GR-32 300 300
0.30

0.30

W01 C1.T.1
2.60 1.25 1.00 2.25 1.00 0.95 1.15 1.00 1.30 2.50 4.25
300
W01 W01 W01 PROJECT TITLE ‫ناوقع قفرشموا‬
3.00
W01 C2.T.1
W01 C1.T.1
W02 C1.T.1
W03 C1.T.1 KING FAHD SPORTS CITY ‫ﻳنااا قفرلا لها قفمايرلا‬
300 300 300 300
EPMO Site Offices ‫ﻳتيخم ةنقمإ قفرشموا عيفروقب‬

DRAWING TITLE ‫ناوقع قفملر‬

------- -------

FACILITY No. KF05 KF05 ‫مقر قفرملا‬

CONTRACT No. 240401073373 240401073373 ‫مقر قفعلا‬


X08-D X09-D X10-D X11-D X12-D X13-D X14-D X15-D X16-D X17-D X18-D
Drawing Status SCALE DATE ‫خيمات‬

SHOP DRAWING 22/03/2025

Partition Types Plan Part (03) APPROVED

MBF
CHECKED

Ehab
REVIEWED

Wael
DRAWN

Ehab
1 1 : 50 DRAWING No Rev

KFSC-KF05-KIC-00-ZXX-NL-XXX-XX-000XXX 00