GOPAL MAITY ESTIMATE
GOPAL MAITY ESTIMATE
Page No. -
Brick work (250m thick) with 1st class brick in cement
29 Item No - 9 Cum. 25.32 5786.00 146501.52
mortar (1:6) in foundation & Plinths.& Superstructure.
22/b
Page No. -
Brick work (125mm thick) with 1st class brick in
31 Item No- 10 Sqm. 26.32 765.00 20134.80
cement mortar (1:4) in Superstructure.
29
rolling
shutter profile type with 18 B.G . of approved
type steel latche section 75mm wide, fitted
with coil wire spring to necessiate the fitting
Page No. - of required Nos. of C.I. Pulleys on heavy type
78 Item No- 13 solid drawn arrangements both inside and Sqm. 25.85 3044 78687.40
16a outside specially builtup side guide channels
including providing a hood for the steel
rolling shutter in the room, painting two coats
of approved aluminium paint over a coat of
red lead primer complete.
Page No. - Wood work in post door & window frame rafters
85 Item No- 14 battens truss member, Purlins etc. fitted & fixed Cum. 3.2 83652.00 267686.40
1d complete.
Page No. -
Painting with synthetic animal paint on two coats.
162 Item No Sqm. 35.23 85.00 2994.55
Timber surface
-8Aaii
17
Page No.-
162 Item No- b) Steel surface two coats complete. Sqm. 31 83.00 2573.00
8(b)(il)
Page-159
Acrelic Emulsion Paint two coats complete. As
Item No.- 18 Sqm. 402.36 92.00 37017.12
Plastering item excluding net cement Paning
9(b)
SUMMARY COST
TOTAL COST OF THE BUILDING
A. Estimate for Ground floor. Rs 1937210.00
Add 15 % of grand total for Electrification &
Plumbing &Sanitary Work Rs. 290581.50
Add 3% of Contingency Charge Rs. 66833.75
Total Cost = Rs. 2294625.25
SAY = Rs. 2295000.00
( Rupees - Twenty-two Lakh Ninety-five Thousand Only)