CTDC

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
21 views9 pages

CTDC

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

Exin

CTDC
EXIN EPI Certified TIA-942 Design Consultant
QUESTION & ANSWERS

https://www.theexamslab.com/exin/CTDC-exam
QUESTION: 1

In TIA-942, which type of cabling system is commonly recommended for data centers?

Option A : Category 7
Option B : Category 6
Option C : Category 3
Option D : Category 5e

Correct Answer: A

QUESTION: 2

How does implementing access control lists (ACLs) enhance network security within a data center?

Option A : It filters incoming and outgoing traffic based on predetermined criteria


Option B : It increases server uptime
Option C : It automates software deployment
Option D : It reduces cooling costs

Correct Answer: A

QUESTION: 3

What is the significance of redundancy in power distribution systems for data centers?

Option A : Ensuring uninterrupted operation in case of power failure


Option B : Storing surplus office supplies
Option C : Providing energy-efficient lighting solutions
Option D : Using ergonomic chairs for IT staff

Correct Answer: A

QUESTION: 4

What is the role of physical access control in a data center environment?

Option A : To monitor server performance metrics


Option B : To restrict entry to authorized personnel only
Option C : To control temperature fluctuations
Option D : To regulate network bandwidth usage

Correct Answer: B

https://www.theexamslab.com/exin/CTDC-exam
QUESTION: 5

What are the advantages of using static transfer switches (STS) in data center electrical design?

Option A : They regulate voltage fluctuations within a narrow range


Option B : They enable seamless switching between power sources without interruption
Option C : They eliminate the need for backup generators
Option D : They reduce energy consumption through efficient power routing

Correct Answer: B

QUESTION: 6

What is the primary consideration when designing a mechanical system for a data center according to TIA-
942 standards?

Option A : Cable routing


Option B : Power distribution
Option C : Structural integrity
Option D : Thermal management

Correct Answer: D

QUESTION: 7

How does the implementation of intelligent power management systems optimize energy usage in data
centers?

Option A : By dynamically adjusting power distribution based on real-time demand


Option B : By disabling idle servers during off-peak hours
Option C : By upgrading outdated hardware components
Option D : By replacing traditional batteries with renewable energy sources

Correct Answer: A

QUESTION: 8

Which design approach is most effective for managing heat dissipation in large-scale data centers?

Option A : Positioning servers near windows for natural cooling


Option B : Using server racks without ventilation slots
Option C : Installing hot aisle containment systems
Option D : Painting server racks with heat-reflective paint

https://www.theexamslab.com/exin/CTDC-exam
Correct Answer: C

QUESTION: 9

When designing structured cabling for a multimedia conference room, what consideration is crucial for
supporting high-definition video streaming?

Option A : Implementing color-coded patch cords


Option B : Using plenum-rated cables for fire safety
Option C : Installing cable trays above ceiling tiles
Option D : Ensuring sufficient bandwidth and low latency

Correct Answer: D

QUESTION: 10

What is a major consideration when planning the physical layout of a data center?

Option A : Availability of software licenses


Option B : Adequate ventilation and cooling
Option C : Types of antivirus software used
Option D : Color scheme of the server racks

Correct Answer: B

QUESTION: 11

In TIA-942 standards, what is the recommended redundancy level for electrical distribution systems in Tier III
data centers?

Option A : N
Option B : 2N
Option C : N+1
Option D : 2N+1

Correct Answer: B

QUESTION: 12

What is the role of a firestop in a data center?

Option A : To prevent the spread of fire through cable openings


Option B : To optimize server performance

https://www.theexamslab.com/exin/CTDC-exam
Option C : To regulate cooling temperatures
Option D : To monitor network traffic

Correct Answer: A

QUESTION: 13

How does the design of electrical distribution circuits impact the scalability of a data center infrastructure?

Option A : It optimizes data transmission speeds between server clusters


Option B : It reduces the need for redundant power backups
Option C : It limits the number of devices that can be connected to a single circuit
Option D : It allows for the addition of new servers and equipment without disrupting existing operations

Correct Answer: D

QUESTION: 14

What is the purpose of conducting load flow analysis in electrical design for data centers?

Option A : To determine peak load


Option B : To ensure redundancy
Option C : To optimize cable routing
Option D : To calculate harmonics

Correct Answer: A

QUESTION: 15

When selecting fiber optic cables for long-distance transmission, what characteristic is most critical for
maintaining signal integrity?

Option A : Cable jacket material and color


Option B : Number of connectors per cable run
Option C : Mode and core diameter
Option D : Cable termination technique

Correct Answer: C

QUESTION: 16

Which design principle is crucial for minimizing vibration and noise in mechanical systems within a data
center environment?

https://www.theexamslab.com/exin/CTDC-exam
Option A : Shock absorption
Option B : Thermal insulation
Option C : Structural rigidity
Option D : Duct sealing

Correct Answer: C

QUESTION: 17

Explain the concept of electrical load shedding in data center management.

Option A : It aims to reduce the overall power consumption of HVAC systems


Option B : It focuses on isolating faulty servers to prevent data loss
Option C : It refers to the process of redistributing power across multiple phases
Option D : It involves prioritizing critical loads during power outages to maximize uptime

Correct Answer: D

QUESTION: 18

According to TIA-942, what is a critical consideration for data center network reliability?

Option A : Utilization of RSTP protocols


Option B : Integration of QoS mechanisms
Option C : Adoption of VLAN segmentation
Option D : Deployment of load balancers

Correct Answer: B

QUESTION: 19

What is a key advantage of following the TIA-942 standard when designing a data center?

Option A : It helps ensure reliability and uptime of critical IT services.


Option B : It increases the size of data storage capacity.
Option C : It simplifies the installation of augmented reality interfaces.
Option D : It reduces the need for cybersecurity measures.

Correct Answer: A

https://www.theexamslab.com/exin/CTDC-exam
QUESTION: 20

What is the purpose of using hot aisle containment systems in data center cooling designs?

Option A : To improve server access


Option B : To isolate hot air exhaust from servers
Option C : To maintain humidity levels
Option D : To increase noise insulation

Correct Answer: B

QUESTION: 21

What type of redundancy is crucial for ensuring uninterrupted operation in a data center's network
connectivity?

Option A : Network interface redundancy


Option B : Power supply redundancy
Option C : Cooling system redundancy
Option D : Storage redundancy

Correct Answer: A

QUESTION: 22

How does implementing a layered security approach benefit a data center's overall security posture?

Option A : It reduces energy consumption


Option B : It simplifies network management
Option C : It increases server uptime
Option D : It provides multiple lines of defense against different types of threats

Correct Answer: D

QUESTION: 23

What challenges does a data center face in ensuring compliance with global data protection regulations?

Option A : Conducting routine hardware maintenance


Option B : Navigating complex legal frameworks and ensuring data sovereignty
Option C : Increasing server density for higher performance
Option D : Deploying cloud-based storage solutions

Correct Answer: B

https://www.theexamslab.com/exin/CTDC-exam
QUESTION: 24

How does a surge protection device (SPD) contribute to the overall electrical safety of a data center?

Option A : By providing backup power in case of grid failure


Option B : By shielding data cables from electromagnetic interference
Option C : By diverting excess voltage away from sensitive equipment during transient voltage spikes
Option D : By regulating the flow of current to prevent overloads

Correct Answer: C

QUESTION: 25

Which factor is crucial when determining the number of telecommunications rooms needed in a building?

Option A : Number of computers in use


Option B : Coverage area and cabling distances
Option C : Brand of network equipment used
Option D : Availability of IT support staff

Correct Answer: B

QUESTION: 26

What is a characteristic of a converged data center network?

Option A : Limited access control policies


Option B : Unified management of storage and networking
Option C : High latency for real-time applications
Option D : Separate networks for data and voice traffic

Correct Answer: B

QUESTION: 27

Why is it crucial to implement electrical grounding and bonding in data center design?

Option A : To increase power efficiency by reducing resistive losses


Option B : To minimize heat dissipation in electrical circuits
Option C : To isolate sensitive equipment from electromagnetic interference
Option D : To protect equipment and personnel from electrical shock and discharge

Correct Answer: D

https://www.theexamslab.com/exin/CTDC-exam
QUESTION: 28

What is the purpose of a redundant power supply in data center servers?

Option A : To reduce energy consumption


Option B : To increase server storage capacity
Option C : To enhance network security
Option D : To improve fault tolerance

Correct Answer: D

QUESTION: 29

What are the key components of a disaster recovery plan for a data center?

Option A : Remote desktop access and cloud-based storage


Option B : Social engineering awareness training
Option C : Regular antivirus updates and network monitoring
Option D : Offsite data backups and redundant power supplies

Correct Answer: D