Inspection and Testing Plan (Itp)

The document outlines the Inspection and Testing Plan for upgrading Rahman Mena's Canal road in Kabul City, detailing the responsibilities of the contractor, Nimble Construction Company, and the employer, UNOPS. It specifies various testing requirements for materials such as sub-grade, sub-base, and concrete, along with acceptance criteria and testing methods. The plan is updated as of December 2, 2024, and includes references to relevant standards and documentation.

Uploaded by

olfatullahomar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views4 pages

Inspection and Testing Plan (Itp)

The document outlines the Inspection and Testing Plan for upgrading Rahman Mena's Canal road in Kabul City, detailing the responsibilities of the contractor, Nimble Construction Company, and the employer, UNOPS. It specifies various testing requirements for materials such as sub-grade, sub-base, and concrete, along with acceptance criteria and testing methods. The plan is updated as of December 2, 2024, and includes references to relevant standards and documentation.

Uploaded by

olfatullahomar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

ID–1008589

INSPECTION AND TESTING PLAN1


Upgrading of Rahman Mena's existing Canal road With Plum Concrete Surface (L=1038m) In Gozar #29, District #8,
Project Title/ Work Title
Kabul City
Contract No. 1012589

Employer UNOPS

Contractor Nimble Construction Copmpany (NCC)

Date ITP Updated 02-12-2024

ITP Number General ITP

Work Category Civil Work


Inspection/ Testing
Sub Grade, Sub- Base, Plum Concrete, PCC, CBR and FDT test and Concrete Mix Design
Item/s

1 The ITP can be tailored to suit the inspection and testing item(s) – materials, work item, process, etc.

INSPECTION AND TESTING PLAN 1 of 4 IPMG 2019


ID–1008589

Inspection and Reference/ Inspection/ Acceptance Hol Inspection/


Item Test type/ Source Testing Criteria d Testing/ Stage Frequenc Verifying Docs/ Approval Comment
No. Requirement Document Method Prin Verification y of Test/ Demonstrated by/Sign s /Status
t Responsibility Inspectio Evidence off
n
Con
Emp
tra Clie
Min Max loye
cto nt
r
r
1. Materials

1.1 Sub-grad  BoQ (AASHTO No 90% Ye E2 H W Prior to Spec Test Reports CME
 MDD  Division T 180 or s actual Division
 Gradation #4701. ASTM D Minor execution #4202
 FDT 05 1557, street at site.
 CBR ASTM D and FDT
422 & 92% on
ASTM D prepared
1556 Major and
street compacted
sub-grad
layer

1.2 Sub- Base  BoQ Project Ye E3 H W Prior to Spec Test Reports CME
 Division sec.7202 s Carried Division
 CBR test #7105. table from crash #7200
 MDD test 01 522/1, plane at
 FDT 35% site
 Gradation ASTM project.
C131, 35% And FDT
on
BS812, prepared
ASTM and
C88, compacted
ASTMC14 60% base
2, ASTM course
C127, layer.

2 E- Execute W-Witness H – Hold


3 E- Execute W-Witness H – Hold

INSPECTION AND TESTING PLAN 2 of 4 IPMG 2019


ID–1008589

ASTM D 95%
1883 &
AASHTO
T 180 or
ASTM D
1557,

1.3 Spec No 30Mp Ye E4 H W samples (3 tests Test Reports CME


Division a s taken from per
# the site. 5000
blocks)

1.4 PCC (25 Mpa) BoQ ASTM C No 25 Ye E5 H W Mix design Per Test Reports CME
and (15Mpa) Division # 39 MPA s carried out every
 Mix design 5901.01 on sample 15 Cum
of concrete and ASTM C that was
 Slump Test 5901.03 143 prior to
on site and carry from
 Temperatur 7105.01 ASTM C crash plant
e test on 1064 to the
site laboratory.
 Casting of Compressi
cylinder for ve
Compressiv strength
e Strength ASTM C test is
test 39 carried out
 Compressiv Upon
e strength pouring of
test on the concrete
lab on site

2. Work Installations

2.1

4 E- Execute W-Witness H – Hold


5 E- Execute W-Witness H – Hold

INSPECTION AND TESTING PLAN 3 of 4 IPMG 2019


ID–1008589

Prepared by Enamullah Noori QC

Approved by CME/LCME or QA/QC Team

INSPECTION AND TESTING PLAN 4 of 4 IPMG 2019