SL C360 Team Capacity - Jul'24
SL C360 Team Capacity - Jul'24
160 0 3 1
168 0 2
160 0 2 1
168 0
168 0
168 0 1
168 0 2
168 0
144 0 3
168 0
168 0 0
Planned End Date - all -
Data
Name Sum of Estimation HoursSum of Actual Hrs
Akanksha 100 110
Deepak Kumar 24 24
Jayalakshmi, Ede 112 106
Jesus Arockia Sankaran S 88 118
Karunakar 128 132
Mohammed Sadhiq Vajeer 80 66
Santanu Dutta 88 122
Saxena, Neha 56 56
(empty) 0
Total Result 676 734
Akanksha Extended View Cameras (Peripheral) SL360-2244 Implement Assign & Confirm for Extended View Cameras 2
Deepak Kumar Advanced Connect 360 VZC47353-495 Error banner is not matching for add flow 3
Job Amendments for Completed Tickets - ability to add
Jayalakshmi, Ede Advanced Connect 360 VZC47353-373 2
fees for Completed jobs and Partially Completed jobs
Jayalakshmi, Ede Advanced Connect 360 VZC47353-381 C360 Admin Tool : Service Fee (Installer/Customer) 2
Management screen
Jayalakshmi, Ede Advanced Connect 360 VZC47353-472 2
Jayalakshmi, Ede Advanced Connect 360 VZC47353-519 C360 ticket W000023940 is not generating SO 2
Update Vendor Management Admin screen to
Jayalakshmi, Ede Advanced Connect 360 VZC47353-419 show/manage International Vendors for Automatic 3
Scheduling - AUS
Update Vendor Management Admin screen to
Jayalakshmi, Ede Advanced Connect 360 VZC47353-432 show/manage International Vendors for Automatic 3
Scheduling - CAN
Jayalakshmi, Ede Advanced Connect 360 VZC47353-544 Auto Schedule throwing unexcepcted error for GBR 1
Jesus Arockia Sankaran S Advanced Connect 360 VZC47353-548 Case : Add Hardware : Create work ticket button not 2
enabled
Jesus Arockia Sankaran S Advanced Connect 360 VZC47353-545 Return Item dialog is closing while trying to select ESN 2
Jesus Arockia Sankaran S Advanced Connect 360 VZC47353-526 ESN's are getting deselected on closing the drop down- 2
Partial lost in transit flow
Jesus Arockia Sankaran S Common Task Reverse Merge Reverse merge conflicts has been resolved for July 15th N/A
relase.
Jesus Arockia Sankaran S Advanced Connect 360 VZC47353-521 Disable Grid Search as Iterim Fix for scheduling Jobs - 2
(Emergency Release)
PROD - INC0222289 - Cannot select individual ESN when
Jesus Arockia Sankaran S Advanced Connect 360 VZC47353-506 2
processing LOST IN TRANSIT in C360
Jesus Arockia Sankaran S Advanced Connect 360 VZC47353-381 Disucussing and validating the UX design's feasibily. NA
Mohammed Sadhiq Vajeer Advanced Connect 360 VZC47353-430 UX - 4. MEA - Australia - Manage Existing Appointment 4
(Reschedule, Cancel, Expand BAU)
Mohammed Sadhiq Vajeer Advanced Connect 360 VZC47353-427 MEA - Australia - Appointment Scheduling 3
Mohammed Sadhiq Vajeer Advanced Connect 360 VZC47353-546 Installed Quantity - RHI not getting updated for installed 2
items on Case page
Mohammed Sadhiq Vajeer Adhoc Tasks NA
VZC48106-369 Resolving merge conflicts for release/240919 to QA 1
Santanu Dutta SL Legacy VZC48106-370 MIP isues 5
VZC48106-360 SIT:: Driver facing camera_inboundshipment failed in
Santanu Dutta SL Legacy ENVVC24-132 1
SL2.0
Santanu Dutta SL Legacy Prod Suppoer Working on two incident 1
Santanu Dutta Telogis Access Getting access for TElogis application support 2
Device status "shipped" is in lower case Incident
Santanu Dutta SL Legacy VZC47461-390 2
INC012132781
Santanu Dutta Adhoc Tasks Prod Support
Santanu Dutta Common Task
Saxena, Neha Advanced Connect 360 VZC47353-489 CSP/CASE : Not able to schedule job in workticket 3
Saxena, Neha Advanced Connect 360 VZC47353-491 Lost in Transit : Validate address button is not enabled on 1
updating the address
Lost in Transit : Not able to create work ticket with new
Saxena, Neha Advanced Connect 360 VZC47353-492 1
address
Saxena, Neha Advanced Connect 360 VZC47353-504 UI for Backend & UX -Service Fee , vendor Fee Flag 2
Estimation Hours Actual Hrs Planned Start Date Planned End Date Type of Work
(Config /Dev /Analysis / Data)
40 45 1-Jul-24 15-Jul-24 Dev
24 24 2-Jul-24 3-Jul-24 Analysis
16 16 3-Jul-24 5-Jul-24 Analysis
Analysis the issue in env, resolved with code merge to qa for SIT bug
Analysis the issue blocked to test with other milestone failure.
Then and there I was working on this requirement gathering and grooming.
Resolved Merge conflicts between release branch and QA.
1-May-24 30-Sep-24
Data
Resource Sum of Available Hrs Sum of Utilised / Actual Worked Hrs
Akanksha 128 137
Jayalakshmi, Ede 152 164
Jesus Arockia Sankaran 128 136
Karunakar Kukunoori 152 171
Praveen Reddy 120 120
Sahithi S 120 140
Santanu Dutta 96 108
Saxena, Neha 144 156
Vajeer, Mohammed Sadhiq 136 148
Total Result 1176 1280
Resource Project No. of Working Days in June/ Available Hrs
Total Story points for Project
Jesus Arockia Sankaran Advanced Connect 360 10 80
Jesus Arockia Sankaran SL 2.0 3 24
Jesus Arockia Sankaran Adhoc Tasks (Prod Sup, Security, Tech Debt, Data Cleanup, Deployement) 3 24
Jayalakshmi, Ede Advanced Connect 360 16 128
Jayalakshmi, Ede Adhoc Tasks (Prod Sup, Security, Tech Debt, Data Cleanup, Deployement) 3 24
Saxena, Neha Advanced Connect 360 18 144
Vajeer, Mohammed Sadhiq Advanced Connect 360 17 136
Karunakar Kukunoori SL 2.0 19 152
Praveen Reddy SL 2.0 15 120
Sahithi S Adhoc Tasks (Prod Sup, Security, Tech Debt, Data Cleanup, Deployement) 10 80
Sahithi S Advanced Connect 360 5 40
Akanksha Extended View Cameras (Peripheral) 3 24
Akanksha Rev Rec 3 24
Akanksha SL 2.0 10 80
Santanu Dutta Digital Self Serve (VCCP / MIP) 5 40
Santanu Dutta Run The Business 1 8
Santanu Dutta Adhoc Tasks (Prod Sup, Security, Tech Debt, Data Cleanup, Deployement) 4 32
Santanu Dutta Contract Flex 2024 / Capex Cancellation 2 16
Utilised / Actual
Worked Hrs Remarks, If Any
88
24
24
136
28
156
148
171
120
100
40
25
26
86
45
8
35
20