VDA-FMEA Example & Format
VDA-FMEA Example & Format
4
Failure Mode and Effects Analysis (Process FMEA) Rev. No. & Dated 14 / 01.03.2020
Page No.
Company Name Customer Name Subject Process Responsibility PFMEAStart Date 05.03.2012
Manufacturing Location Model Year / Program CFT/MDT/Core Team Confidential Level PFMEA Revision Date 01.03.2020
Severity(S) of FE
2. Function of the
PFMEA Action
PFMEA Action
Occurrence (O)
Occurrence (O)
Characteristics
Characteristics
3.Process Work process item
Priority (AP)
Priority (AP)
Detection (D)
Detection(D)
1.Process Items 2.Process Steps process step and 3. Functional of the
Severity(S)
of FC/ FM
Element Function Failure Effects (FE) to the next Current Detection Target Status (Open, Action taken
Special
Special
of FC
System, Subsystem, Station number and product process work element Failure Mode (FM) Failure Cause (FC) of the work Current Prevention Prevention Responsible Completion
Man, Machine, of System, Sub higher level element and / or End controls (DC) of FC or Detection Action completion Completed, with pointer Remarks
Part element or Name of Focus characteristic and process of the process step element control (PC) of FC Action Person Name Date
Material, system, Part element user FM date Discarded) to evidence
Name of the process element ( Quantitative value characteristic
Environment etc. or Process
is optional)
Manufacturing Location Model Year / Program CFT/MDT/Core Team Confidential Level PFMEA Revision Date 01.03.2020
Severity(S) of FE
2. Function of the
PFMEA Action
PFMEA Action
Occurrence (O)
Occurrence (O)
Characteristics
Characteristics
3.Process Work process item
Priority (AP)
Priority (AP)
Detection (D)
Detection(D)
1.Process Items 2.Process Steps process step and 3. Functional of the
Severity(S)
of FC/ FM
Element Function Failure Effects (FE) to the next Current Detection Target Status (Open, Action taken
Special
Special
of FC
System, Subsystem, Station number and product process work element Failure Mode (FM) Failure Cause (FC) of the work Current Prevention Prevention Responsible Completion
Man, Machine, of System, Sub higher level element and / or End controls (DC) of FC or Detection Action completion Completed, with pointer Remarks
Part element or Name of Focus characteristic and process of the process step element control (PC) of FC Action Person Name Date
Material, system, Part element user FM date Discarded) to evidence
Name of the process element ( Quantitative value characteristic
Environment etc. or Process
is optional)
2. Ship To Plant
Loose / Tight answering at Piston
Ring Assembly
Reduce life of Pistion Ring
Improper seating in Engine Block
Sub System Engine Block More / Less clearence in Engine
Block
Engine Block Converts Chemical Loose / Tight seating of Gasket
Energy to Coolant Leakage into Crankcase
Mechanical Energy
Scratches in Engine Block
Loss of engine performance
Degradation of Engine
Performance
System Vehicle 3. End User
Prepared
Prepared By Production Engineer (M)
By Director - Operations
Signature Signature
Date Date
Document Number 3QS/FM/
of 4
Failure Mode and Effects Analysis (Process FMEA) Rev. No. & Dated
Page No.
Company Name Customer Name Subject Process Responsibility PFMEAStart Date
Manufacturing Location Model Year / Program CFT/MDT/Core Team Confidential Level PFMEA Revision Date
Severity(S) of FE
2. Function of the
PFMEA Action
PFMEA Action
Occurrence (O)
Occurrence (O)
Characteristics
Characteristics
3.Process Work process item
Priority (AP)
Priority (AP)
Detection (D)
Detection(D)
1.Process Items 2.Process Steps process step and 3. Functional of the
Severity(S)
of FC/ FM
Element Function Failure Effects (FE) to the next Current Detection Target Status (Open, Action taken
Special
Special
of FC
System, Subsystem, Station number and product process work element Failure Mode (FM) Failure Cause (FC) of the work Current Prevention Prevention Responsible Completion
Man, Machine, of System, Sub higher level element and / or End controls (DC) of FC or Detection Action completion Completed, with pointer Remarks
Part element or Name of Focus characteristic and process of the process step element control (PC) of FC Action Person Name Date
Material, system, Part element user FM date Discarded) to evidence
Name of the process element ( Quantitative value characteristic
Environment etc. or Process
is optional)
Part Element Operation Name ABC AA Man 1. In Plant AA - Under Size Man
ABC Operation No. 1 Man ----------
Machine
Method Machine Machine
Material
Environment 2. Ship To Plant
Method Method
Product DEF
DEF ----------------
Material Material
3. End User
Environment Environment
Machine Machine
2. Ship To Plant
System JKL Method Method
JKL ----------------
Material Material
3. End User
Environment Environment
Material Material
3. End User
Environment Environment
Machine Machine
2. Ship To Plant
Method Method
Material Material
3. End User
Environment Environment
Material Material
3. End User
Environment Environment
Manufacturing Location Model Year / Program CFT/MDT/Core Team Confidential Level PFMEA Revision Date
Severity(S) of FE
2. Function of the
PFMEA Action
PFMEA Action
Occurrence (O)
Occurrence (O)
Characteristics
Characteristics
3.Process Work process item
Priority (AP)
Priority (AP)
Detection (D)
Detection(D)
1.Process Items 2.Process Steps process step and 3. Functional of the
Severity(S)
of FC/ FM
Element Function Failure Effects (FE) to the next Current Detection Target Status (Open, Action taken
Special
Special
of FC
System, Subsystem, Station number and product process work element Failure Mode (FM) Failure Cause (FC) of the work Current Prevention Prevention Responsible Completion
Man, Machine, of System, Sub higher level element and / or End controls (DC) of FC or Detection Action completion Completed, with pointer Remarks
Part element or Name of Focus characteristic and process of the process step element control (PC) of FC Action Person Name Date
Material, system, Part element user FM date Discarded) to evidence
Name of the process element ( Quantitative value characteristic
Environment etc. or Process
is optional)
Prepared
Prepared By Production Engineer (M)
By Director - Operations
Signature Signature
Date Date