The site inspection reports for the Spectrum Office/BPO Building detail compliance and corrections made prior to the implementation of related works. Key findings include successful membrane inspections, compliance with approved methodologies, and rectifications of identified issues. The reports were prepared and checked by CCFG engineers and GENCON management, ensuring adherence to project standards.

Uploaded by

janice subido
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views

Sir

The site inspection reports for the Spectrum Office/BPO Building detail compliance and corrections made prior to the implementation of related works. Key findings include successful membrane inspections, compliance with approved methodologies, and rectifications of identified issues. The reports were prepared and checked by CCFG engineers and GENCON management, ensuring adherence to project standards.

Uploaded by

janice subido
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

SITE INSPECTION REPORT No.

AR - 472
Project: Spectrum Office / BPO Building From: CCFG
Inspection No: IR - SOBB - 472
To: JACMI
Location: 6F DECK @ REAR ELEV.

Date: 13-May-25 Time: 08:58:00 PM

Items below are corrected / comply prior to implementation of related works.

1 . CCFG CQC Team conducted pre-inspection prior to scheduled inspection request .


2 . Structure is water flooded within 7 days duration as required.
3 . Inspection is for the membrane checking only not for concrete topping
4 . Complied.
5 . Rectified and reinspected
6 . Rectified . Comment is redundant
7 . Are you referring to joints or the level? Rectification done.
8 . Rectification done
9 . Proper sequence of work are ensured as per approved methodology.
10 . Materials are monitored as per approved .

Prepared by:
REMARKS:
CCFG - Engineer

Checked by: Noted by:

JANICE J. SUBIDO ZHENG XIAOLONG


GENCON-Const.Manager GENCON- Project Manager

Received by:
SITE INSPECTION REPORT No. AR - 472-A
Project: Spectrum Office / BPO Building From: CCFG
Inspection No: IR - SOBB - 472-A
To: JACMI
Location: 6F DECK @ REAR ELEV.

Date: 13-May-25 Time: 08:58:00 PM

Items below are corrected / comply prior to implementation of related works.

1 . CCFG CQC Team conducted pre-inspection prior to scheduled inspection request .


2 . Inspection is for the membrane checking only not for concrete topping
3 . Area was submerged 7 days. Dewatered for membrane inspection. Flood Testing is done .
4 . Complied and ensured.
5 . Complied.
6 . Rectified and complied.
7 . Complied and ensured.
8 . Complied.
9 . Complied and ensured.
10 . Materials are monitored as per approved used in rectification

Prepared by:
REMARKS:
CCFG - Engineer

Checked by: Noted by:

JANICE J. SUBIDO ZHENG XIAOLONG


GENCON-Const.Manager GENCON- Project Manager

Received by:
SITE INSPECTION REPORT No. AR - 489
Project: Spectrum Office / BPO Building From: CCFG
Inspection No: IR - SOBB - 489
To: JACMI
Location: 5F-6F STAIR-2

Date: 08-May-25 Time: 08:58:00 PM

Items below are corrected / comply prior to implementation of related works.

1 . CCFG CQC Team conducted pre-inspection prior to scheduled inspection request .


2 . Area coverage as indicated is ready for inspection
3 . All balances identified during inspection were complied
4 . Nosing alignment and proper placement were ensured
5 . Stair baluster supports were ensured and as per approved shop drawing
6 . Application of epoxy primer completion were complied
7 . Unpolished handrail brackets support will be rectified prior to final paint application
8 . Stair railing clearance cannot reached 1.40 but the stair landing is 1.40m
9 . Voids on welding works were rectified.
10 . No welding connection on the shearwall rebars.
11 . Layout and reference used as per approved shop drawings
12 . Materials used as per compliance with the approved submittals

Prepared by:
REMARKS:
CCFG - Engineer

Checked by: Noted by:

JANICE J. SUBIDO ZHENG XIAOLONG


GENCON-Const.Manager GENCON- Project Manager

Received by:
SITE INSPECTION REPORT No.
Project: From:
Inspection No:
To:
Location:

Date: Time:

Items below are corrected / comply prior to implementation of related works.

Prepared by:
REMARKS:
CCFG - Engineer

Checked by: Noted by:

GENCON-Const.Manager GENCON- Project Manager

Received by: