The document outlines the direct costs associated with various construction items and materials for a project, including the construction of a field office, permits, safety measures, and structural components. It lists quantities and units for each item, such as concrete, steel, plumbing, and electrical works. The document serves as a detailed cost estimate for the construction project.

Uploaded by

Danilo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views1 page

Summary Item Quantity

The document outlines the direct costs associated with various construction items and materials for a project, including the construction of a field office, permits, safety measures, and structural components. It lists quantities and units for each item, such as concrete, steel, plumbing, and electrical works. The document serves as a detailed cost estimate for the construction project.

Uploaded by

Danilo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

DIRECT COST

ITEM NO. DESCRIPTION QTY. UNIT


MATERIAL

A.1.1 (3) Construction of Field Office for the Engineer 1.00 l.s. ###

B.3 (1) Permits and Clearances - l.s. ###

B.5 (1) Project Billboard / Signboard 2.00 ea ###

B.7 (1) Occupational Safety and Health 1.00 l.s. ###

801 (1) Removal of Structures and Obstruction 1.00 l.s. ###

803 (2)a Building Excavation (Common Soil) 5.67 cu.m.###

804 (1)a Embankment from Roadway / Structure Excavation (Common Soil) 3.70 cu.m.###

804 (2)a Embankment from Borrow (Common Soil) 0.07 cu.m.

804 (7) Gravel Fill 0.23 cu.m.###

900 (1)c Structural Concrete (3,000 psi, Class A, 28 days) 16.00 cu.m.###

902 (1)a1 Reinforcing Steel (Deformed), Grade 40 2,822.46 kg ###

903 (1) Formworks and Falseworks 1.00 l.s. ###

1003 (1)a1Ceiling (4.5 mm, Metal Frame, Fiber Cement Board) - sq.m.###

1004 (2) Finishing Hardware 1.00 l.s. ###

1007 (2) Aluminum Framed Glass Door - l.s.

1008 (2) Aluminum Glass Windows - l.s. ###

1010 (4) Wooden Doors and Windows 1.00 l.s. ###

1043 (3) PVC Doors and Frames 1.00 l.s. ###

1046 (2)a1CHB Non-Load Bearing (including Reinforcing Steel), 100 mm 24.08 sq.m.###

1046 (2)a2CHB Non-Load Bearing (including Reinforcing Steel), 150 mm 107.50 sq.m.###

1027 (1) Cement Plaster Finish 211.00 sq.m.###

1032 (1)a Painting Works (Masonry / Concrete) - sq.m.###

1032 (1)b Painting Works (Wood) - sq.m.###

1032 (1)c Painting Works (Steel) - sq.m.###

1018 (1) Glazed Tiles and Trims - sq.m.###

1018 (2) Unglazed Tiles - sq.m.###

1013 (2)c Fabricated Metal Roofing Accessory [Gauge 24 (0.701 mm), Gutters] 10.00 ln.m.###

1013 (2)b Fabricated Metal Roofing Accessory [Gauge 26 (0.551 mm), Flashing] 10.00 ln.m.###

1014 (1)a2Pre-painted Metal Sheets (Above 0.427 mm, Corrugated, Long Span) 35.88 sq.m###

1047 (8)a Structural Steel (Trusses) 460.20 kg ###

1047 (8)b Structural Steel (Purlins) 276.00 kg ###

1051 (1)a Railing 1.00 l.s ###

1001 (5)b Catch Basin (CHB) 3.00 each###

1001 (8) Sewer Line Works 1.00 l.s. ###

1001 (9) Storm Drainage and Downspout 1.00 l.s. ###

1001 (11) Septic Vault/Tank (Concrete/CHB) 1.00 l.s. ###

1002 (4) Plumbing Fixtures 1.00 l.s. ###

1002 (27) Plumbing Works 1.00 l.s. ###

1100 (10) Conduit, Boxes, and Fittings ( Conduit Works/Conduit Rough-In) 1.00 l.s. ###

1101 (33) Wires and Wiring Devices 1.00 l.s. ###

1102 (1) Panelboard with Main & Branch Breakers 1.00 l.s. ###

1103 (1) Lighting Fixtures 1.00 l.s. ###

1106 (1) CCTV System - l.s. ###

1200 (13)aAir Conditioning System (Package/Split Type) - l.s. ###

Page 1 of 1