EXECUTION OF WORK
o ALL DIMENSION INDICATED ON THE DRAWINGS ARE IN FEET/INCH
U.N.O. ( UNLESS NOTED OTHERWISE ).
COLUMN REINF. DETAIL AT GROUND FLOOR LEVEL o DO NOT SCALE ANY DIMENSIONS. FOLLOW WRITTEN DIMENSIONS ONLY.
o BEFORE COMMENCEMENT OF WORK IN ANY AREA THE CONTRACTOR
SHALL SUBMIT A SCHEME OF CONCRETING INDICATING CONSTRUCTION JOINTS
FOR THE APPROVAL OF THE ENGINEER - IN - CHARGE AS A GUIDE.
d Permitted Not permitted o ANY DISCREPANCY OR DOUBTS ARISING FROM THE STUDY OF ALL RELEVANT
c c DRAWINGS SHALL BE BROUGHT TO THE NOTICE OF THE ENGINNER - IN - CHARGE
Typ. section showing location FOR CLARIFICATION BEFORE COMMENCEMENT OF CONCRETING.
a a a a of lapping bars in columns o THE CONTRACTOR SHALL FULLY SATISFY AND OBTAIN PRIOR APPPROVAL OF THE
b b ENGINEER - IN - CHARGE REGARDING ALL ASPECTS OF THE SPECIFICATION WORK
b b MAN SHIP AND ISI STANDARDS BEFORE COMMENCEMENT AND PLACEMENT OF ALL
1'-0"
a a
9"
9"
b b
c c b b
F/T.FLR
d COVER
COLUMN, C1 COLUMN, C2 COLUMN, C3 COLUMN, C4 CLEAR COVER TO REINFORCEMENT SHALL BE AS FOLLOWS :
10#- 20MM+ 02#- 16MM 08#- 20MM+ 02#- 16MM 08#- 20MM 04#- 20MM+ 04#- 16MM o SLABS = 25 MM. OR DIA OF BAR WHICHEVER
STP 8MM@4"C/C L/4 &7"C/C MID STP 8MM@4"C/C L/4 &7"C/C MID STP 8MM@4"C/C L/4 &7"C/C MID STP 8MM@4"C/C L/4 &7"C/C MID o BEAMS - LONGITUDINAL BAR = GREATER OF 35 OR THE BAR DIAMETER
WHICH EVER IS GREATER.
o WALLS ( GENERAL )
VERTICAL BAR = 25 MM.
SHEAR ZONE
o WALLS (EARTH RETAINING)
VERTICAL BAR = 25 MM. FOR FACE OF WALL IN CONTACT WITH EARTH.
8/10MM@
4"/5"C/C
o FOOTINGS = 50 MM.
(L/4)
50*DIA TWO LAP EDGE MIN.1'-0"
RAFT = 75 MM.
a a a a o COLUMNS VERTICAL BAR =40 MM. + DIA OF LINK
b b b b LINKS = 40 MM.
o WATER TANK
WATER FACE = 30 OR DIA OF LONGITUDINAL BAR
9"
9"
9"
8/10MM@6"/7"C/C
b b b b LAPS
o DO NOT LAP MORE THAN 33 % OF THE BARS AT ANY ONE SECTION.
o EMBEDEMENT LENGTH OF BEAM BARS WITHIN END COLUMN SHALL BE
COLUMN, C5 COLUMN, C6 COLUMN, C7 COLUMN, C8 Ld+10 X DIA OF REINFORCEMENT U.N.O.
o REINFORCEMENT BARS IN THE PATH OF AN OPENING IN THE SLAB SHALL BE
08#- 16MM 08#- 16MM 04#- 16MM+ 04#- 12MM 04#- 16MM+ 06#- 12MM CURTAILED AT THE OPENING AND THE NUMBER OF BARS , SO CURTAILED SHALL
BE PLACED ON EITHER SIDE OF THE OPENING UNLESS OTHERWISE SHOWN ON
STP 8MM@4"C/C L/4 &7"C/C MID STP 8MM@4"C/C L/4 &7"C/C MID STP 8MM@5"C/C L/4 &7"C/C MID STP 8MM@5"C/C L/4 &7"C/C MID THE DRAWINGS.
SHEAR ZONE
STIRRUPS SPACER BAR
8/10MM@
4"/5"C/C
AS/DETAIL o 16MM OR DIA OF LARGER OF MAIN REINFORCEMENT WHICHEVER IS HIGHER.
(L/4)
d
c c CONCRETE MIX - M25 . U.N.O.
o RAFT = M25
a a a a o FOOTINGS = M25
GRD.FLR o BASE SLAB = M25 NOTE :-
b b b b o RETAINING WALL = M25 'M' REFERS TO MIX AND THE NUMBERS
o COL. UP TO GR. LVL. TO THE SPECIFIED CHARACTERISTIC
AS / COLUMN
COMPRESSIVE STRENGTH OF 15-CM CUBE
o COL. ABOVE GR. LVL. SCHEDULE
2'-0" 1'-6" 1'-6" 1'-6" AT 28 DAYS EXPRESSED IN N /MM ²
o BEAM AND SLAB =M25
a a
1'-0"
1'-0"
9"
b b RELEVANT DRAWINGS.
c c b b
SHEAR ZONE
o WATER SEAL AS APPROVED BY ENGINEER - IN - CHARGE IS TO BE PLACED AT ALL
d CONSTRUCTION JOINTS.
o THE CONTRACTOR SHALL PROVIDE SHEAR KEYS IN THE HORIZONTAL JOINTS &
8/10MM@
COLUMN, C1 COLUMN, C2 COLUMN, C3 COLUMN, C4
4"/5"C/C
(L/4)
CONSTRUCTION JOINTS.
06#- 20MM+ 04#- 16MM 04#- 20MM+ 06#- 16MM 04#- 20MM+ 04#- 16MM 04#- 20MM+ 04#- 16MM o THE CONTRACTOR SHALL CAST THE ALTERNATE PANEL OF RETAINING WALL
INSTEAD OF CASTING THE FULL LENGTH OF THE WALL CONTINUOUSLY.
STP 8MM@4"C/C L/4 &7"C/C MID STP 8MM@4"C/C L/4 &7"C/C MID STP 8MM@4"C/C L/4 &7"C/C MID STP 8MM@4"C/C L/4 &7"C/C MID o NO BACK FILLING IS TO BE DONE TILL THE SUSPENDED SLAB AT HIGHER LEVEL
HAS BEEN CAST .
AS/ARCH DWG
o IN SHEAR WALLS, ALL SPLICES IN HORIZONTAL REINF. SHALL BE STAGGERED
SPLICES IN TWO CURTAINS WHERE USED SHALL NOT OCCUR IN THE SAME
LOCATION .
o WATER PROOFING AS PER SPECIFICATIONS SHALL BE APPLIED ON WALL & SLABS
a a a a AS FOLLOWING.
INSIDE FOR OVERHEAD WATER TANK.
b b b b INSIDE & OUTSIDE FOR UNDER GROUND WATER TANK / SEPTIC TANK.
8/10MM@6"/7"C/C
OUTSIDE FOR RETAINING WALL
BOTTOM FOR RAFT.
o R/F STEEL SHALL BE TMT BARS OF GRADE FY 550D.
1'-6" 1'-6" 1'-6" 1'-6"
COLUMNS
a a a a
9"
9"
9"
9"
PLINTH HT.
* Props to slabs :
AS/ARCH
SHEAR ZONE
Spanning upto 4.5 M. = 7 days
DWG
Spanning over 4.5 M. = 14 days
FOUNDATION LEVEL
(L/4)
* Props to Beams:
Spanning upto 6.0 M. = 14 days
8/10MM@
Spanning over 6.0 M. = 21 days
TYP.SECTIONAL DETAIL
4"/5"C/C
The de-shuttering time may be increased by 25% in cold weather.
(REINF. ARRANGEMENT AT JOITN) WATER PROOFING:-
FOUNDATION
AS PER SPECIFICATION GIVEN IN TENDERS/ARCH. DRAWING.
DEPTH
REBAR ANCHOR SEISMIC ZONE:- IV
45XØ 45XØ
1'-0"
13
BAR Ld=50XD
REBAR FOUNDATION DESIGN FOR G+2
5°
TENSILE
50xDIA
10
TILTING,45°
*Ø
ZONE
Ld
STRUCTURAL CONSULTANTS
AT GY AXIS
VMSS CONSULTANTS
Engineers, Structural, Designer, Valuer & Project Consultants