The document outlines structural notes for construction, emphasizing the importance of following specified dimensions, obtaining approvals for work schemes, and adhering to reinforcement details for various structural elements. It specifies concrete mix requirements, clear cover dimensions, and guidelines for formwork stripping times. Additionally, it includes waterproofing specifications and seismic zone considerations for the foundation design of a G+2 structure.

Uploaded by

jitendra ahirwal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views1 page

Gaurav Ji Str-model.pdf5

The document outlines structural notes for construction, emphasizing the importance of following specified dimensions, obtaining approvals for work schemes, and adhering to reinforcement details for various structural elements. It specifies concrete mix requirements, clear cover dimensions, and guidelines for formwork stripping times. Additionally, it includes waterproofing specifications and seismic zone considerations for the foundation design of a G+2 structure.

Uploaded by

jitendra ahirwal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

STRUCTURAL NOTES :-

EXECUTION OF WORK
o ALL DIMENSION INDICATED ON THE DRAWINGS ARE IN FEET/INCH
U.N.O. ( UNLESS NOTED OTHERWISE ).
COLUMN REINF. DETAIL AT GROUND FLOOR LEVEL o DO NOT SCALE ANY DIMENSIONS. FOLLOW WRITTEN DIMENSIONS ONLY.
o BEFORE COMMENCEMENT OF WORK IN ANY AREA THE CONTRACTOR
SHALL SUBMIT A SCHEME OF CONCRETING INDICATING CONSTRUCTION JOINTS
FOR THE APPROVAL OF THE ENGINEER - IN - CHARGE AS A GUIDE.
d Permitted Not permitted o ANY DISCREPANCY OR DOUBTS ARISING FROM THE STUDY OF ALL RELEVANT
c c DRAWINGS SHALL BE BROUGHT TO THE NOTICE OF THE ENGINNER - IN - CHARGE
Typ. section showing location FOR CLARIFICATION BEFORE COMMENCEMENT OF CONCRETING.
a a a a of lapping bars in columns o THE CONTRACTOR SHALL FULLY SATISFY AND OBTAIN PRIOR APPPROVAL OF THE
b b ENGINEER - IN - CHARGE REGARDING ALL ASPECTS OF THE SPECIFICATION WORK
b b MAN SHIP AND ISI STANDARDS BEFORE COMMENCEMENT AND PLACEMENT OF ALL

o THE CONTRACTOR SHOULD NOT BE PERMITTED TO INSTALL CONDUITS, PIPES,


2'-0" 1'-6" 1'-6" 1'-6" DUCTS, SLEEVES OR ANY CUTTING WORK THAT ARE NOT SHOWN ON THE PLANS
OR NOT APPPROVED BY THE ENGINEER OR ARCHITECT.
a a WORK IN FINAL POSITION.
1'-0"

1'-0"
a a

9"

9"
b b
c c b b
F/T.FLR
d COVER
COLUMN, C1 COLUMN, C2 COLUMN, C3 COLUMN, C4 CLEAR COVER TO REINFORCEMENT SHALL BE AS FOLLOWS :

10#- 20MM+ 02#- 16MM 08#- 20MM+ 02#- 16MM 08#- 20MM 04#- 20MM+ 04#- 16MM o SLABS = 25 MM. OR DIA OF BAR WHICHEVER

STP 8MM@4"C/C L/4 &7"C/C MID STP 8MM@4"C/C L/4 &7"C/C MID STP 8MM@4"C/C L/4 &7"C/C MID STP 8MM@4"C/C L/4 &7"C/C MID o BEAMS - LONGITUDINAL BAR = GREATER OF 35 OR THE BAR DIAMETER
WHICH EVER IS GREATER.
o WALLS ( GENERAL )
VERTICAL BAR = 25 MM.

SHEAR ZONE
o WALLS (EARTH RETAINING)
VERTICAL BAR = 25 MM. FOR FACE OF WALL IN CONTACT WITH EARTH.

8/10MM@
4"/5"C/C
o FOOTINGS = 50 MM.

(L/4)
50*DIA TWO LAP EDGE MIN.1'-0"
RAFT = 75 MM.
a a a a o COLUMNS VERTICAL BAR =40 MM. + DIA OF LINK
b b b b LINKS = 40 MM.
o WATER TANK
WATER FACE = 30 OR DIA OF LONGITUDINAL BAR

LAP ZONE GAP BETWEEN


WHICHEVER IS GREATER
1'-6" 1'-6" 1'-6" 1'-6" DRY FACE = 25 MM. OR DIA OF BAR WHICHEVER IS GREATER.
o END OF BAR = 50 MM. OR 2 DIA OF LARGE BAR
a a a a
9"

9"

9"

9"

8/10MM@6"/7"C/C
b b b b LAPS
o DO NOT LAP MORE THAN 33 % OF THE BARS AT ANY ONE SECTION.
o EMBEDEMENT LENGTH OF BEAM BARS WITHIN END COLUMN SHALL BE
COLUMN, C5 COLUMN, C6 COLUMN, C7 COLUMN, C8 Ld+10 X DIA OF REINFORCEMENT U.N.O.
o REINFORCEMENT BARS IN THE PATH OF AN OPENING IN THE SLAB SHALL BE
08#- 16MM 08#- 16MM 04#- 16MM+ 04#- 12MM 04#- 16MM+ 06#- 12MM CURTAILED AT THE OPENING AND THE NUMBER OF BARS , SO CURTAILED SHALL
BE PLACED ON EITHER SIDE OF THE OPENING UNLESS OTHERWISE SHOWN ON
STP 8MM@4"C/C L/4 &7"C/C MID STP 8MM@4"C/C L/4 &7"C/C MID STP 8MM@5"C/C L/4 &7"C/C MID STP 8MM@5"C/C L/4 &7"C/C MID THE DRAWINGS.

FOR SUPER STRUCTURE


o AVOID LAPS IN BOTTOM BARS NEAR MID SPAN.
o AVOID LAPS IN TOP BARS NEAR SUPPORTS.

COLUMN REINF. DETAIL AT FIRST & SECOND FLOOR LEVEL

SHEAR ZONE
STIRRUPS SPACER BAR

8/10MM@
4"/5"C/C
AS/DETAIL o 16MM OR DIA OF LARGER OF MAIN REINFORCEMENT WHICHEVER IS HIGHER.

(L/4)
d
c c CONCRETE MIX - M25 . U.N.O.
o RAFT = M25
a a a a o FOOTINGS = M25
GRD.FLR o BASE SLAB = M25 NOTE :-
b b b b o RETAINING WALL = M25 'M' REFERS TO MIX AND THE NUMBERS
o COL. UP TO GR. LVL. TO THE SPECIFIED CHARACTERISTIC
AS / COLUMN
COMPRESSIVE STRENGTH OF 15-CM CUBE
o COL. ABOVE GR. LVL. SCHEDULE
2'-0" 1'-6" 1'-6" 1'-6" AT 28 DAYS EXPRESSED IN N /MM ²
o BEAM AND SLAB =M25
a a
1'-0"

1'-0"

a a o THE CONTRACTOR SHALL PROVIDE AN EXPANSION JOINT AS INDICATED IN THE


9"

9"
b b RELEVANT DRAWINGS.
c c b b

SHEAR ZONE
o WATER SEAL AS APPROVED BY ENGINEER - IN - CHARGE IS TO BE PLACED AT ALL
d CONSTRUCTION JOINTS.
o THE CONTRACTOR SHALL PROVIDE SHEAR KEYS IN THE HORIZONTAL JOINTS &

8/10MM@
COLUMN, C1 COLUMN, C2 COLUMN, C3 COLUMN, C4

4"/5"C/C
(L/4)
CONSTRUCTION JOINTS.
06#- 20MM+ 04#- 16MM 04#- 20MM+ 06#- 16MM 04#- 20MM+ 04#- 16MM 04#- 20MM+ 04#- 16MM o THE CONTRACTOR SHALL CAST THE ALTERNATE PANEL OF RETAINING WALL
INSTEAD OF CASTING THE FULL LENGTH OF THE WALL CONTINUOUSLY.
STP 8MM@4"C/C L/4 &7"C/C MID STP 8MM@4"C/C L/4 &7"C/C MID STP 8MM@4"C/C L/4 &7"C/C MID STP 8MM@4"C/C L/4 &7"C/C MID o NO BACK FILLING IS TO BE DONE TILL THE SUSPENDED SLAB AT HIGHER LEVEL
HAS BEEN CAST .

GROUND FLOOR HT.


o DON'T PLACE BACKFILL BEHIND RETAINING WALL BEFORE CONCRETE HAS
ATTAIN ITS FULL STRENGTH.

AS/ARCH DWG
o IN SHEAR WALLS, ALL SPLICES IN HORIZONTAL REINF. SHALL BE STAGGERED
SPLICES IN TWO CURTAINS WHERE USED SHALL NOT OCCUR IN THE SAME
LOCATION .
o WATER PROOFING AS PER SPECIFICATIONS SHALL BE APPLIED ON WALL & SLABS
a a a a AS FOLLOWING.
INSIDE FOR OVERHEAD WATER TANK.
b b b b INSIDE & OUTSIDE FOR UNDER GROUND WATER TANK / SEPTIC TANK.

8/10MM@6"/7"C/C
OUTSIDE FOR RETAINING WALL
BOTTOM FOR RAFT.
o R/F STEEL SHALL BE TMT BARS OF GRADE FY 550D.
1'-6" 1'-6" 1'-6" 1'-6"
COLUMNS
a a a a
9"

9"

9"

9"

o SPLICING AS PER SKETCHES


b b b b FORM WORK
THE FORM WORK SHALL BE STRIPPED AS PER THE FOLLOWING TIME TABLE.
COLUMN, C5 COLUMN, C6 COLUMN, C7 COLUMN, C8 THE TIME SHALL BE COUNTED FROM THE FINISHING OF CASTING:
i) Vertical form work to column, wall, beams = 16 - 24 hours.
04#- 16MM+ 04#- 12MM 04#- 16MM+ 04#- 12MM 04#- 16MM+ 04#- 12MM 04#- 16MM+ 06#- 12MM ii) Bottoms of slab (props to be refixed) = 3 days.
iii) Bottoms of beam (props to be refixed) = 7 days.
STP 8MM@4"C/C L/4 &7"C/C MID STP 8MM@4"C/C L/4 &7"C/C MID STP 8MM@5"C/C L/4 &7"C/C MID STP 8MM@5"C/C L/4 &7"C/C MID iv) Props to be removed:

PLINTH HT.
* Props to slabs :

AS/ARCH

SHEAR ZONE
Spanning upto 4.5 M. = 7 days

DWG
Spanning over 4.5 M. = 14 days
FOUNDATION LEVEL

(L/4)
* Props to Beams:
Spanning upto 6.0 M. = 14 days

8/10MM@
Spanning over 6.0 M. = 21 days
TYP.SECTIONAL DETAIL

4"/5"C/C
The de-shuttering time may be increased by 25% in cold weather.
(REINF. ARRANGEMENT AT JOITN) WATER PROOFING:-

FOUNDATION
AS PER SPECIFICATION GIVEN IN TENDERS/ARCH. DRAWING.

DEPTH
REBAR ANCHOR SEISMIC ZONE:- IV
45XØ 45XØ
1'-0"

13

BAR Ld=50XD
REBAR FOUNDATION DESIGN FOR G+2

TENSILE
50xDIA

10

TILTING,45°

ZONE
Ld

STRUCTURAL CONSULTANTS
AT GY AXIS
VMSS CONSULTANTS
Engineers, Structural, Designer, Valuer & Project Consultants
(B)

STIRRUPS SPACING IN LAP


IR= 4Ø MIN,16Ø MAX PORTION 8mm@150C/C OR LONGITUDINAL LXB(AS/FOOTING
(6Ø PREFERABALE) AS PER SCHEDULE WHICH
REINF. (L) DETAIL) LIVE LOAD :- SHEET NO. :- SIGN & STAM. :-
IS SMALLER
2.0KN / SQ .M 05
DUCTILITY ARRANGEMENT OF STIRRUPS IN COLUMNS
BEAM DEVELOPMENT LENGTH DETAIL TYPICAL LAP SPLICE IN BEAMS REBAR LAPING/BENDING DETAIL STIRRUPS INTERLOCKING DETAIL
& TYP. SECTION OF COMBINED & FOOTING S.B.C. TAKEN :- REV. DATE :-
100.00KN / SQ .M 02.05.2025