Borrow Pits Process

The document outlines the process for identifying and approving new borrow pits by the contractor/project team, which includes checking material suitability and completing a site selection checklist. The request is then verified by the contract holder and submitted to MSE24N for environmental checks, followed by a site survey conducted by the Geomatics team. Upon approval of the locations by MSE24N, the contract holder receives the necessary environmental requirements to proceed.

Uploaded by

Riyas Mangodan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views1 page

Borrow Pits Process

The document outlines the process for identifying and approving new borrow pits by the contractor/project team, which includes checking material suitability and completing a site selection checklist. The request is then verified by the contract holder and submitted to MSE24N for environmental checks, followed by a site survey conducted by the Geomatics team. Upon approval of the locations by MSE24N, the contract holder receives the necessary environmental requirements to proceed.

Uploaded by

Riyas Mangodan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Borrow Pits Identification and Approval Process

New borrow pit required

Contractor/ Project Team:


Identify borrow pit proposed The contractor/ Project Team shall check
I the material suitability & quantity
locations

Contractor/ Project Team:


Complete borrow pit site Borrow pit s ite selection che cklist
selection checklist
Contractor/ Project Team:
Send the request to the Contract I Attach the Borrow pit site selection che cklist
Holder

Contract Holder:
Verify the request & submit it to I Attach the Borrow pit s ite selection che cklist
MSE24N

MSE24N:
Check the environmental aspects
of the selected locations

No locations suitable ?
Yes

MSE24N:
Reply back to the Contract
Holder with location
confirmation

Contract Holder: Input


http://mus-ws-244/GeOpSysV2/GeOpSys/
Default.aspx
Initiate online survey work
request to Geomatics (XGG
team-Survey Ops)
Geomatics (XGG team): - Mark borrow pits locations
Carry out site survey - Record locations surface level

Geomatics (XGG team):


Update PDO corporate spatial DB
(GIS) & provide final co-ordinates
in PSD93

Geomatics (XGG team):


Send notification on work I Inclu de MSE24 in the notification loop
completion attaching to it
coordinates in PSD93

MSE24N:
Review boundary coordinates in
PDO earth & approve the locations

No locations approved?
Yes

MSE24N:
Send the approval to the
Contract Holder & provide the
environmental requirement

End