NB
LSTK contractor to obtain PMC's prior approval on Level
Calculations of all EFR Tanks for confirmation wrt cylindrical
height before indicating any change wrt ITB MDS.
SIZE AND QUANTITY
SHOULD BE CONFIRMED
WITH ROOF DRAIN
VENDOR
UPDATE ALL THE LEVELS AS
PER APPROVED LEVEL
Tanks for confirmation wrt cylindrical height
CALCULATION
before indicating any change wrt ITB MDS.
approval on Level Calculations of all EFR
LSTK contractor to obtain PMC's prior
UPDATE AS PER APPROVED
DESIGN CALCULATION
ALIGN BOTH THE
STATEMENTS
IS 2062 E250 GR. A
-TYPICAL FOR ALL
PLACES
UPDATE
THE THK
AS PER
FINAL
DESIGN
CALCULATI
ON
LSTK to first submit the
resolution wrt PMC
comments vide CRS sheet
and after receipt of PMC's
feedback wrt CRS
Sheet,LSTK to submit the
revised documents.
maintained as per note 12 of
Min thicknesses shall be
12-02-2022
ITB MDS.
UPDATE AS PER APPROVED
DESIGN CALCULATION
PLUS SEISMIC SLOSHING WAVE HEIGHT
REV 5
LSTK contractor to obtain PMC's prior approval on Level
Calculations of all EFR Tanks for confirmation wrt cylindrical height
before indicating any change wrt ITB MDS.