0% found this document useful (0 votes)
26 views1 page

Epcc11-Ail-301-Sta-Dwg-000-0085 - 01

The LSTK contractor must secure prior approval from PMC on Level Calculations for all EFR Tanks to confirm cylindrical height before making any changes related to ITB MDS. Additionally, all levels should be updated according to the approved design calculations, and the minimum thicknesses must be maintained as specified. The contractor is required to submit resolutions regarding PMC comments and revised documents following feedback.

Uploaded by

9893203028
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views1 page

Epcc11-Ail-301-Sta-Dwg-000-0085 - 01

The LSTK contractor must secure prior approval from PMC on Level Calculations for all EFR Tanks to confirm cylindrical height before making any changes related to ITB MDS. Additionally, all levels should be updated according to the approved design calculations, and the minimum thicknesses must be maintained as specified. The contractor is required to submit resolutions regarding PMC comments and revised documents following feedback.

Uploaded by

9893203028
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

NB

LSTK contractor to obtain PMC's prior approval on Level


Calculations of all EFR Tanks for confirmation wrt cylindrical
height before indicating any change wrt ITB MDS.

SIZE AND QUANTITY


SHOULD BE CONFIRMED
WITH ROOF DRAIN
VENDOR

UPDATE ALL THE LEVELS AS


PER APPROVED LEVEL
Tanks for confirmation wrt cylindrical height

CALCULATION
before indicating any change wrt ITB MDS.
approval on Level Calculations of all EFR
LSTK contractor to obtain PMC's prior

UPDATE AS PER APPROVED


DESIGN CALCULATION

ALIGN BOTH THE


STATEMENTS

IS 2062 E250 GR. A


-TYPICAL FOR ALL
PLACES

UPDATE
THE THK
AS PER
FINAL
DESIGN
CALCULATI
ON
LSTK to first submit the
resolution wrt PMC
comments vide CRS sheet
and after receipt of PMC's
feedback wrt CRS
Sheet,LSTK to submit the
revised documents.
maintained as per note 12 of
Min thicknesses shall be

12-02-2022
ITB MDS.

UPDATE AS PER APPROVED


DESIGN CALCULATION

PLUS SEISMIC SLOSHING WAVE HEIGHT

REV 5

LSTK contractor to obtain PMC's prior approval on Level


Calculations of all EFR Tanks for confirmation wrt cylindrical height