Major & Medium Schemes

The document outlines various irrigation schemes funded by the state and external agencies, detailing their costs, objectives, and the districts benefited. Key projects include the Nabakrushna Choudhury Secha Unnayan Yojana and the Water Sector Infrastructure Development Programme, aimed at improving irrigation capacity and efficiency. The document also highlights ongoing and completed projects, emphasizing the creation of irrigation potential and the revival of agricultural land across multiple districts in Odisha.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views4 pages

Major & Medium Schemes

The document outlines various irrigation schemes funded by the state and external agencies, detailing their costs, objectives, and the districts benefited. Key projects include the Nabakrushna Choudhury Secha Unnayan Yojana and the Water Sector Infrastructure Development Programme, aimed at improving irrigation capacity and efficiency. The document also highlights ongoing and completed projects, emphasizing the creation of irrigation potential and the revival of agricultural land across multiple districts in Odisha.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Total Cost Scheme Outcome

Sl No. Name of the Scheme Source of funding Projects Taken up/ Ongoing Status Objective District Benifited
(in Crores) Duration (upto Jan-2022)
* Extension Works: i.To revive the lost ayacut by restoring the
Harabhangi Extension On going irrigation system to its designed capacity.
Gobindpur barrage On going
Nuagaon Distributary of Rushikulya Irr. ii.To increase irrigation area of some selected
On going
System projects beyond designed capacity
Kharkhara Irrigtaion Project Not taken up
Dhusuma Barrage Not taken up iii.Equitable distribution of water and full
Birupa Genguti Completed utilization of designed irrigation capacity.
* Modernization Works:
Potteru Completed
Satiguda Completed
Dadaraghati ( RMC RD 00 to 985m) Completed
Sapua ( Link Channel) Completed
Bhairpur Branch canal ( Rengali Irr. Cuttack, Jajpur,
Completed
Project) Kendrapara,
369 Ha. ayacut newly created.
Nabakrushna Choudhury Hariharjore( Damaged Structure of main Bhadrak,Jagatsingpur,
State Funded Completed 2017-18 to 43781 Ha. ayacut revived.
1 secha Unnayan Yojana. 635.00 Canal) puri, Angul, Dhekanal,
Scheme 2019-20 TOTAL- 44150 Ha.
(NCSUY) Hariharjore(Sardhapalli, Champamal kalahandi, Sonepur,
On going
Distributary) Nuapada,
MCII Completed Malkhangiri,Nayagarh
Mahanadi Delta Stage-I ( Kendrapara
On going
Irr. Divn)
Mahanadi Delta Stage-II ( Prachi Divn.) Completed
HLC-III ( Jajpur Irr. Divn) On going
Upper Indravati ( Rt. Canal System) Completed
Rehabilitation of aqueducts of Baragarh
Not taken up
Main Canal
Dredging of Taldanda Extn. Canal RD
Not taken up
0.00 to 7.20km( Mahanadi Delta Stage-I)
Minor Irrigation ( 284 nos. Minor
Irrigation Projects)
Rengali Right Bank Canal
Deo Irr. Project
Mahendratanya Irr. Project, Ph- I i. Completion of last mile projects with
Manjore Irr. Project On going adequate provision of fund.
Ong Extn. Project
Lower Suktel Irr Project, Balangir ii. Taking projects to advance stage of Angul, Dhenkanal,
Water Sector (UGPL) 57480 Ha. Irrigation potential
construction to avail central government Cuttack, Jagatsinghpur,
Infrastructure State Funded Hadua Irr. Project 2019-20 to created.
2 5000.00 funding like PMKSY- by completing pre- Kendrapara,Gajapati,
Developement Programme. Scheme Cheligada Irr. Project Funding issued under 2023-24 Funding of Cheligada and
project activities - advance stage of Ganjam, Bolangir,
(WSIDP) AIBP Kusumi is issued under AIBP
construction. Sonepur, Mayurbhanj
Baghalati Irr. Project On going
Funding issued under iii. Preparation of shelf of projects for funding
Kusumi Irr. Project
Mahanadi Chitrotpala Island Irrigation AIBP by adequate progress of pre-project activities.
Project
Ghatakeswar Irr Project On going
Rajua Irr. Project
Malkhangiri, Sambalpur,
Cement concrete lining,renovation of Bargarh, Barpalli,
Canal Lining and System structures,re-sectioning and Kendrapada, Jajpur,
State Funded 2018-19 to
3 Rehabilitation Programme. 1150.00 strengthening of canal embankment from On going Jagatsinghpur,
Scheme 2022-23
(CLSRP) RD 0.00 km to 60.00 km of TMC, Nimapara,Puri,
(phase- I from RD 00 Km to 30.00 km) Ganjam,Berahampur,
Koraput.

Rehabilitation & Renovation of Bargarh


Main Canal from RD 00 Km to
84.277Km of Hirakud Distribution
System
Total Cost Scheme Outcome
Sl No. Name of the Scheme Source of funding Projects Taken up/ Ongoing Status Objective District Benifited
(in Crores) Duration (upto Jan-2022)
Improvement to Dhanabasa distributary,
Ex Baragarh Main Canal of Hirakud
Irrigation Project
Improvement to Putrupali distributary,
Ex Baragarh Main Canal of Hirakud
Irrigation Project
Improvement and restoration to Sasan
Main Canal from RD 00 to 8.00Km
1.To improve the performance of an irrigation By the end of January'2022
Lining of Bausuni and Sakma Minor system and to increase the water use efficiency 35.6 Km length of Canal
Lining of Dungurupali Minor of canals. Lining has been achieved.
Lining of Koibahal and Mahada Minor On going
2.To enhance water availability at farm level Renovation of Taladanda
Improvement & restoration of Huma tail Malkhangiri, Sambalpur,
and reduce seepage losses in distribution Main Canal lining from RD 00
distributary Bargarh, Barpalli,
system. to 1.50 Km (Jobra to Ranihat )
Renovation & Improvement of Parmanik Kendrapada, Jajpur,
has been completed in major
distributary Jagatsinghpur,
3.To reduce the gap between irrigation potential & medium Sector.
Canal Lining and system rehabilitation Nimapara,Puri,
created and irrigation potential utilized in
programme of Gobari Canal from RD Ganjam,Berahampur,
various projects.
11.40 to 14.40 Km in Kendrapada Koraput.
In minor Irrigation Sector 12
Municipality Area 4.To reclaim the valuable agricultural land projects have been taken up
Renovation of 1 Main Canal of Jajpur getting unsuitable for use due to water logging out of which -10 Nos. are
Main Canal from RD 6.60 to 18.60 Km and salinity resulting out of seepage from completed.
CC Lining of Machagaon Canal from Rd canals.
8.00 to 14.50 Km
CC Lining of Distributary No.13
Machagaon Canal
CC Lining of Distributary No.13-C of
Distributary No.13 of Machhagaon
Canal
Renovation of Taladanda Main Canal
lining from RD 00 to 1.50 Km (Jobra to Completed
Ranihat
Renovation, slope Protection and
Beautification work of Taladanda Main
On going
Canal lining from RD 1.56 to 3.12 Km (
Ranihat Bridge to Matrubhwan Sluice)
CC Lining of Nimapara Branch Canal
from RD 27.60 to Patapur Bridge at RD
36.22 Km
CC Lining of Bamanala Minor from RD
00 to 8.00 Km
CC Lining of Kakatpur Branch Canal
from RD 56.90 to RD 68.00 Km
Renovation of Khandahata Distributary
from RD 0.00 to 10.260 Km.
Renovation of Luna Distributary from
RD 0.00 to 14.786 Km.
Imrovement of Rushikulya Main Canal
near Padampur of Rushikulya Irrigation Malkhangiri, Sambalpur,
System Bargarh, Barpalli,
CC Lining and system improvement of On going Kendrapada, Jajpur,
Pitala minor of Disty no.2 of Rushikulya Jagatsinghpur,
Irr. Project Nimapara,Puri,
Improvement to minor & sub minor Ganjam,Berahampur,
between 23.00 Km to 35.80 Km of JMC Koraput.
of Jayamngala Irrigation System
Improvement & CC lining to
distributaries of Ghodahada Irr. project
CC Lining and system improvement to
Rushikulya Main Canal from RD 12.00
to 14.00Km of Rushikulya Irrigation
System
Total Cost Scheme Outcome
Sl No. Name of the Scheme Source of funding Projects Taken up/ Ongoing Status Objective District Benifited
(in Crores) Duration (upto Jan-2022)
CC lining of Joypore Main canal
12 projects taken up &
39 Nos. of MIPs
10 completed
i. Japan is providing ODA (Official
Development Assistance) loan to developing
countries at low rates of interest and with long
repayment period to develop and improve the
economic and social infrastructure for
sustainable economic development. Overseas
Japan Economic Cooperation Operations of Japan Main Canal length from RD
JICA-1787.30
International 2015-16 to are in charge of the major part of ODA loans. 71.33 Km to 100.49 Km Dhenkanal, Jajpur,
4 S.S-468.00 Rengali irrigation Project, LBC-II On going
Cooperation 2022-23 completed with 9558 Ha. of Kheonjhar
TOTAL-2255.30
Agency (JICA) ii. The loan agreement IDP-244 was signed on Irrigation potential Created.
30.03.2015 with JICA to take up the balance
canal work of the distribution system of Left
Externally Aided Projects Bank Main Canal from RD 71.33 Km to
(EAP) 100.49 Km and Left Bank Main Canal along
with distribution system from RD 100.49 Km
to 123.50 Km in phase-II
There are 204 large dams (10 Dams under
Major Irrigation, 50 Dams under Medium
PSTs of 5 Dams
Irrigation and 144 Dams under Minor
namely Kanjhari,
13 Dams- Kanjhari, Saipala, Upper Irrigation) in the State. In order to improve
World bank-70.00 Rengali Ardei, PST for 11 dams has been Nuapada, Bolangir,
DRIP Funded by Suktel, Kuanria, Rengali, Ardei, 2021-22 to safety and
5 S.S-30.00 Jagadala and Jagatghai prepared with Design ayacut Keonjhar, Anugul,
World Bank Jagadala, Jagatghai, Domkutch, Laigaon, 2026-27 operational performance of the dams as well as
TOTAL-100.00 have been approved by of 252.46 Th. Ha. Ganjam, Boudh, Nayagarh
Parhel, randa, Gunduriposi to rehabilitate distressed dams, Dam
World Bank and tender
Rehabilitation & Improvement Project (DRIP)
has been floated.
is being implemented at national level through
World Bank assistance
Subarnarekha Irrigation Project Ongoing
Integrated Anandapur Barrage Project Ongoing
Kanupur Irrigation Project Ongoing
Nuapada, Bolangir,
AIBP-13642.07, Rukura Irrigation Project Completed
PMKSY-AIBP & 2015-16 to ensure access to some means of protective AIBP- 194904Ha., CADWM- Keonjhar, Balasore,
6 Central Assistance CADWM- Ret Irrigation Project Completed
CADWM onwards irrigation to all agricultural farms in the country. 82540 Ha. Kalahandi, Sundargarh,
1265.24 Lower Indra Irrigation Project Completed
Mayurbhanj, Koraput
Telengiri Irrigation Project Completed
Upper Indravati Extension Irrigation
Completed
Project
Nos. of Projects taken up: to implement various developmental and
welfare projects/ programmes in the mining
Minor Irrigation Sector- 75 65 Nos. Completed affected areas to minimize/ mitigate the adverse Angul, Dhenkanal, Jajpur,
10072 Ha. Outcome Potential
Megalift Sector- 11 1 No. Completed impacts during and after mining on the Jharsuguda, Keonjhar,
7 PMKKKY-DMF DMF Funding 791.13 _ Created and 6612 Ha.
environment, health and socio economic Koraput, Mayurbhanj,
OLIC Sector- 886 787 Nos. Completed Outcome Potential Stabilized.
conditions of the people in mining affected Rayagada and Sundargarh.
Total Nos.- 972 Total Nos. 853 districts to ensure long term sustainable
livelihood of the affected people in mining
Under this scheme, Check dams are being
constructed in small streams & nallahs for
15857 Check dams (Major & Medium sector -1473 nos. & Minor 151853 Ha. Of area beniffited
State Funded 2010-11 conservation of water to meet the domestic
8 MukshyamantriAdibandha 3620.45 Irrigation Sector-14,384 nos.) have been completed up to end of through the construction of In all 30 districts of Odisha
Scheme onwards need of people of nearby villages, recharging
Tiari Yojana (MATY) December’2021 this check dams
ground water and for providing incidental
irrigation to the crops in the near by agriculture
Total Cost Scheme Outcome
Sl No. Name of the Scheme Source of funding Projects Taken up/ Ongoing Status Objective District Benifited
(in Crores) Duration (upto Jan-2022)
i.The storage structure will minimise the
seasonal variation of ground water level by
maintaining the IN-STREAM STORAGE upto
the pond level.
Ganjam, Gajapati,
Out of 30nos, 8 nos are ii.The water can be utilized to cater the needs
Kalahandi,
on going, 18nos are in of drinking & domestic requirement of nearby
Cuttack,Bolangir,
tender process, 3 nos localities, fishery developement, listock
IN-STREAM STORAGE State Funded 30 nos of ISS are taken up in PHASE-I 2019-20 to Sambalpur, Talcher,Jajpur,
9 4700.39 TAC cleared & to be farming, industrial water deemand & irrigation
STRUCTURE Scheme (FY 2021-22) 2024-25 Kendujhar
tendered, 1 no axis to purposes
,Bhadrak,Nuapada,Bargarh
be finalized & to be iii. the storage structure shall also help to the
,Puri, Khordha and
placed in TAC partial routing of flood by delaying the medium
Sundargarh.
sizes flood peaks
iii.Water bodiies will be used to conserve water
to meet the ever increasing deemand for water
by society.

Assisting State Governments for the


completion of ongoing rural infrastructure
864.78 XX-136 Nos. Completed-126 2014-15 projects
Cuttack, Jajpur, Bhadrak,
and also taking up new projects.
Sambalpur,Puri,
Activities/ Sectors eligible for finance under 52599 Ha. Irr. Potential
Jagatsingpur, Ganjam,
RIDF Stabilised, 7.90 Lakh ha.
Balasore, Kendrapara,
245.1 XXI-37 Nos. Completed-37 2015-16 (i) Irrigation projects. (Major, Medium and agriculture land protected
10 RIDF NABARD Mayurbhanj, Khurda,
630.44 XXII-102 Nos. Completed-84 2016-17 Minor) from flood, 1425 Ha.
Bolangir,
133.64 XXIII-17 Nos. Completed-14 2017-18 (ii) Flood Control & Drainage Projects. agreculture land retrived from
Keonjhar,Rayagada,
897.13 XXIV-77 Nos. Completed-42 2018-19 (iii) Agriculture and Allied Activities water logging
Nuapada,Nayagarh,
383.44 XXV-74 Nos. Completed-11 2019-20 (iv) Rural Connectivity. (Road & Bridges)
Deogarh & Boudh,
127.84 XXVI-9 Nos. Completed-0 2020-21 (v) Social Sectors (Rural water Supply,
Infrastructure for PHC, Educational Institution
341.48 XXVII-7 Nos. Completed-0 2021-22 & e-governance).