TRIAGING and May wrongfully tag the patient that will lead to delayed diagnosis and
1
Assessment Under-assessed Patient treatment.
Unlikely- Could
Minor- it would take a considerable happen, but only
period to feel the effects, e.g. 1. rarely; once or few High – Needs certain level of
2 Equipment Breakdown, 2. Uncalibrated times in a decade, or verification/validation or MEDIUM (M)
Instruments, 3. Document/ Records improbable to occur engineering conttrol
Loss, 4. Low employee moral over the duration of
an activity
Moderate- continuous activity without
controls may lead to non-conformity (e.g. Likely-Might happen
1. Customer Feedback, 2. Low Rating occasionally; once or Moderate - Detection controls
3 Performance 3. Poor services, 4. Poor few times a year; or have not been qualified/validated
may occur once to provide assurance of HIGH (H)
Quality of services, 5. Poor quality when an activity effectiveness.
supplied by supplier/ contractor, 6. High takes place
Attrition rate of employee...
Highly Probable-
Will probably occur Low - Detection Controls are
Serious- 1. High Revenue Loss, 2. Valid in most cases; either highly manual and/or historically
Customer Complaints, 3. Financial weekly, once or few unreliable.Current controls are
4
Implications are significant , 4. Property times a month; or inadequate to ensure failure
As much as po
loss 5. Negative Publicity may occur a few identification prior to further
times when activity processing.
takes place
Certain- Expected to
Major- 1. Loss of Life, 2. Loss of occur in most cases; Very Low –No detection control
5
Property, 3 Major Sanctions/Penalize, 4. either occurs daily,
several times per are possible . Acts only after the
Lost Benefits to Interested parties, 5. Civil day, or several times harm or impact has occurred or
Disobedience each time the no controls at all.
activity takes place
RISKS AND OP
Document No.:
Reviewed by:
Date reviewed:
Next Review:
RPN Approved by:
Final R
Initial Risk Assessment
Efforts should be made to reduce the risk, but the cost of prevention should be
carefully measured and limited. Risk reduction measures should be implemented 10 - 40
within a defined time period.
Work should not be started until the risk has been reduced. Considerable
resources may have to be allocated to reduce the risk. Where the risk involves Greater than 40
work in progress, urgent action should be taken.
uch as possible the TARGET IS TO REDUCE THE RPN AFTER APPLYING CERTAIN CONTROLS to ACCEPTABLE Risk Level
RISKS AND OPPORTUNITIES ASSESSMENT FORM
Reviewed by:
Date reviewed:
Next Review:
Approved by:
FORMULA:
Final Risk Evaluation
Opportunity and IMPACT/Consequences Iden
RPN
Reference Severity (S) Likelihood (L) Detection (D) (SxLxD) Risk Level Potential Opportunity
Consultation
3 2 1 6 L Conduction of Training and Frequent Evaluation
Record
Opportunity Table
Rating Impact
Number
Negligible- No percieved
value for improve output,
l to 9 1
service and customer
satisfaction
Significant- Continuous
activity will definitely impact
Risk Level 4
output, service and customer
satisfaction
OPN
Impacts/ Consequence Impact (I) Likelihood (L) Sustainability (S) Existing Controls (IxLxS) Opp Level
Increases the Skills and Stimulates Critical Thinking of the Established Skill
5 3 4 60 A
Triage Nurse, thus providing high quality assessment. Building Programs
faster record retrieving thus saving time and resulting to Hiring of adequate
faster treatment and disposition 5 3 1 manpower on retrieving 15 S
health records
Opportunity Table
Opportunity Assessment
Likelihood Degree of Sustainability
Action and Time Scale
Unlikely-25% chance of
success within the next 12
months
Difficult - Need certain
amount of investment and
Significant (S) May consider pursuing the opportunity
effort to maintain and
sustain
Likely-25-50% chance of
success within the next 12
months
Sustainable – Low
investment and resource is
required to maintain and Acceptable (A) Pursue the Opportunity
sustain improvement and
opportunity
Utilization of available
resources. Minimally use of IT OPD/ER and Admission Logs
Excel to improve recording
ment (OPN)
Value of OPPORTUNITY Priority Number
Greater than 40
Department/Division: NURSING
Process/Procedure: CLINICAL NURSING WARD PROCEDURE
Conducted by:
Date Conducted:
FORMULA: Severity (S) x Likelihood (L) x Detection ( D ) = RPN
RISK and IMPACT/ CONSEQUENCE Identification
May delay the course of treatment of the patient, and may also lead to
1 Assessment Under-assessed Patient miss diagnosis
2 Obtaining Vital Signs Unreliable patient condition May lead to miss diagnosis and miss treatment
Highly Probable-
Will probably occur Low - Detection Controls are
Serious- 1. High Revenue Loss, 2. Valid in most cases; either highly manual and/or historically
Customer Complaints, 3. Financial weekly, once or few unreliable.Current controls are
4
Implications are significant , 4. Property times a month; or inadequate to ensure failure
As much as po
loss 5. Negative Publicity may occur a few identification prior to further
times when activity processing.
takes place
Certain- Expected to
Major- 1. Loss of Life, 2. Loss of occur in most cases; Very Low –No detection control
5
Property, 3 Major Sanctions/Penalize, 4. either occurs daily,
several times per are possible . Acts only after the
Lost Benefits to Interested parties, 5. Civil day, or several times harm or impact has occurred or
Disobedience each time the no controls at all.
activity takes place
RISKS AND OP
Document No.:
Reviewed by:
Date reviewed:
Next Review:
RPN Approved by:
Final R
Initial Risk Assessment
Replacement of Nurse,
Calibration of Existing and
5 3 3 Equipments once 45 H new equipments Supply Sept. 2024
worn office
Training
In service Skill and
Frequent Training and
5 4 4 80 H developme Sept. 2024
Building evaluation with simulation
nt
committee
Work should not be started until the risk has been reduced. Considerable
resources may have to be allocated to reduce the risk. Where the risk involves Greater than 40
work in progress, urgent action should be taken.
uch as possible the TARGET IS TO REDUCE THE RPN AFTER APPLYING CERTAIN CONTROLS to ACCEPTABLE Risk Level
RISKS AND OPPORTUNITIES ASSESSMENT FORM
Reviewed by:
Date reviewed:
Next Review:
Approved by:
FORMULA:
Final Risk Evaluation
Opportunity and IMPACT/Consequences Iden
RPN
Reference Severity (S) Likelihood (L) Detection (D) (SxLxD) Risk Level Potential Opportunity
Attendance and
Certificates 3 2 1 6 L Establishment of Code Blue Team in every shift
Opportunity Table
Rating Impact
Number
Negligible- No percieved
value for improve output,
l to 9 1
service and customer
satisfaction
Minor- pursuing the
opportunity will slightly
2
improve output, service and
customer satisfaction
Significant- Continuous
activity will definitely impact
Risk Level 4
output, service and customer
satisfaction
Major- Continuous activity
will significantly improve
5
Output, Service and Customer
Satisfaction
Impact (I) x Likelihood (L) x Degree of Sustainability( S ) = OPN
IMPACT/Consequences Identification
OPN
Impacts/ Consequence Impact (I) Likelihood (L) Sustainability (S) Existing Controls (IxLxS) Opp Level
Increases the Skills and Stimulates Critical Thinking of the Established Skill
5 3 4 60 A
Nurse, thus providing high quality assessment. Building Programs
Opportunity Table
Opportunity Assessment
Likelihood Degree of Sustainability
Action and Time Scale
Likely-25-50% chance of
success within the next 12
months
Sustainable – Low
investment and resource is
required to maintain and Acceptable (A) Pursue the Opportunity
sustain improvement and
opportunity
required to maintain and Acceptable (A) Pursue the Opportunity
sustain improvement and
opportunity
Establishment of bulletin of
Code Blue team Nursing Service Schedule
ment (OPN)
Value of OPPORTUNITY Priority Number
Greater than 40
Greater than 40
Department/Division: PHU
Process/Procedure:
Conducted by:
Date Conducted:
FORMULA: Severity (S) x Likelihood (L) x Detection ( D ) = RPN
RISK and IMPACT/ CONSEQUENCE Identification
Implementation of Surveillance
2 and reporting of notifiable Missed or delayed case detection Untimely reporting of consolidated data of detected cases
diseases
Failure to notify the receiving facility in Delayed readiness of medical team may lead to delayed medical response and possible
3 Communication during referrals
advance deterioration of patient condition
Highly Probable-
Will probably occur Low - Detection Controls are
Serious- 1. High Revenue Loss, 2. Valid in most cases; either highly manual and/or historically
Customer Complaints, 3. Financial weekly, once or few unreliable.Current controls are
4
Implications are significant , 4. Property times a month; or inadequate to ensure failure
As much as po
loss 5. Negative Publicity may occur a few identification prior to further
times when activity processing.
takes place
Certain- Expected to
Major- 1. Loss of Life, 2. Loss of occur in most cases; Very Low –No detection control
5
Property, 3 Major Sanctions/Penalize, 4. either occurs daily,
several times per are possible . Acts only after the
Lost Benefits to Interested parties, 5. Civil day, or several times harm or impact has occurred or
Disobedience each time the no controls at all.
activity takes place
RISKS AND OP
Document No.:
Reviewed by:
Date reviewed:
Next Review:
RPN Approved by:
Final R
Initial Risk Assessment
PHU
4 4 4 Verbal Feedback 64 H Feedback Form Utilization
head/Coord Sept. 2024
Work should not be started until the risk has been reduced. Considerable
resources may have to be allocated to reduce the risk. Where the risk involves Greater than 40
work in progress, urgent action should be taken.
uch as possible the TARGET IS TO REDUCE THE RPN AFTER APPLYING CERTAIN CONTROLS to ACCEPTABLE Risk Level
RISKS AND OPPORTUNITIES ASSESSMENT FORM
Reviewed by:
Date reviewed:
Next Review:
Approved by:
FORMULA:
Final Risk Evaluation
Opportunity and IMPACT/Consequences Iden
RPN
Reference Severity (S) Likelihood (L) Detection (D) (SxLxD) Risk Level Potential Opportunity
Approved
Involvement of external agencies in the
Activity 2 2 2 8 L
implementation of activities
Proposal
Opportunity Table
Rating Impact
Number
Negligible- No percieved
value for improve output,
l to 9 1
service and customer
satisfaction
Minor- pursuing the
opportunity will slightly
2
improve output, service and
customer satisfaction
Significant- Continuous
activity will definitely impact
Risk Level 4
output, service and customer
satisfaction
Major- Continuous activity
will significantly improve
5
Output, Service and Customer
Satisfaction
Impact (I) x Likelihood (L) x Degree of Sustainability( S ) = OPN
IMPACT/Consequences Identification
OPN
Impacts/ Consequence Impact (I) Likelihood (L) Sustainability (S) Existing Controls (IxLxS) Opp Level
Request for
broader scope and higher chances of implementation 3 4 3 36 A
Assistance
In-service awareness to
reporting is more efficient 3 3 3 disease surveillance 27 S
dissemination of Policies
referral routinely efficient, properly documented and in order 4 4 4 and Procedures via MOA 64 A
Opportunity Table
Opportunity Assessment
Likelihood Degree of Sustainability
Action and Time Scale
Likely-25-50% chance of
success within the next 12
months
Sustainable – Low
investment and resource is
required to maintain and Acceptable (A) Pursue the Opportunity
sustain improvement and
opportunity
required to maintain and Acceptable (A) Pursue the Opportunity
sustain improvement and
opportunity
disease
train more personnel
request letter for training,
surveilance certificate
unit
District Health Zone Meeting PHU Head/ Coord MOA, Communication Letter
ment (OPN)
Value of OPPORTUNITY Priority Number
Greater than 40