0% found this document useful (0 votes)
25 views37 pages

13m Rcc Bridge

Uploaded by

Nisar Ahmad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views37 pages

13m Rcc Bridge

Uploaded by

Nisar Ahmad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 37

National Solidarity Programme (NSP)

Engineering Department (ED)


Design Drawings of
13.1m Clear Span RCC
Bridge
FOR ENGINEERING MANUAL (EM)
August - 2012
DESIGNED DRAWINGS LIST
S/N DESCRIPTIONS SHEET NO
1 COVER PAGE 1
2 DESIGNED DRAWINGS LIST 2
3 GENERAL NOTE AND TECHNICAL SPECIFICATIONS 3 AND 4
4 PLAN OF BRIDGE 5
5 LONGITUDINAL SECTION OF BRIDGE ( SECTION A-A) 6
6 CROSS SECTION OF BRIDGE ( SECTION B-B) 7
7 PLAN OF STONE MASONRY ABUTMENTS 8
8 SECTION OF STONE MASONRY ABUTMENTS ( SECTION C-C) 8
9 BED BLOCK AND BACKWALL AND THIERE STEEL REINFORCEMENT DETAILS 9
10 PLAN AND SECTION OF WING WALLS ( SECTION D-D) 10
11 APPROACH SLAB AND ABUTMENTS STRIP BEAMS STEEL DETAILS 11
12 APPROACH SLAB AND SAFETY CURBS STEEL REINFORCEMENT DETAILS 12 AND 13
13 RCC DECK SLAB REINFORCEMENT DETAILS 14,15 AND 16
14 RCC MAIN GIRDERS STEEL REINFORCEMENT DETAILS 17 AND 18
15 RCC CROSS GIRDERS STEEL REINFORCEMENT DETAILS 19
15 RCC DECK SLAB WEARING COAT STEEL REINFORCEMENT DETAILS 20 AND 21
16 STEEL I-BEAM AND G.I PIPES GUARD RAILS DETAILS 22
17 STEEL PLATES BEARING DETAILS 23 AND 24
18 EXPANSION JOINTS DETAILS 25 AND 26
19 BED BLOCKS AND BACKWALLS STEEL BARS CUTTING DETIALS 27
20 ABUTMENTS AND WINGWALLS STRIP BEAMS STEEL BARS CUTTING DETAILS 28
21 APPROACH SLABS, SAFETY CURBS AND DECK SLAB BARS CUTTING DETAILS 29 AND 30
22 MAIN GIRDERS,CROSS GIRDERS AND W.COAT STEEL BARS CUTTING DETAILS 31 AND 32
23 ALL RCC ELEMENTS STEEL BARS CHART ( QUANTITIES ) 33 AND 34

Sheet No.
No Date Revision Survey by Typical Ministry of Rural Rehabilatation and Development Scale 02 Province Project name:
1 Structural Design by SAYED KARIM '' WARDAK '' 34 RCC BRIDGE
National Solidarity Programme(NSP) Date August,2012 District
2 Drawn by SAYED KARIM '' WARDAK '' Engineering Department Drawing Title:
3 Approved by M.Ashraf '' Himmat '' (Eng.Mng) Drawing No. ST-02 Village / CDC DESIGNED DRAWINGS LIST
GENERAL NOTE AND TECHNICAL SPECIFICATIONS
16. Duration of curing of RCC and PCC work
1- The bridge has been designed for IRC Class A live loading
2- Bearing capacity of soil taken 200KN/m² in foundation design
notbe less than 28 days
and it should be compare with actual capacity of soil under 13. Consider manhole (Ø75mm) Pipes in
foundation, abutment and wing walls if needy
if actual capacity of soil less than considered in design, site 17. Mark of RCC concrete for Bed Blocks,
engineer should be inform Kabul engineering department to Girders, Deck slab, curbs,W.Coat and
redesign foundation according actual bearing capacity of soil. Approach slabs 250 kg/cm2 (1:1:2) and
3- This bridge typicla designed for Engineering Manual (EM) not for for other RCC are 150 kg/cm2
Specific place 18. Mark of PCC concrete is 150 kg/cm2
4- for safety of workers and labors during excavation of foundation the (1:2:4)
Foundaion should be excavated by proper slope 19. Mark of steel bars (Grade 60, 60000 psi
5. All dimensions are in mm unless otherwise specified or Fe-415)
6. Should not be use river bed stone,smooth stone,chemical material 20. Portion of marter in stone masonry (1:4)
stone,poor quality stone and small size stone 21. portion of marter in pointing should
7. Should be use hard, and large size stone be (1:3)
8. All masonry work should be pointed (river side faces)
22. Depth of Abutments and wingwalls are not
9. Skew angle , length and slope of wing walls should be adjusted
by the responsible engineer as per site conditions or accng. to survey
constant, it, is belongs to site condition and
10. Refer to the bars schedule for the length and shape of reinforcement. Bearing Capacity of soil
11. Concrete mix shall be proportioned by volume with a water / cement 23. Consider Expension joints both sides of
ratio of not more than 0.45 bridge
12. concrete of safety curbs shall be placed after 21 days of slab concrete between deck slab and back wall
placing 24. Consider PVC pipes for surface drainage of
13. Should be use clean and potable water for mortar and curing Deck slab
14.The center of Girders should be consider 2 or 3cm upper across 25. For separiting of bottom and top layers of
support during shuttering for controling of deflection steels mesh, shoud be consider spacers in
15. duration of removal of shuttering 28 days proper spacing

Sheet No.
No Date Revision Survey by Typical Culvert Ministry of Rural Rehabilatation and Development Scale 03 Province Project name:
1 Structural Design by SAYED KARIM '' WARDAK '' 34 RCC BRIDGE
National Solidarity Programme(NSP) Date August,2012 District
2 Drawn by SAYED KARIM '' WARDAK '' Engineering Department Drawing Title:
3 Approved by M.Ashraf '' Himmat '' (Eng.Mng) Drawing No. ST-03 Village / CDC SPECIFICATIONS
GENERAL NOTE AND TECHNICAL SPECIFICATIONS
26. The following data considered in design of this
structure (Slab, Abutments and Wing Walls),
so if you see any differencess in data at the
proposed structure site, the structure should be
re-design based on actual data of site.
A- Mark of concrete is 250, B- Grade of steel is 60
C- Safe B.C of soil is 300 kg/cm2 , D- Unit weight
of back fill material is 18.4 KN/m3
, E- Unit weight of stone masonry
is 24 KN/m3, F- Angle of Repose is 35 deggree
G- Friction cofficient is 0.6
27. Please refer to steel bars cutting details and cuts one one bars
According to bars cutting details for sampling and than fixed in
templates and check it , after checking and correct size of sample bars
starts the process of steel bars cutting
( The steel bars should not be cutted in one time without sample bars
checking in templates)
28. Concrete in main girders, cross girders and deck
slab shall be placed in full width, no permitted
construction joints in the middle of girders and deck slab
29. Back fill material of abutments and wing walls should be compacted
20 cm layer by layer by compactor
30. The guard rails should be paint with oil orange color (3 coat) and safety
Curbs with oil paint three colors (orange,black and white) every color strip should be 40cm
31. New Structure should be closed by traffic face
from deck slab concrete puring date up to 30 days
32. No allowed to come any changes in the drawings of supper and sub structures of this bridge without design calculations

Sheet No.
No Date Revision Survey by Typical Culvert Ministry of Rural Rehabilatation and Development Scale
04 Province Project name:
1 Structural Design by SAYED KARIM '' WARDAK '' RCC BRIDGE
National Solidarity Programme(NSP) Date August,2012
34
District
2 Drawn by SAYED KARIM '' WARDAK '' Engineering Department Drawing Title:
3 Approved by M.Ashraf '' Himmat '' (Eng.Mng) Drawing No. ST-04 Village / CDC SPECIFICATIONS
PLAN OF BRIDGE
Direction of Flow
3600 3600
500 500
400 850 850 600 400 400 600 850 850 400
B
000
7

0
700
Up Stream
Stone Masonry
Wing Wall
14300
14000
3500 3500 3500 3500
400 600
450

4000
Main Road
Road Girders Cross Girders CL of Bridge
2100

A
5000

A Approach Slab Approach Slab


600 400

Safety Curb
450

PVC Drain Pipe


Guard Rail 2Ø100mm PVC Pipes
Stone Masonry

000
Down Stream Wing Wall

7
0
700

B
400 850 850 600 400 400 600 850 850 400
500 500
3600 3600

Sheet No.
No Date Revision Survey by Typical Culvert Ministry of Rural Rehabilatation and Development Scale 05 Province Project name:
1 Structural Design by SAYED KARIM '' WARDAK '' 34 RCC BRIDGE
National Solidarity Programme(NSP) Date August,2012 District
2 Drawn by SAYED KARIM '' WARDAK '' Engineering Department Drawing Title:
3 Approved by M.Ashraf '' Himmat '' (Eng.Mng) Drawing No. ST-05 Village / CDC PLAN OF BRIDGE
22800
50 50
4200 14300 4200
948 4000 14000 4000 1587
ROAD LEVEL ROAD LEVEL

1101
1345

1000

Cross Girder
3500
2201

Compacted

2187
Back filling Compacted
1102

13100 HFL Back filling

3321
3330

1300

LWL
1200
Stone masonry
RCC Strip Beam

2800
River Bed
2000

2000
10700
450

450
4000 4000
4400 4400
19100
SECTION A-A

Sheet No.
No Date Revision Survey by Typical Culvert Ministry of Rural Rehabilatation and Development Scale
06 Province Project name:
1 Structural Design by SAYED KARIM '' WARDAK '' RCC BRIDGE
National Solidarity Programme(NSP) Date August,2012
34
District
2 Drawn by SAYED KARIM '' WARDAK '' Engineering Department Drawing Title:
3 Approved by M.Ashraf '' Himmat '' (Eng.Mng) Drawing No. ST-06 Village / CDC LONGITUDINAL SECTION OF BRIDGE
600 3800 600
130 Steel I-beam 130
100 cm c/c
(h =13cm)
350

350
G.I Pipes
Ø80mm
2Ø100mm
1000

1000
200 300 286 324

200 300 286 324


75mm PVC Drain 8 cm thick RCC PVC Pipes
Pipe 3.5m c/c Wearing Coat (L=14.3m)
1.7% 1.7%

250
500

500
200
1000
1200

1200

1200
1100
Main Girders
2.5m c/c
Cross Girders
3.5m c/c
600 450 400 2100 400 450 600
1250 2500 1250
5000
SECTION B-B

Sheet No.
No Date Revision Survey by Typical Culvert Ministry of Rural Rehabilatation and Development Scale
07 Province Project name:
1 Structural Design by SAYED KARIM '' WARDAK '' RCC BRIDGE
National Solidarity Programme(NSP) Date August,2012
34
District
2 Drawn by SAYED KARIM '' WARDAK '' Engineering Department Drawing Title:
3 Approved by M.Ashraf '' Himmat '' (Eng.Mng) Drawing No. ST-07 Village / CDC CROSS SECTION OF BRIDGE
Approach slab
4400 500 1330 250
200 500 500 600150 650 500 700 200

2080
See Detail "A"
200 200
500
1250

600 1000 Ø75mm


drainage pipe

1800
2m c/c
500
2339

8330
5800
800 1000
C C 500 2468

2500
5000

200
River Bed
2995
200 See Detail "B" 700
3100

2800
2000
1250
200

450
15cm PCC
30cm dry
Stone Patching 4000
4400
PLAN OF ABUTMENT
SECTION C-C

Sheet No.
No Date Revision Survey by Typical Culvert Ministry of Rural Rehabilatation and Development Scale 08 Province Project name:
1 Structural Design by SAYED KARIM '' WARDAK '' RCC BRIDGE
National Solidarity Programme(NSP) Date August,2012
34
District
2 Drawn by SAYED KARIM '' WARDAK '' Engineering Department Drawing Title:
3 Approved by M.Ashraf '' Himmat '' (Eng.Mng) Drawing No. ST-08 Village / CDC PLAN AND SECTION OF ABUTMENT
50
200 400 200 STEELS DETAILS
150 1 10Ø20mm
250

2 6Ø20mm
3 2Legged Ø10mm @ 150mm c/c
6
4 2Legged Ø10mm @ 150mm c/c
1580
1330

5 5 2Legged Ø12mm @ 20mm c/c


Bearing 6 14 Ø10mm
2 CLEAR COVER OF STEELS
4 (a) For inside faces of members C = 30mm.
1
500

500

3 (b) For out side faces of members C = 30mm.


350 650 STEEL BARS OVERLAP
1000 Bed Block & Back wall Steel bars overlap for all vertical and
Detail "A" Steel Details Horizontal elements is 60d
'' d '' is considered steel bar diameter
Bed Block & Back wall Developement length of bar is 58d
7 8 RCC Strip Beam Detail 7 Ø10mm@300mm c/c
8 Ø10mm@240mm c/c

200
Detail "B"
2988 Clear cover c = 30mm

Sheet No.
No Date Revision Survey by Typical Culvert Ministry of Rural Rehabilatation and Development Scale
09 Province Project name:
1 Structural Design by SAYED KARIM '' WARDAK '' RCC BRIDGE
National Solidarity Programme(NSP) Date August,2012
34
District
2 Drawn by SAYED KARIM '' WARDAK '' Engineering Department Drawing Title:
3 Approved by M.Ashraf '' Himmat '' (Eng.Mng) Drawing No. ST-09 Village / CDC BED BLOCK ADN BACKWALL STEEL .D
3600
600 10cm PCC
200 850 850 600 500 200
1000
200 200
550
D D 1267

3500
1650
800
2263

6300

800 200 650


1650
River Bed
See Detail "C"
7000
RCC Strip Beam 200

2800
550 2450

2000

450
15cm PCC
30cm dry
D D Stone Patching 3200
3600
PLAN OF WING WALLS SECTION D-D

Sheet No.
No Date Revision Survey by Typical Culvert Ministry of Rural Rehabilatation and Development Scale
10 Province Project name:
1 Structural Design by SAYED KARIM '' WARDAK '' RCC BRIDGE
National Solidarity Programme(NSP) Date August,2012 34
District
2 Drawn by SAYED KARIM '' WARDAK '' Engineering Department Drawing Title:
3 Approved by M.Ashraf '' Himmat '' (Eng.Mng) Drawing No. ST-10 Village / CDC PLAN AND SECTION OF WING WALLS
DETAIL OF APPROACH SLAB
Steel I-Beams
E

2Ø100mm & G.I Pipes 5000


PVC Pipes Guard Rail 600 3800 600
130 Steel I-beam 130
600

100 cm c/c
G.I Pipes (h =13cm)
250 286 324 350

300 250250 286 324 350


4000 Ø80mm
1000

1000
2Ø100mm
Safety Curb PVC Pipes
(L=4.2m)
5000
3800

1.7% 1.7%

500
280
Approach Slab
Supper
Structures 1- RCC Approach Slab, 25cm
600

2- Dry Stone Patching, 30cm


3- Compacted Soil
Back Wall of
E

Girders 50mm Expansion


Joint
SECTION E-E
9 10 RCC Strip Beam Detail 9 Ø10mm@300mm c/c
10 Ø10mm@240mm c/c

200
Detail "C"
2350 Clear cover c = 30mm
No Date

Sheet No.
Revision Survey by Typical Culvert Ministry of Rural Rehabilatation and Development Scale
11 Province Project name:
1 Structural Design by SAYED KARIM '' WARDAK '' RCC BRIDGE
National Solidarity Programme(NSP) Date August,2012
34
District
2 Drawn by SAYED KARIM '' WARDAK '' Engineering Department Drawing Title:
3 Approved by Drawing No. ST-11 Village / CDC APPROACH AND STRIP.B. DETAILS
M.Ashraf '' Himmat '' (Eng.Mng)
Approach Slab Steel Reinforcement Detail(Plan) Approach Slab Steel Reinforcement Detail(Plan)

F
4000 4000
12
14
5000

5000
11 13

F
Bottom Steel Reinforcement Detial Top Steel Reinforcement Detial

Sheet No.
No Date Revision Survey by Typical Culvert Ministry of Rural Rehabilatation and Development Scale 12 Province Project name:
1 Structural Design by SAYED KARIM '' WARDAK '' 34 RCC BRIDGE
National Solidarity Programme(NSP) Date August,2012 District
2 Drawn by SAYED KARIM '' WARDAK '' Engineering Department Drawing Title:
3 Approved by M.Ashraf '' Himmat '' (Eng.Mng) Drawing No. ST-12 Village / CDC APPROACH SLAB STEEL DETAILS
Approach Slab & Curbs Steel Reinforcement Detail(Section)
5000
600 3800 600
16
15 13 14
11 12
STEELS DETAILS SECTION F-F CLEAR COVER OF STEELS
11 Ø12 @ 150mm c/c 16 4Ø12mm (a) Top faces of members C = 20mm.
12 Ø12 @ 150mm c/c (b) Bottom faces of members C = 30mm.
13 (c) side faces of members(out side) C = 30mm.
Ø12 @ 150mm c/c
14 (d) side faces of members(inside) C = 20mm.
Ø12 @ 150mm c/c
15 4Legged Ø10mm @ 250mm c/c

Sheet No.
No Date Revision Survey by Typical Culvert Ministry of Rural Rehabilatation and Development Scale
13 Province Project name:
1 Structural Design by SAYED KARIM '' WARDAK '' RCC BRIDGE
National Solidarity Programme(NSP) Date August,2012 34
District
2 Drawn by SAYED KARIM '' WARDAK '' Engineering Department Drawing Title:
3 Approved by M.Ashraf '' Himmat '' (Eng.Mng) Drawing No. ST-13 Village / CDC APPROACH AND CURB STEEL DETAIL
Half RCC Deck Slab Reinforcement Detail (Plan)
7000
3500 3500
400 450 600
5000
2100
400
600 450
17 Bottom Steel Reinforcement Detial 18

Sheet No.
No Date Revision Survey by Typical Culvert Ministry of Rural Rehabilatation and Development Scale
14 Province Project name:
1 Structural Design by SAYED KARIM '' WARDAK '' RCC BRIDGE
National Solidarity Programme(NSP) Date August,2012
34
District
2 Drawn by SAYED KARIM '' WARDAK '' Engineering Department Drawing Title:
3 Approved by M.Ashraf '' Himmat '' (Eng.Mng) Drawing No. ST-14 Village / CDC DECK SLAB STEEL DETAILS
Half RCC Deck Slab Reinforcement Detail(Plan)
7000
G

3500 3500
400 450 600

28
2100
5000

24
600 450 400
19 20

G
Top Steel Reinforcement Detial

Sheet No.
No Date Revision Survey by Typical Culvert Ministry of Rural Rehabilatation and Development Scale 15 Province Project name:
1 Structural Design by SAYED KARIM '' WARDAK '' 34 RCC BRIDGE
National Solidarity Programme(NSP) Date August,2012 District
2 Drawn by SAYED KARIM '' WARDAK '' Engineering Department Drawing Title:
3 Approved by M.Ashraf '' Himmat '' (Eng.Mng) Drawing No. ST-15 Village / CDC DECK SLAB STEEL DETAILS
RCC Deck Slab & Curbs Steel Reinforcement Detail(Section)
5000
600 3800 600
16
15
20 19
24

200 300
17
18
23
26
22
21
SECTION G-G
STEELS DETAILS STEEL BARS OVERLAP CLEAR COVER OF STEELS
17 Ø16 @ 150mm c/c (a) Top faces of members C = 20mm.
15 4Legged Ø10mm Steel bars overlap for all vertical and
18 Ø12 @ 150mm c/c Horizontal elements is 60d (b) Bottom faces of members C = 30mm.
@ 250mm c/c
19 Ø12 @ 150mm c/c '' d '' is considered steel bar diameter (c) side faces of members(out side) C = 30mm.
16 4Ø12mm Developement length of bar is 58d
20 Ø10 @ 200mm c/c (d) side faces of members(inside) C = 20mm.

Sheet No.
No Date Revision Survey by Typical Culvert Ministry of Rural Rehabilatation and Development Scale
16 Province Project name:
1 SAYED KARIM '' WARDAK '' RCC BRIDGE
Structural Design by National Solidarity Programme(NSP) Date August,2012
34
District
2 Drawn by SAYED KARIM '' WARDAK '' Engineering Department Drawing Title:
3 Approved by M.Ashraf '' Himmat '' (Eng.Mng) Drawing No. ST-16 Village / CDC DECK SLAB STEEL DETAILS
RCC Main Girder Steel Reinforcement Detail
14300
300 3200 300 3200 300 3200 300 3200 300
H 23 I I H
25 26 26 24 25
1400

2550 2550
H I I 22 H
21
Weld 24
1500 2Ø25mm

200
200

4186 11500
1500 24
3Ø25mm
200

200
11500
4186
22
5Ø28mm
200

200
9200
Weld 21
1700 5Ø28mm

200
200

4386 11500
1700 21
5Ø28mm
200

200
11500
4386

Sheet No.
No Date Revision Survey by Typical Culvert Ministry of Rural Rehabilatation and Development Scale
17 Province Project name:
1 Structural Design by SAYED KARIM '' WARDAK '' RCC BRIDGE
National Solidarity Programme(NSP) Date August,2012
34
District
2 Drawn by SAYED KARIM '' WARDAK '' Engineering Department Drawing Title:
3 Approved by M.Ashraf '' Himmat '' (Eng.Mng) Drawing No. ST-17 Village / CDC MAIN GIRDERS STEEL DETAILS
24 SECTION H-H 24 SECTION I-I
STEELS DETAILS
200

200
300

300
21 10Ø28mm
22 5Ø28mm
25 26
23 23 23 3Ø16mm
1400

1400
24 5Ø25mm
1200

1200
1100

1100
25 4Legged Ø10mm
22
21 21 @ 100mm c/c
26 4Legged Ø10mm

50 6060
50 60

@ 150mm c/c
400 400
STEEL BARS OVERLAP CLEAR COVER OF STEELS
Steel bars overlap for all vertical and (a) Top faces of members C = 20mm.
Horizontal elements is 60d (b) Bottom faces of members C = 50mm.
'' d '' is considered steel bar diameter
(c) side faces of members(out side) C = 30mm.
Developement length of bar is 58d

Sheet No.
No Date Revision Survey by Typical Culvert Ministry of Rural Rehabilatation and Development Scale 18 Province Project name:
1 Structural Design by SAYED KARIM '' WARDAK '' 34 RCC BRIDGE
National Solidarity Programme(NSP) Date August,2012 District
2 Drawn by SAYED KARIM '' WARDAK '' Engineering Department Drawing Title:
3 Approved by M.Ashraf '' Himmat '' (Eng.Mng) Drawing No. ST-18 Village / CDC MAIN GIRDERS STEEL DETAILS
Cross Girder Steel Reinforcement Detail (Elevation)
SECTION J-J
30 J 28 28

200
29 30

1200

1000
1400
29 27

200
300
27
400 2100 400
CLEAR COVER OF STEELS
2900 STEELS DETAILS
J 27 4Ø20mm
(a) Top faces of members C = 20mm.
(b) Bottom faces of members C = 50mm.
28 28 4Ø20mm (c) side faces of members(out side) C = 30mm.
4Ø20mm
29 3Ø16mm
150

150
30 2Legged Ø10mm
2896
@ 100mm c/c
27
4Ø20mm
150

150
2780

Sheet No.
No Date Revision Survey by Typical Culvert Ministry of Rural Rehabilatation and Development Scale
19 Province Project name:
1 Structural Design by SAYED KARIM '' WARDAK '' RCC BRIDGE
National Solidarity Programme(NSP) Date August,2012 34
District
2 Drawn by SAYED KARIM '' WARDAK '' Engineering Department Drawing Title:
3 Approved by M.Ashraf '' Himmat '' (Eng.Mng) Drawing No. ST-19 Village / CDC CROSS GIRDERS STEEL DETAILS
Half RCC Deck Slab Wearing Coat Steel Reinforcement Detail (Plan)
7150 K
600
3800

32
600
31 K Ø75mm PVC Pipe

Sheet No.
No Date Revision Survey by Typical Culvert Ministry of Rural Rehabilatation and Development Scale 20 Province Project name:
1 Structural Design by SAYED KARIM '' WARDAK '' RCC BRIDGE
National Solidarity Programme(NSP) Date August,2012
34
District
2 Drawn by SAYED KARIM '' WARDAK '' Engineering Department Drawing Title:
3 Approved by M.Ashraf '' Himmat '' (Eng.Mng) Drawing No. ST-20 Village / CDC W.COAT STEEL DETAILS
SECTION K-K
5cm thick W.C 8cm thick W.C
31 32
1.7% 1.7%
1900 1900
3800
31
Ø8mm @ 200mm c/c
3800
32
Ø8mm @ 200mm c/c
14260
Clear Cover from Top C = 20mm

Sheet No.
No Date Revision Survey by Typical Culvert Ministry of Rural Rehabilatation and Development Scale 21 Province Project name:
1 Structural Design by SAYED KARIM '' WARDAK '' RCC BRIDGE
National Solidarity Programme(NSP) Date August,2012
34
District
2 Drawn by SAYED KARIM '' WARDAK '' Engineering Department Drawing Title:
3 Approved by M.Ashraf '' Himmat '' (Eng.Mng) Drawing No. ST-21 Village / CDC W.COAT STEEL DETAILS
150 979 979 979 979 1000 1000 1000 1000
Approach Slab RCC Deck Slab
G.I Pipe I-Beam G.I Pipe I-Beam PLAN
13cm
Typical STEEL GUARD RAIL DETAILS
Orange Color G.I Pipe
I-Beam
979 979 979 979 1000 1000 1000 1000

300246 244 270


50
1000

300 1000
500 700
1200
ELEVATION

Sheet No.
No Date Revision Survey by Typical Culvert Ministry of Rural Rehabilatation and Development Scale 22 Province Project name:
1 Structural Design by SAYED KARIM '' WARDAK '' RCC BRIDGE
National Solidarity Programme(NSP) Date August,2012 34
District
2 Drawn by SAYED KARIM '' WARDAK '' Engineering Department Drawing Title:
3 Approved by M.Ashraf '' Himmat '' (Eng.Mng) Drawing No. ST-22 Village / CDC STEEL GUARD RAIL DETAILS
See Detail "D" (Bearing)

150
650 350

650 200
1250 2500 1250
5000
L
600
Steel Plates Bearing Detail

400

300
500
L
Detail "D"
No Date

Sheet No.
Revision Survey by Typical Culvert Ministry of Rural Rehabilatation and Development Scale 23 Province Project name:
1 Structural Design by SAYED KARIM '' WARDAK '' RCC BRIDGE
National Solidarity Programme(NSP) Date August,2012
34
District
2 Drawn by SAYED KARIM '' WARDAK '' Engineering Department Drawing Title:
3 Approved by M.Ashraf '' Himmat '' (Eng.Mng) Drawing No. ST-23 Village / CDC STEEL PLATES BEARING DETAILS
Embeded in Main Girders
300

3Ø16mm Steel Plate


(400x600x30)mm
Steel Plate
200 (300x500x42)mm
Free Plate Steel Plate
(Not Fixed or weld) (400x600x30)mm
3Ø16mm Embeded in Bed Block
SECTION L-L

Sheet No.
No Date Revision Survey by Typical Culvert Ministry of Rural Rehabilatation and Development Scale
24 Province Project name:
1 SAYED KARIM '' WARDAK '' RCC BRIDGE
Structural Design by National Solidarity Programme(NSP) Date August,2012
34
District
2 Drawn by SAYED KARIM '' WARDAK '' Engineering Department Drawing Title:
3 Approved by M.Ashraf '' Himmat '' (Eng.Mng) Drawing No. ST-24 Village / CDC STEEL PLATES BEARING DETAILS
See Detail "E"
(Expansion Joint)
See Detail "D"
(Bearing)
Expansion Joint Detail

Sheet No.
No Date Revision Survey by Typical Culvert Ministry of Rural Rehabilatation and Development Scale 25 Province Project name:
1 Structural Design by SAYED KARIM '' WARDAK '' 34 RCC BRIDGE
National Solidarity Programme(NSP) Date August,2012 District
2 Drawn by SAYED KARIM '' WARDAK '' Engineering Department Drawing Title:
3 Approved by M.Ashraf '' Himmat '' (Eng.Mng) Drawing No. ST-25 Village / CDC EXPANSION JOINTS DETAILS
Hole Rubber (60x50x10)mm
L=5m
(L=5m)

Sheet No.
No Date Revision Survey by Typical Culvert Ministry of Rural Rehabilatation and Development Scale 26 Province Project name:
1 Structural Design by SAYED KARIM '' WARDAK '' 34 RCC BRIDGE
National Solidarity Programme(NSP) Date August,2012 District
2 Drawn by SAYED KARIM '' WARDAK '' Engineering Department Drawing Title:
3 Approved by M.Ashraf '' Himmat '' (Eng.Mng) Drawing No. ST-26 Village / CDC EXPANSION JOINTS DETAILS
2 2x6Ø20mm (L= 4940+200+200 = 5340)
200

200
4940
001
140
3 2x34, 2LeggedØ10mm
440

(L= 940*2+440*2+100*2 = 2960) 5 2x26, 2LeggedØ12mm

250
940 (L= 140+250+150+1770+290

2020
+2020+100+100 = 4820)
00

150
440 1

1770
4 2x34, 2LeggedØ10mm
(L= 440*2+240*2+100*2 = 1560)
240 290
6 2x14Ø10mm (L= 4940+100+100 = 5140)
100

4940
Bed Block And Back Wall Steel bars Cutting Details

Sheet No.
No Date Revision Survey by Typical Culvert Ministry of Rural Rehabilatation and Development Scale 27 Province Project name:
1 Structural Design by SAYED KARIM '' WARDAK '' RCC BRIDGE
National Solidarity Programme(NSP) Date August,2012
34
District
2 Drawn by SAYED KARIM '' WARDAK '' Engineering Department Drawing Title:
3 Approved by M.Ashraf '' Himmat '' (Eng.Mng) Drawing No. ST-27 Village / CDC BED.BACK WALL BARS CUTTING.DET
7 2x18Ø10mm (L= 2920+140+140 = 3200)
140

2919
8 2x13Ø10mm (L= 4940+100+100 = 5140)
100

100
4940
9 4x25Ø10mm (L= 2276+140+140 = 2556)
140

2276
10 4x10Ø10mm (L= 6940+100+100 = 7140)
100

100
6940
Abutments & Wing walls Steel bars Cutting Details

Sheet No.
No Date Revision Survey by Typical Culvert Ministry of Rural Rehabilatation and Development Scale
28 Province Project name:
1 Structural Design by SAYED KARIM '' WARDAK '' RCC BRIDGE
National Solidarity Programme(NSP) Date August,2012
34
District
2 Drawn by SAYED KARIM '' WARDAK '' Engineering Department Drawing Title:
3 Approved by M.Ashraf '' Himmat '' (Eng.Mng) Drawing No. ST-28 Village / CDC ABUTMENT,WINGWALL BARS.CTT.D
11 2x27Ø12mm (L= 4940+100+100 = 5140)
100

4940
12 2x34Ø12mm (L= 3940+100+100 = 4140) 15 2x75, 2LeggedØ10mm
450
100

(L= 550*2+450*2+100*2 = 2200)


3940 550
15 2x75, 2LeggedØ10mm

450
13 2x27Ø12mm (L= 4940+100+100 = 5140)
(L= 450*2+181*2+100*2 = 1462)
100

181
4940
14 2x34Ø12mm (L= 3940+100+100 = 4140) 16 2x4Ø12mm (L= 4140+100+100 = 4340)
100

100
3940 4140
16 2x4Ø12mm (L= 11600+200+3360 = 15160)

100
11600 3360
Approach slabs & Curbs Steel bars Cutting Details 720

Sheet No.
No Date Revision Survey by Typical Culvert Ministry of Rural Rehabilatation and Development Scale
29 Province Project name:
1 Structural Design by SAYED KARIM '' WARDAK '' RCC BRIDGE
National Solidarity Programme(NSP) Date August,2012
34
District
2 Drawn by SAYED KARIM '' WARDAK '' Engineering Department Drawing Title:
3 Approved by M.Ashraf '' Himmat '' (Eng.Mng) Drawing No. ST-29 Village / CDC APPROACH SLAB BARS CUTTING.DET
17 1x96Ø16mm (L= 4940+100+100 = 5140)
100

4940
18 1x27Ø12mm (L= 100+11600+3360+100 = 15160)
100

11600 3360
720
19 1x96Ø12mm (L= 4940+100+100 = 5140)
100

4940
20 1x22Ø10mm (L= 100+11600+3360+100 = 15160)
100
11600 3360
720
RCC Deck slab Steel bars Cutting Details

Sheet No.
No Date Revision Survey by Typical Culvert Ministry of Rural Rehabilatation and Development Scale 30 Province Project name:
1 Structural Design by SAYED KARIM '' WARDAK '' 34 RCC BRIDGE
National Solidarity Programme(NSP) Date August,2012 District
2 Drawn by SAYED KARIM '' WARDAK '' Engineering Department Drawing Title:
3 Approved by M.Ashraf '' Himmat '' (Eng.Mng) Drawing No. ST-30 Village / CDC DECK SLAB STEEL BARS CUTTING.D
21 2x10Ø28mm (L= 200+11500+4386+200 = 16286)

200
1700
11500
4386

0
10
25 31x2x2x2=248,
22 2x5Ø28mm (L= 200+9200+200 = 9600)

1290
2LeggedØ10mm
200

200
9200 (L= 1290*2+197*2
197 +100*2 = 3174)
23 3x4Ø16mm (L= 100+11600+3600+100 = 15400)

0
10
100

11600 960
26 20x2x2x2=160,

1290
3600 2LeggedØ10mm
(L= 1290*2+197*2+
100*2 = 3174)
24 2x5Ø25mm (L= 200+11500+4240+200 = 16140) 197
200
1500 4240 Main Girders Steel bars Cutting Details
11500

Sheet No.
No Date Revision Survey by Typical Culvert Ministry of Rural Rehabilatation and Development Scale 31 Province Project name:
1 Structural Design by SAYED KARIM '' WARDAK '' RCC BRIDGE
National Solidarity Programme(NSP) Date August,2012
34
District
2 Drawn by SAYED KARIM '' WARDAK '' Engineering Department Drawing Title:
3 Approved by M.Ashraf '' Himmat '' (Eng.Mng) Drawing No. ST-31 Village / CDC MAIN GIRDERS STEEL BARS CUTTING
0
10

27 4x5Ø20mm (L= 150+2780+150 = 3080)


30 20x5=100, 2LeggedØ10mm
150

1120
2780
(L= 1120*2+240*2+100*2 = 2920)
28 4x5Ø20mm (L= 150+2896+150 = 3196) 240
150

2896
31 73Ø8mm (L= 3800)
29 3x2*5Ø16mm (L= 100+2780+100 = 2980) 3800
100

2780 32 20Ø8mm (L= 14240)


14240
Cross Girders & Wearing.Coat Steel bars Cutting Details

Sheet No.
No Date Revision Survey by Typical Culvert Ministry of Rural Rehabilatation and Development Scale 32 Province Project name:
1 Structural Design by SAYED KARIM '' WARDAK '' 34 RCC BRIDGE
National Solidarity Programme(NSP) Date August,2012 District
2 Drawn by SAYED KARIM '' WARDAK '' Engineering Department Drawing Title:
3 Approved by M.Ashraf '' Himmat '' (Eng.Mng) Drawing No. ST-32 Village / CDC CROSS.G, W.C STEEL BARS CUTTING
STEEL BARS CHART
Bar Nomination Bar dia Num. of Length Total length Weight Total weight Total weight +
Number (#) Bar Location. Shape of bar
(mm) bar (m) (m) (kg/m) (kg) 5 % (kg)
1 Bed Blocks 20 20 5.340 106.80 2.47 263.80 277
2 Bed Blocks 20 12 5.340 64.08 2.47 158.28 167
3 Bed Blocks 10 68 2.960 201.28 0.62 124.80 131
4 Bed Blocks 10 68 1.560 106.08 0.62 65.77 69
5 Backwalls 12 52 4.820 250.64 0.888 222.57 224
6 Backwalls 10 28 5.140 143.92 0.62 89.23 94
7 Abutments 10 36 3.200 115.20 0.62 71.42 75
8 Abutments 10 26 5.140 133.64 0.62 82.85 87
9 Wingwalls 10 100 2.556 255.60 0.62 158.47 167
10 Wingwalls 10 40 7.140 285.60 0.62 177.07 186
11 Approach.S 12 54 5.140 277.56 0.888 247.47 259
12 Approach.S 12 68 4.140 281.52 0.888 249.99 263
13 Approach.S 12 54 5.140 277.56 0.888 247.47 259
14 Approach.S 12 68 4.140 281.52 0.888 249.99 263
15 Safety Curb 10 150 2.200 330.00 0.62 204.60 215
15 Safety Curb 10 150 1.462 219.30 0.62 135.97 143
16 Safety Curb 12 8 4.340 34.72 0.888 30.83 33
16 Safety Curb 12 8 15.160 121.28 0.888 107.70 113
17 Deck Slab 16 96 5.140 493.44 1.58 779.63 819
18 Deck Slab 12 27 15.160 409.32 0.888 363.48 382
19 Deck Slab 12 96 5.140 493.44 0.888 438.17 460
20 Deck Slab 10 22 15.160 333.52 0.62 206.78 218
21 M.Girders 28 20 16.286 325.72 4.83 1573.22 1652
22 M.Girders 28 10 9.600 96.00 4.83 463.68 487
23 M.Girders 16 12 15.400 184.8 1.58 291.98 307
No Date

Sheet No.
Revision Survey by Typical Culvert Ministry of Rural Rehabilatation and Development Scale Province Project name:
33
1 Structural Design by SAYED KARIM '' WARDAK '' RCC BRIDGE
National Solidarity Programme(NSP) Date August,2012
34
District
2 Drawn by SAYED KARIM '' WARDAK '' Engineering Department Drawing Title:
3 Approved by M.Ashraf '' Himmat '' (Eng.Mng) Drawing No. ST-33 Village / CDC STEEL BARS CHART
STEEL BARS CHART
Bar Nomination Bar dia Num. of Length Total length Weight Total weight Total weight +
Number (#) Bar Location. Shape of bar
(mm) bar (m) (m) (kg/m) (kg) 5 % (kg)
24 M.Girders 25 10 16.140 161.40 3.85 621.39 653
25 M.Girders 10 248 3.174 787.15 0.62 488.03 513
26 M.Girders 10 160 3.174 507.84 0.62 314.86 331
27 Cro.Girders 20 20 3.080 61.60 2.47 152.15 160
28 Cro.Girders 20 20 3.196 63.92 2.47 157.88 166
29 Cro.Girders 16 30 2.980 89.40 1.58 141.25 149
30 Cro.Girders 10 100 2.920 292.00 0.62 181.04 190
31 W.Coat 8 73 3.800 277.40 0.40 110.96 117
32 W.Coat 8 20 14.240 284.8 0.40 113.92 120
Total Weight of 20mm Steel Bars (Kg) 770
Total Weight of 10mm Steel Bars (Kg) 2419
Total Weight of 12mm Steel Bars (Kg) 2256
Total Weight of 16mm Steel Bars (Kg) 1275
Total Weight of 28mm Steel Bars (Kg) 2139
Total Weight of 25mm Steel Bars (Kg) 653
Total Weight of 8mm Steel Bars (Kg) 237
Total Required Weight of Steel Bars (Kg) 9749

Sheet No.
No Date Revision Survey by Typical Culvert Ministry of Rural Rehabilatation and Development Scale 34 Province Project name:
1 Structural Design by SAYED KARIM '' WARDAK '' RCC BRIDGE
National Solidarity Programme(NSP) Date August,2012
34
District
2 Drawn by SAYED KARIM '' WARDAK '' Engineering Department Drawing Title:
3 Approved by M.Ashraf '' Himmat '' (Eng.Mng) Drawing No. ST-34 Village / CDC STEEL BARS CHART
NATIONAL SOLIDARITY PROGRAMME (NSP)
Province Span(m) 13.1
District Volume Sheet of 13.1m RCC Bridge Width(m) 5
CDC Name Heigth(m) 3.5

Activiteis NO Description of Activiteis Length(m) Width(m) Heigth(m) Quantiy Unit Number Total Quantiy Remarks

3
1.01 Excavation of Abutment foundation 6 5.5 4.00 132.00 m 2 264.00 Changeable
A1 3
1.02 Excavation of Wing wall foundation 8 4.6 4.00 147.20 m 4 588.80 Changeable
3
Total Excavation of Foundation (m ) 852.80
2.01 Dry stone Patching under Abutment 5.00 4.40 0.30 6.60 m3 2 13.20
A2 2.02 Dry stone Patching under Wing wall 7.00 3.60 0.30 7.56 m3 4 30.24
2.03 Dry stone Patching under Approach.S 4.00 5.00 0.30 6.00 m3 2 12.00
Total dry Stone Patching (m3) 55.44
3
3.01 Abutment Stone masonry (step 1) (1:4) 5.00 4.00 2.00 40.00 m 2 80.00
3
3.02 Abutment Stone masonry (step 2) (1:4) 5.00 3.05 0.8 12.20 m 2 24.40
3
153.96
3.03 Abutment Stone masonry (step 3) (1:4) 5.00 2.4 1 12.00 m 2 24.00
3
3.04 Abutment Stone masonry (step 4) (1:4) 5.00 1.42 1.8 12.78 m 2 25.56
3
A3 3.05 Wingwall Stone masonry (step 1) (1:4) 7.00 3.2 2 44.80 m 4 179.20
3
3.06 Wingwall Stone masonry (step 2) (1:4) 7.00 2.36 0.8 13.22 m 4 52.86
3
3.07 Wingwall Stone masonry (step 3) (1:4) 7.00 2.263 0.65 10.30 m 4 41.19 371.17
3
3.08 Wingwall Stone masonry (step 4) (1:4) 7.00 1.765 1.65 20.39 m 4 81.54
3
3.09 Wingwall Stone masonry (step 5) (1:4) 7.00 0.65 0.9 4.10 m 4 16.38
Total Stone Masonry (1:4) (m3) 525.13
2
4.01 Pointing Abutment wall M-400 (1:3) 5.00 3.8 19.00 m 2 38.00
A4 2
4.02 Pointing of wing wall M-400 (1:3) 7.00 4.3 30.10 m 4 120.40
Total pointing (1:3) (m2) 158.40
5.01 20 mm Steel Bars 770 Kg 1 770
5.02 10 mm Steel Bars 2419 Kg 1 2419
5.03 12 mm Steel Bars 2256 Kg 1 2256
5.04 16 mm Steel Bars 1275 Kg 1 1275 9749.00
A5
5.05 28 mm Steel Bars 2139 Kg 1 2139
5.06 25 mm Steel Bars 653 Kg 1 653
5.07 8 mm Steel Bars 237 Kg 1 237
5.08 1 mm Binding wire 70 Kg 1 70
Total Steel Reinforcement (Kg) 9819.00
3
6.01 RCC of Abutment strip beam M-150 5.0 2.988 0.2 2.99 m 2 5.98
A6 3
6.02 RCC of Wing walls strip beam M-150 7.00 2.35 0.2 3.29 m 4 13.16
Total RCC M-150 (1:2:4) (m3) 19.14
3
7.01 RCC of Bed Block M-250 (1:1:2) 5.0 1.00 0.500 2.50 m 2 5.00
3
7.02 RCC of Backwall M-250 (1:1:2) 5.0 0.35 1.330 2.33 m 2 4.66
3
7.03 RCC of Backwall M-250 (1:1:2) 5.0 0.20 0.250 0.25 m 2 0.50
3
7.04 RCC of Main Girders M-250 (1:1:2) 14.3 0.40 1.150 6.58 m 2 13.16
3
7.05 RCC of Cross Girders M-250 (1:1:2) 2.1 0.30 1.000 0.63 m 5 3.15
3
A7 7.06 RCC of Deck Slab M-250 (1:1:2) 14.3 5.00 0.200 14.30 m 1 14.30
3
7.07 RCC of Deck Slab M-250 (1:1:2) 14.3 1.05 0.053 0.79 m 2 1.58
3
7.08 RCC of Wearing coat M-250 (1:1:2) 14.3 3.80 0.065 3.53 m 1 3.53
3
7.09 RCC of Approach Slab M-250 (1:1:2) 4.00 5 0.250 5.00 m 2 10.00
3
7.1 RCC of deck slab curbs M-250 (1:1:2) 14.30 0.6 0.300 2.57 m 2 5.15
3
7.11 RCC of Approach slab Curbs M-250 (1:1:2) 4.2 0.6 0.25 0.63 m 2 1.26
Total RCC M-250 (1:1:2) (m3) 62.28
3
8.01 PCC Under Abutment wall M-150 (1:2:4) 5.0 4.40 0.15 3.30 m 2 6.60
3
A8 8.02 PCC Under Wing wall M-150 (1:2:4) 7.0 3.60 0.15 3.78 m 4 15.12
3
8.03 PCC Top of wing wall M-150 (1:2:4) 7.0 0.60 0.10 0.42 m 4 1.68
Total PCC M-150 ( 1:2:4) (m3) 23.40
3
9.01 Back filling of Abutment foundation 6 1.00 4.00 24.00 m 2 48.00 Changeable
3
9.02 filling Back of Abutment wall (Lift side) 4.2 6.00 3.40 85.68 m 2 171.36 Changeable
3
A9 9.03 filling Back of Abutment wall (Right side) 4.7 6.00 3.30 93.06 m 2 186.12 Changeable
3
9.04 Back filling of Wing Wall foundation 8 1.00 4.00 32.00 m 4 128.00 Changeable
3
9.05 filling Back of Wing wall 3 5.00 1.5 22.50 m 4 90.00 Changeable
Total Compacted Back Filling (m3) 623.48
Steel Plates Bearings 4 Set
Angle (60x60x6mm) for expansion joint 5 m 4 20 m
Steel plates(120x6mm) 5 m 2 10 m
Hole Rubber(60x50x10mm) 5 m 2 10 m
PVC Pipes Diameter 75mm 18 m
100mm PVC Pipes for Cables lining 22.7 m 2 45.4 m
Steel I-Beam (Size 13cm) with.fixing 72 m 6 Rods of 12m
Steel G.I Pipes (dia 8cm) with fixing 132 m 11 Rods of 12m
Oil paint Orange color (3 coat) 30 kg
Oil paint Black color (3 coat) 20 kg
Oil paint White color (3 coat) 20 kg

Note: This Volume sheet has prepared as per design drawings of this bridge, so it should not be use for every site of bridge, Because every site
and location of bridge diffrence with each other, therefore it is necessary to prepared new estimation sheet for each new location as per new
technical survey and not this estimation sheet for every places of bridge sites ,specially should be re estimated voulmes of excavatioan,
abutments, wing walls and back filling for new BoQ of new bridge, other side, water diverting and dewatering in the time of construction of
abutments and wing walls also important issue and should be consider a mount of budget according to survey in BoQ for this activities.