0% found this document useful (0 votes)
11 views

Relay recloser

Tcc curve

Uploaded by

Bruno Samos
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views

Relay recloser

Tcc curve

Uploaded by

Bruno Samos
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Amps X 100 BAL-13.8 (Nom. kV=13.8, Plot Ref. kV=13.

8)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 500

300 300

100 100

BAL-587-W2 - P - 51
50 OC1 50
Schweitzer
30
551 30
CT Ratio 1200:5
U3 - U.S. Very Inverse
Pickup = 5.1 (0.5 - 16 Sec - 5A)
Time Dial = 2.38
10
3x = 1.38 s, 5x = 0.614 s, 8x = 0.376 s 10
BAL-351_REV - P - 51
OC1 - 67
5 Schweitzer 5
Seconds

Seconds
351
3 CT Ratio 1200:5 3
U3 - U.S. Very Inverse
Pickup = 0.7 (0.02 - 3.2 Sec - 1A)
Time Dial = 2.28
3x = 1.33 s, 5x = 0.588 s, 8x = 0.36 s
1 1

.5
BAL-01R - P .5
TCC 1 ∆ 0.2 s BAL-587-W2 - 3P
∆ 0.203 s
.3
Cooper .3
Form 6 ∆ 0.231 s
ANSI - Extremely Inverse
Pickup = 300 (5 - 800 Primary)
High Current = 16.558 (1 - 32 xTOC Pickup)
.1
Time Delay = 0.118 s BAL-351_REV - 3P .1
Interrupting Time = 45 ms
Minimum Response Time = 0.01 s
3x = 3.69 s, 5x = 1.34 s, 8x = 0.614 s
.05 .05
Clearing

.03 .03

OCR
OCR
BAL‐587‐W2
BAL‐351_REV

BAL‐01R

.01 79
.01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 100 BAL-13.8 (Nom. kV=13.8, Plot Ref. kV=13.8)


ETAP Star 22.5.0C

Project: BEL Transmission System 2023 Date: 24-07-2024


Location: Belize SN: BELIZE-ELE
Contract: Rev: Base
Engineer: Bruno Samos Fault: Phase
Filename: C:\Users\bsamos\Downloads\ETAP_2024_version5\BEL ETAP MODEL 2024.OTI
Phase coordination

You might also like