0% found this document useful (0 votes)
20 views1 page

Transmittal of Document

This document is a transmittal for a proposal regarding cable routing under request number J17082-03. It includes details about the submission, such as the item reference, revision date, and the need for approval and comments. The document is certified by the project manager and includes a section for the consultant's comments and approval status.

Uploaded by

pc.sardi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views1 page

Transmittal of Document

This document is a transmittal for a proposal regarding cable routing under request number J17082-03. It includes details about the submission, such as the item reference, revision date, and the need for approval and comments. The document is certified by the project manager and includes a section for the consultant's comments and approval status.

Uploaded by

pc.sardi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Project Employer: Request No.

J17082-03 J17082-03-AAC-DC-

Engineer: Contractor: Date:

Fab 22, 2021

Transmittal of Document
1. Subject of Description
Proposal for Cable routing
Area of application:

2. Submittal details
Item Reference Rev. Date Copies Description

J17082-03-AAC-DC-
0 22-2-2021 2

These are transmitted for


Your Information Approval Checking Review and comment
X X
We certify that the above documents have been coordinated
Submitted By: Abdullah Tarawneh
Project Manager: Nabil Jaradat Signature:

Consultant’s Comments: Approved


Approved as noted
Revise and Resubmit
Rejected

Signature Date: / / 2021

Approval shall not relieve Contractor of his liabilities under the Contract constitutive authorization of any change to
Contract Documents.

You might also like