0% found this document useful (0 votes)
12 views4 pages

P-101 Seal

The document is a mechanical seal drawing for the Boiler Feed Water Pump P-101 A/B/C of Jam Petrochemical Company, associated with project number 1410-2392. It includes a revision record sheet indicating the pages that have been revised. The document was issued for approval on July 14, 2015.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views4 pages

P-101 Seal

The document is a mechanical seal drawing for the Boiler Feed Water Pump P-101 A/B/C of Jam Petrochemical Company, associated with project number 1410-2392. It includes a revision record sheet indicating the pages that have been revised. The document was issued for approval on July 14, 2015.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Jam Petrochemical Company

BOILER FEED WATER PUMP P‐101 A/B/C


MECHANICAL SEAL DRAWING

Vendors Project No.: 1410‐2392 Document No.: 2392‐BFW‐2006

A0 14‐07‐15 Issued for Approval A.S J.VV JV.V


Rev. Date Description Prepared Checked Approved PROJ.MGR
Jam Petrochemical Company

REVISION RECORD SHEET


Page number A0 A1 A2 A3 A4 A5 Remarks
1 X
2 X
3 X
4 X
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

You might also like