0% found this document useful (0 votes)
2 views

ITP- lighting control system

The document is an Inspection Test Plan (ITP) for the installation and testing of a lighting control system at the AMAALA Staff Village. It outlines the responsibilities, tasks, and inspection requirements for various activities including document review, material receiving, work execution, testing, and activity close-out. The plan specifies the necessary approvals and inspections needed at each stage to ensure compliance with project specifications and quality standards.

Uploaded by

engineertakbeer
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2 views

ITP- lighting control system

The document is an Inspection Test Plan (ITP) for the installation and testing of a lighting control system at the AMAALA Staff Village. It outlines the responsibilities, tasks, and inspection requirements for various activities including document review, material receiving, work execution, testing, and activity close-out. The plan specifies the necessary approvals and inspections needed at each stage to ensure compliance with project specifications and quality standards.

Uploaded by

engineertakbeer
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Inspection Test Plan

RSG-CN-TMP-0013

ITP No/ Issue Date Approved on Discipline


Title of the activity : lighting control system
installation, for AMAALA Staff Village – Zone # 5 –
Installation & Testing of Lighting
Support Assets Buildings 1SV10110-110C25-SIA-ITP-EL-0022-C0/22-Apr-2025 Control System
Electrical

Project Name Contract # Contractor Sub-Contractor

Package Name 1SV10110-110C25 SIA SIAC International for Contracting Power Construction

Responsibility
Reference/ Controlling
Item No Task/Activity Frequency Record Remarks
Document
3rd Party Contractor Employer

1.0 Document Review

Prior to Activity Commencement and Prior


Approval of lighting cotrol system - Project Specifications 260536 & IFC Drawings & Material Approved Method
1.1 to any subsequent Design Changes / N/A R/H R/H
Method Statement Requirements Statement
modification

2.0 Material Receiving

Approved Material Submittal, Material Delivery Note & Project Specification- 260923-2 &
2.1 Inspection of material Received at Site
260926-2 All Supplied Quantities MIR N/A H H Visual inspection

Project Specification- 260923 & 260926, Approved Method Statement & Manufacturer
2.2 Product Storage and Handling
Recommendation All Supplied Quantities MIR N/A s S Visual inspection

3.0 Work Execution

Project Specification- 260926-3.1, Approved Drawing,


3.1 Lighting Control Panel Installation inspection Approved MAR, Approved MIR, Approved Checklist & all installed quantities WIR N/A H H Visual inspection
Approved MTS

Project Specification- 260926-3.1, Approved Drawing,


3.2 Installation of Motion Sensor Approved MAR, Approved MIR, Approved Checklist & all installed quantities WIR N/A H H Visual inspection
Approved MTS

Project Specification- 260926-3.1, Approved Drawing,


3.3 Installation of Presence Sensor Approved MAR, Approved MIR, Approved Checklist & all installed quantities WIR N/A H H Visual inspection
Approved MTS

Project Specification- 260926-3.1, Approved Drawing,


3.4 Installation of Presence Detector Approved MAR, Approved MIR, Approved Checklist & all installed quantities WIR N/A H H Visual inspection
Approved MTS

Project Specification- 260926-3.1, Approved Drawing,


3.5 Contactor Installation inspection Approved MAR, Approved MIR, Approved Checklist & all installed quantities WIR N/A H H Visual inspection
Approved MTS

Project Specification- 260926-3.1, Approved Drawing,


3.6 Wiring Installation inspection Approved MAR, Approved MIR, Approved Checklist & all installed quantities WIR N/A H H Visual inspection
Approved MTS

4.0 Testing

Project Specification- 260926-3.C-1, Approved Drawing, Approved


4.1 Continuity Test of Circuits Each Activity N/A H W Visual inspection
MAR, Approved MIR & Approved MTS

RSG-CN-TMP-0013 1 of 2
Rev. 00, 05 May 2024
Inspection Test Plan
RSG-CN-TMP-0013

ITP No/ Issue Date Approved on Discipline


Title of the activity : lighting control system
installation, for AMAALA Staff Village – Zone # 5 –
Installation & Testing of Lighting
Support Assets Buildings 1SV10110-110C25-SIA-ITP-EL-0022-C0/22-Apr-2025 Control System
Electrical

Project Name Contract # Contractor Sub-Contractor

Package Name 1SV10110-110C25 SIA SIAC International for Contracting Power Construction

Project Specification- 260926-3.C-1, Approved Drawing, Approved


4.2 Functional Test Each Activity N/A H W Visual inspection
MAR, Approved MIR & Approved MTS

5.0 Activity Close-out

Testing &
Project Specifications 260926-3.1 & Material Requirements & Commisioning
Final Inspection for lighting control
5.1 Close-Out requirements & Approved Drawing, Manufacturer’s Each Activity Reports & WIRs / N/A R/H R/H
system Installation works
Data Sheet Warranty
Certificate

General Notes

1 Employer: An authorized employee who represents RSG and is empowered to take action in the activity. This role can be filled by a Quality Supervisor, Quality Manager, Technical Engineer, or Construction Engineer as defined in the Method Statement and PQP.

2 Review Point R: Employer shall review the task results before moving on.

3 Surveillance Point S: Monitoring work in progress, which does not require a written notification. A surveillance report may be issued to document the activity.

4 Witness Point W: The Employer shall be notified in advance, in writing, about the timing of inspections or tests. However, if there is no written approval or presence from the Employer, the inspection or test shall proceed as scheduled.

5 Hold Point H: The Employer shall be notified in advance, in writing, about the timing of inspections or tests. Subsequent activities should not be carried out without written approval from the Employer.

Legend

H Hold Point Project Quality Plan ICA Independent Commissioning Agent (Employer assigned entity)

RSG-CN-TMP-0013 2 of 2
Rev. 00, 05 May 2024

You might also like