0% found this document useful (0 votes)
4 views

itp checklist

The document outlines a commissioning checklist for an LPG system, detailing inspection descriptions and verification processes required for approval. It includes sections on piping works, installation inspections, and testing activities, along with the necessary approvals and acceptance criteria. The checklist is designed to ensure the integrity and proper functioning of the LPG system before commissioning.

Uploaded by

Akib
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views

itp checklist

The document outlines a commissioning checklist for an LPG system, detailing inspection descriptions and verification processes required for approval. It includes sections on piping works, installation inspections, and testing activities, along with the necessary approvals and acceptance criteria. The checklist is designed to ensure the integrity and proper functioning of the LPG system before commissioning.

Uploaded by

Akib
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

COMMISSIONING CHECKLIST

Reference No.:
COMMISSIONING CHECK LIST FOR LPG SYSTEM FSR-MSCEB-BG-LPG-CC-001

VERIFICATION AND APPROVAL


SL
INSPECTION DESCRIPTION STATUS (TICK) BY CONSULTANT Remarks
No
Yes No N/A
A PIPING WORKS
Have all pressure regulating devices been set to
1 provide specified and approved downstream
working pressures
Are pressure gauge (Connected to the vapor
2
space)?
Results of pressure test on pipe works were as
3 shown in the “Record of Tests” and were
considered to be satisfactory.
During the pressure testing, have all isolating
valves and quick- acting shut off valves been
4
checked and there is no leakage through them at
their fully closed positions?
Have all pressure relief valves been correctly
5
installed?
Are all pressure gauges working properly and
6
reading correct figures?
Are all emergency shut – off valves if any,
7
checked for proper functioning?

8 Are all solenoid valves intact and operational?

Ensure the integrity of the LPG system with gas


9
detection.
REMARKS/COMMENT

Client Representatives
Engineer Representative
SITE ENGINEERR QA/QC ENGINEER

Name: Name: Name:

Signature: Signature Signature:

Date: Date Date:


INSPECTION TEST PLAN
Reference No.:
INSPECTION TEST PLAN - TESTING & COMMISSIONING OF
FSR-MSCEB-BG-LPG-CC-001
LPG SYSTEM

H=Hold point An Activity which must not proceed without the Approval from the Consultant
W = Witness An Activity which required the presence of Consultant
R=Review Assessment of document/quality record for meeting applicable standards and specifications
INSPECTION TEST CODE
Visiting facilities/work site while the works/activities are in progress to assess if the works/activities meet
S = Surveillance
the acceptable criteria specified in the controlling documents.

A=Action Complete work to be done as per requirements by subcontractor / JV.

Inspection by
Activity Specification and Other
Main Activity Acceptance Criteria Frequency Verifying Document
Ref. Reference Documents
MJC MSCE
Contractor B
JV
1.0 Approvals

Project Specification Approved shop


1.1 Shop drawing No Objection /Approval R R R Once prior to commencement
Section-071616 drawing

Project Specification
1.2 Material Approval No Objection /Approval R R R Once prior to commencement Approved MAC
Section-071616

Project Specification
1.3 Method Statement No Objection /Approval R R R Once prior to commencement Approved MS
Section-071616

2.0 Work Activity

1. Check the installation has


been carried out as per
Approved drawings/Method
2.1 Installation inspection approved drawings. A S S Areawise IR
Stetement/Specification
2.Check any physical
damage of the LPG system.
Reference No.:
INSPECTION TEST PLAN - TESTING & COMMISSIONING OF
FSR-MSCEB-BG-LPG-CC-001
LPG SYSTEM

H=Hold point An Activity which must not proceed without the Approval from the Consultant
W = Witness An Activity which required the presence of Consultant
R=Review Assessment of document/quality record for meeting applicable standards and specifications
INSPECTION TEST CODE
Visiting facilities/work site while the works/activities are in progress to assess if the works/activities meet
S = Surveillance
the acceptable criteria specified in the controlling documents.

A=Action Complete work to be done as per requirements by subcontractor / JV.

Inspection by
Activity Specification and Other
Main Activity Acceptance Criteria ACG Frequency Verifying Document
Ref. Reference Documents Consulta
Contractor nt

1. Witness of test
2. Approved method
Inspection for testing of LPG Method Statement/Shop
2.2 statement A W H Areawise IR & Test Format
system drawings
3. Approved shop drawing
4. Approved shop drawing.

1. Physical check
Method Statement/Shop IR & Pre-
Inspection for Pre- 2. Approved method
2.3 drawings/Pre- A W H Areawise commissioning
commissioning of LPG statement
commissioning check list check list
system 3. Approved shop
drawing.

1. Physical check
Method Statement/Shop
Inspection for final 2. Approved method IR &
2.4 drawings/Commissioning A W H Areawise
commissioning of LPG system statement Commissionin
check list
3. Approved shop drawing. g check list