0% found this document useful (0 votes)
4 views

ST-01

The document outlines construction notes and specifications for structural elements including columns, beams, and foundations, emphasizing adherence to relevant building codes and standards. It details material requirements, reinforcement specifications, and responsibilities of the contractor regarding dimensions and structural integrity. Additionally, it provides guidelines for concrete curing, masonry work, and the use of specific materials in construction.

Uploaded by

Aaliyah Coca
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views

ST-01

The document outlines construction notes and specifications for structural elements including columns, beams, and foundations, emphasizing adherence to relevant building codes and standards. It details material requirements, reinforcement specifications, and responsibilities of the contractor regarding dimensions and structural integrity. Additionally, it provides guidelines for concrete curing, masonry work, and the use of specific materials in construction.

Uploaded by

Aaliyah Coca
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

GENERAL

SCHEDULE OF COLUMNS SCHEDULE OF BEAMS


1. CONSTRUCTION NOTES AND TYPICAL DETAILS APPLY TO ALL DRAWINGS UNLESS OTHERWISE
SHOWN OR NOTED. MODIFY TYPICAL DETAILS AS DIRECTED TO MEET SPECIAL CONDITIONS. BEAM DIMENSIONS ( MM ) TOP BARS BOTTOM BARS STIRRUPS
WEB BARS

SECOND FLOOR
2. SHOP DRAWINGS WITH ERECTION AND PLACING DIAGRAMS OF ALL STRUCTURAL FOR MARK B H LEFT SUPPORT MID SPAN RIGHT SUPPORT LEFT SUPPORT MID SPAN RIGHT SUPPORT

ENGINEER'S APPROVAL BEFORE FABRICATION. 2B1 275 550 16 6 2 6 2 6 2 2 - 10 1 @ 50, 4 @ 100, REST @ 200
3. CONTRACTOR SHALL VERIFY ALL DIMENSIONS BEFORE ALL WORK IS TO BEGIN, CHECK WITH MARK C-1 C-2 C3 2C/PC 2B2 250 500 16 5 2 5 2 5 2 1 @ 50, 4 @ 100, REST @ 200
MECHANICAL AND ELECTRICAL CONTRACTORS FOR CONDUITS, PIPE SLEEVES, ETC. TO BE 350 2B3 200 450 16 4 2 4 2 4 2 1 @ 50, 4 @ 100, REST @ 200
350
EMBEDDED IN CONCRETE. 300 200 2B4 200 300 16 3 2 3 2 3 2 1 @ 50, 4 @ 100, REST @ 200
4. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ADEQUATE SHORINGS AND RB 200 300 16 2 2 2 2 2 2 1 @ 50, 4 @ 100, REST @ 200
BRACINGS OF THE STRUCTURE FOR ALL LOADS THAT MAYBE IMPOSED DURING CONSTRUCTION.
5. IN CASE OF QUESTION ARISING FROM THE INTERPRETATION OF OR CONFLICT WITH OTHER B B
DOCUMENTS, THE ATTENTION OF THE OWNER/ENGINEER SHALL BE CALLED IN WRITING.
CONCRETE & REINFORCEMENT
COLUMN

300
350
400

300
1. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM WITH THE LATEST BUILDINGS SIZE
CODE OF AMERICAN CONCRETE INSTITUTE (ACI-318).

H
H
2. ALL CONCRETE SHALL DEVELOP A MINIMUM COMPRESSIVE STRENGTH AT THE END OF TWENTY
EIGHT (28) DAYS WITH CORRESPONDING MAXIMUM SIZE AGGREGATE AND SLUMPS AS FOLLOWS:
MAX. SIZE OF
LOCATION STRENGTH AGGREGATES MAX. SLUMP
VERTICAL BARS
a. SLAB ON GRADE, 3000 PSi (20.685 Mpa) 1 in. (25mm) 4 in. (100mm)
COL. TIES MIDSPAN SUPPORT
CURBS, PAVEMENTS,
FOOTING, JOINT HOOPS
WALL FOOTING
b. BEAMS, COLUMNS
SUSPENDED SLAB
4000 PSi (27.60 Mpa) 3/4 in. (19mm) 4 in. (100mm)
CONF. HOOPS 6 NOT TO SCALE

d. LEAN CONCRETE 2500 PSi (17.24 Mpa) 1 in. (25mm) 4 in. (100mm) 3 1 3
3. ALL REINFORCING BARS SHALL CONFORM TO PNS49 GRADE 275 S/4 S/4
TOP BARS
4. IN GENERAL, THE LATEST EDITION OF ACI-315, MANUAL OF STANDARD PRACTICE DETAILING
REINFORCED CONCRETE STRUCTURES SHALL BE ADHERED TO UNLESS OTHERWISE SHOWN
2

t
OR NOTED.
5. MAINTAIN MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS: SCHEDULE OF FOOTINGS BEAM BEAM
CONCRETE DEPOSITED DIRECTLY AGAINST GROUND 75 mm
SUSPENDED SLABS 20 mm DIMENSION ( mm ) REINFORCEMENTS D TEMP. BARS
MARK REMARKS
SLAB ON GRADE 40 mm B L t ALONG B ALONG L mm
WALLS ABOVE GRADE 25 mm
S/5 BOTTOM BARS S/5
BEAMS & COLUMNS 40 mm FOOTING ONE ( F - 1 ) 1800 1800 400 1500 SQUARE FOOTING
6. SPLICES SHALL BE SECURELY WIRED TOGETHER AND SHALL LAP OR EXTEND IN ACCORDANCE S
FOOTING TWO ( F - 2 ) 1500 1500 375 1500 SQUARE FOOTING
WITH TABLE 1 (TABLE OF LAP SPLICE AND ANCHORAGE LENGHT) UNLESS OTHERWISE SHOWN ON
DRAWINGS, SPLICES SHALL BE STAGGERED WHENEVER POSSIBLE. FOOTING THREE ( F - 3 ) 1200 1200 350 1500 SQUARE FOOTING
7. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS SHALL BE PROPERLY POSITIONED AND
SECURED IN PLACE PRIOR TO PLACING OF CONCRETE.
ONE-WAY SLABS
8. CONTRACTOR SHALL NOTE AND PROVIDE ALL MISCELLANEOUS CURBS, SILLS, STOOLS, EQUIPMENTS,
AND MECHANICAL BASES THAT ARE REQUIRED BY THE ARCHITECTURAL, ELECTRICAL, AND
MECHANICAL DRAWINGS.
9. ALL CONCRETE SHALL BE KEPT MOIST FOR A MINIMUM OF SEVEN (7) CONSECUTIVE DAYS IMMEDIATELY
AFTER POURING BY THE USE OF WET BURLAP, FOG SPRAYING, CURING COMPOUNDS OR OTHER
3 NOT TO SCALE
S/4
3
4
1 S/4
3
APPROVED METHODS. MAIN TOP BARS
10. STRIPPING OF FORMS AND SHORES:
CONCRETE CURING

t
FOUNDATION 24 HRS.
SUSPENDED SLAB EXCEPT WHEN 8 DAYS BEAM
ADDITIONAL LOADS ARE IMPOSED MAIN BARS COLUMN BEAM
PEDESTALS, COLUMNS, WALLS 2 DAYS 50 mm THK. MAIN BOT. BARS
BEAMS 21 DAYS GRAVEL BEDDING 2
11. DEVELOPMENT LENGTH FOR ALL BARS SHALL BE A MINIMUM OF 60 BAR DIAMETER, UNLESS OTHERWISE NOTED.

L
S/5 S/5
STRUCTURAL STEEL AND PLATES
1. ALL STRUCTURAL STEEL SHALL CONFORM TO ASTM (A-36) SPECIFICATIONS WITH MINIMUM YIELD STRENGTH, fy=250 MPa
S
2. ANCHOR & FASTENER BOLTS, ALL BOLTS SHALL CONFORM TO ASTM (A-307) SPECIFICATIONS. D
3. WELDING RODS, ALL WELDING RODS SHALL BE MILD STEEL ELECTRODE, LOW HYDROGEN E7018 WITH
MINIMUM YIELD STRENGTH = 420MPa t
TWO-WAY SLABS
FOUNDATION
1. FOUNDATION IS DESIGNED BASED ON NATIONAL BUILDING CODE OF THE PHILIPPINES FOR AN ALLOWABLE
SOIL BEARING CAPACITY OF 240 KPa. REINFORCEMENT SHORT SPAN LONG SPAN
2. FOUNDATION SHALL REST ON NATURAL SOIL, UNLESS OTHERWISE NOTED BY MARK t TOP BARS BOT. BARS TOP BARS BOT. BARS
REMARK
THE ENGINEER, NO PART OF THE FOUNDATION SHALL REST ON FILL. B MAIN BARS TEMP.
3. THE CONTRACTOR SHALL NOTIFY THE ENGINEER UPON COMPLETION OF FOUNDATION EXCAVATION FOR ACTUAL SOIL 4 3 1 2 4 3 1 2
CONDITIONS WHICH DO NOT CONFORM TO THE SOIL BEARING CAPACITY FOR PROPER REVISION.
S-1 125 12 10 300 150 150 300 300 150 150 300 TWO-WAY SLAB
B
MASONRY WALLS
S-2 100 10 10 150 150 150 150 ONE-WAY SLAB
1. ALL MATERIALS & WORKMANSHIP SHALL BE IN ACCORDANCE W/ THE APPLICABLE STANDARD
& SPECIFICATIONS OF THE STRUCTURAL CODE OF THE PHILIPPINES & UNIFORM BUILDING CODE.
2. MORTAR & GROUT FOR ALL CONCRETE MASONRY SHALL CONFORM TO ASTM 270 - TYPE N &
SHALL HAVE A MINIMUM OF 28 DAYS STANDARD CYLINDER COMPRESSIVE STRENGTH OF 17.5 MPa (2500 PSi).
3. ALL CHB SHALL BE LAID OUT WITH THE CELLS IN UNOBSTRUCTED VERTICAL CONTINUITY.
ALL CELLS ESPECIALLY THOSE WITH REINFORCEMENT SHALL BE FILLED WITH MORTAR.
4 NOT TO SCALE 7 TYPICAL DETAIL OF SLAB NOT TO SCALE
4. REINFORCEMENT, AS TABULATED BELOW SHALL BE PROVIDED UNLESS OTHERWISE SPECIFIED IN THE PLAN.
5. ALL MASONRY WALLS SHALL BE PROVIDED W/ STIFFENER BEAM BLOCK & STIFFENER AS REQUIRED. TOP BARS 4" THK
5.a. FOR HIGH WALLS & EVERY 3000 mm & COLUMN (BOLT) AT 3000 mm ON CENTER.
WEB BARS CHB
BOTTOM BARS
5.b. FOR DOORS & WINDOWS OPENING PROVIDE LINTEL BEAM SAME AS STIFFENER BEAM BLOCK.
V. BAR
L1 / 4 L1 / 3 L2 / 3 SPLICE 40d L2 / 4
CHB REINFORCEMENTS 6" THK 6" THK 4" THK
BLOCK REINFORCEMENT CHB CHB
THICKNESS (mm) HORIZONTAL VERTICAL
NOTES
NGL VERT. BARS NGL VERT. BARS CHB VERT. BARS
@ 300 O.C.
NGL
100 3RD LAYER OF CHB
A. MIN. LAP SPLICE = 300mm LONG FFL

300
400

100 100
400
125 B. PROVIDE RIGHT ANGLE

500
600
3RD LAYER OF CHB

600
REINFORCEMENT @ CORNERS
@ 300 O.C. @ 300 O.C.

200
200
250

200
CONCRETE HOLLOW
BLOCKS
200
250

400

STIFFENER COLUMN @ 200 mm O.C.


500 500 400
STIFFENER BEAM BLOCK 150 L1 / 5
L1 (CLEAR SPAN)
L1 / 4 L2 / 4
L2 (CLEAR SPAN)
L2 / 5 150
WF-1' WF-1 WF-2 @ 300 O.C. WF-3

1 NOT TO SCALE 5 NOT TO SCALE 8 NOT TO SCALE

C
THE ITY E Republika ng Pilipinas
OF N
Lungsod ng Quezon
G
E

IN
OF F IC

EER

OFFICE OF THE CITY ENGINEER


ST-01
Q

UE TY
ZON CI

You might also like