SPECIFICATION AND BILL OF QUANTITY FOR MAINTENANCE
OF WAJALE STREET LIGHT PROJECT
DISTRICT:-TOG WAJALE CITY ADMINISTRATION
LOCATION:-TOG-WAJALE /….on main road KABALE
PROJECT YEAR: - 2025 G.C/2017 E.C
PROJECT NAME :-MAINTENANCE OF WAJALE STREET LIGHT PROJECT
CONSULTANT NAME :-
OWNER /CLIENT: - TOG WAJALE CITY ADMINISTRATION SERVICE OFFICE/
MUNICIPALITY OFFICE
January 2025 G.C
TOG-WAJALE
ETHIOPIA
SOMALI REGIONAL STATE, TOG-WAJALE CITY ADMINISTRATION SERVICE OFFICE
LOCATION:- TOG-WAJALE CITY ADMINISTRATION, 05 KABALE,
OWNER: TOG-WAJALE CITY ADMINISTRATION SERVICE OFFICE
LOCATION:- TOG-WAJALE CITY ADMINISTRATION, ….................... KABALE on main road sides
project name;-sright light maintenance
Item Description of items Unit Quantity Rate in Total Amount in
ETB ETB
1 Luminaries/Iibka Qashafadaha laydhka ee 250w No. 12 14,700.00 176,400.00
2 Badalida & laxamadista biraha laydhka ee afka hore M 7 1,200.00 8,400.00
3 Dayactirka tiirka/pole sidan 0.00
4 a) dhagaxa/battery 250W No. 15 2800 42,000.00
5 Kabasiyayter/capacitor 250W No. 15 2600 39,000.00
6 Guluubka/Electric Light Lamps/ tubes/ Sodium No. 15 2400 36,000.00
Vapour,220v-50Hz,250 w High quality certificate, with
manufacture guarantee.
7 Xadhiga laydhka/Ground copper cable 6mm With M 200 129.5 25,900.00
complete connectors,Suidian
8 Main switch breaker 30A 3 phases/faras/Contactor No. 3 2000 6,000.00
switches 3 phase 380 v+ N,Thermal control relay 100
Amps, complete set with push- buttons used for ON &
OFF switches.
9 Main switch breaker 50A 3 phases/Knife- switches 3 No. 3 2000 6,000.00
phase ,3 x 380 v + N 100 Amps manual switches
10 Cilad sarka xadhka laydhka/service electric wire Lsm 1 16,600.00 16,600.00
11 Cilad sarka tiirka/poles laydhka/service poles/labour cost Lsm 1 15,000.00 15,000.00
12 Preparation cost of design, bill of quantity & supervision Lsm 1 20,000.00 20,000.00
13 Stright light pole decore for 15 pcs and each for 10m lsm 15
Total(Birr) 391,300.00
Add 15%VAT 58,695.00
Grand Total(Birr) 449,995.00