Assignment 4
Assignment 4
Technology, Shibpur
CLASS ASSIGNMENT-4
TRANSPORTATION ENGINEERING-2(CE3203)
Zone 1 2 3 Total
Trips produced (Pi) 700 200 0 900
Trips attracted (Aj) 0 400 500 900
The impedance and corresponding friction factors have been calibrated as follows:
Production Attraction
Zone 1 500 400
Zone 2 600 800
Zone 3 200 100
Distances (time):
1-2: 10 min; 2-3: 15 min; 3-1: 20 min
Distribute the trips using the gravity model.