page 4
page 4
11.72m 11.72m
E C3/F4
FTB
C3/F4
E B-3
C2/F3 C2/F1
C2/F2
C FTB FTB FTB
C B-1 B-2 B-2
C 8.70m
RB RB
13.08m C2/F3 13.08m
S-2 RB
WF WF
FTB B-3 B-1 RB RB
S-1
RB RB
4.60m FTB FTB FTB 4.60m B-1 S-1 B-2 4.60m
C1/F1 B-2
B-3
C1/F1 FTB
C1/F2 FTB FTB FTB B-1 RB
B B B-1 B-3 B RB
C1/F1 C1/F1
WF B-1 S-1 B-1 RB
2.40m FTB FTB 2.40m
B-1
C1/F2
A FTB
C1/F1
A B-1
D
150 MM THK SLAB ON GRADE
COMPACTED SUBGRADE
C1 C2 C3
100MM BASE COURSE 150 MM THK SLAB ON GRADE
150
VARIES
L
D
D-10 TIES 1X50,R200
FOR COL. BAR SPLICES
TIE BEAM REINFORCEMENT SEE TABLE OF MIN. LAP
(SEE DETAIL)
SPLICE LENGTH OF COL.
COLUMN TIES AS
PER SCHEDULE
REINFORCEMENT
TIE BEAM
W W
TYP. TB SECTION
D
NTS
D
D
MARK W L D H REMARKS (SEE SCHED) BARS @ 600 O.C.
GRADE 60 150 MM THK
SLAB ON GRADE
F1 NOTES:
100MM COMPACTED
BASE COURSE 1. YIELD STRESS OF HOOPS = 40 KSI
F2 W
2. D = USE MAXIMUM COLUMN DIMENSION,
F3 1/6 CLEAR HEIGHT OR 18" (450mm)
WHICHEVER IS GREATER.
F4
3. NUMBER OF HOOP TIES SAME AS PER
COLUMN TIES SCHEDULE.
WF 4. ALL CONCRETE REINFORCEMENT DETAIL
SHOULD BE DONE IN ACCORDANCE WITH
FOOTING DETAIL ACI DETAILING MANUAL 1980 PUB SP-66
5. THE CONTRACTOR SHALL NOTIFY THE ENGINEER
AFTER FOOTING EXCAVATION HAS BEEN COMPLETED,
NTS TO CONFIRM THE DESIGN SOIL BEARING CAPACITY.
FOOTING AND COLUMN TO BE ADJUSTED UPON
CONFIRMATION OF THE ACTUAL SOIL BEARING
CONNECTION DETAIL
NTS
COLUMN ELEV. SHOWING
DOWELS AND TIES SPACING DET.
NTS
CIVIL ENGINEER
P.T.R. PROPOSED TWO STOREY
RESIDENTIAL UNIT
CAD BY
AS SHOWN
CONTRACTOR ARE TO BE PREPARED & SUBMIT SHOP
DRAWING TO ARCHITECTS PRIOR TO COMMENCEMENT
OF WORKS.
6
5 S
13
ISSUED ON: CHECKED BY 4
THIS DRAWING, ACTING AS INSTRUMENT
OF SERVICE, IS THE PROPERTY OF 3
RECIO+CASAS,INC.. & CANNOT BE
PRODUCED WITHOUT THEIR WRITTEN CONSENT.
DATE DRAWN 2
ISSUED AT: SCALE AS SHOWN
ADDRESS : ADDRESS : DATE PRINTED - REPUBLIC ACT No. 545 1