0% found this document useful (0 votes)
158 views35 pages

DPWH Rainwater Harvesting Guidelines

The document outlines the Detailed Engineering Design Plan for the construction of rainwater collectors in public facilities, specifically at Sabang Elementary School in Calauag, Quezon, under the GAA 2024. It includes project approvals, quantities, and specifications for the construction process. The plan emphasizes the importance of a stake-out survey and provides guidelines for project signage and design criteria.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
158 views35 pages

DPWH Rainwater Harvesting Guidelines

The document outlines the Detailed Engineering Design Plan for the construction of rainwater collectors in public facilities, specifically at Sabang Elementary School in Calauag, Quezon, under the GAA 2024. It includes project approvals, quantities, and specifications for the construction process. The plan emphasizes the importance of a stake-out survey and provides guidelines for project signage and design criteria.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 35

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


REGION IV-A
TH
QUEZON 4 DISTRICT ENGINEERING OFFICE
GUMACA, QUEZON

C.Y.2024 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION
OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024
1. SABANG ELEMENTARY SCHOOL, CALAUAG, QUEZON
CALAUAG, QUEZON

SUBMITTED: RECOMMENDED: APPROVED:

EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO


ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
CHIEF, PLANNING AND DESIGN SECTION DATE: DATE:
DATE:
SUMMARY OF QUANTITIES

NOTE:

1. THE STAKE-OUT SURVEY BETWEEN THE CONTRACTOR AND THE GOVERNMENT


SHALL BE CONSIDERED AS THE FINAL PLAN.

2. THE ITEMS OF WORK IDENTIFIED WITH CORRESPONDING COMPUTED QUANTITIES IN


THE APPROVED JOINT AS-STAKE SURVEY PLANS WILL BE BASIS OF PAYMENT.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES C.Y. 2023 PROJECT ELOISA L. RICAFRANCA


DETAILED ENGINEERING DESIGN PLAN FOR
SUMMARY OF QUANTITIES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEERING AIDE
CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION
REGION IV-A
OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024
QUEZON 4TH DISTRICT ENGINEERING OFFICE 1. SABANG ELEMENTARY SCHOOL, CALAUAG, QUEZON PREPARED: JENNIFER C. APOHIN EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO
GUMACA, QUEZON CALAUAG, QUEZON
ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
REGIDOR G. MAPANAO CHIEF, PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE: DATE:
80 210
210
210
PROJECT BILLBOARD
50 50
BLACK TEXT

50
210

20
50

610
THIS IS WHERE YOUR TAXES GO
60
50

60
NAME OF PROJECT :
50 50

LOCATION : WHITE BACKGROUND


1220

30

NAME OF CONTRACTOR :
50

30

DATE STARTED :
50

30

CONTRACT COMPLETION DATE :


50

30

CONTRACT COST :
50

610
30

IMPLEMENTING OFFICE :
50

30

SOURCES OF FUND :
50

20

20 20 30
Department of Public Works and Highways

20 20
Text 2920 or call (02) 165-02 for any concern on this project BLACK TEXT
www.dpwh.gov.ph

10
80

1220 1220

2440

NOTES :
1. LAYOUT OF PROJECT BILLBOARD IS BASED ON DO 21, SERIES OF 2017
AND DO 11, SERIES OF 2022.
FOR SOURCE OF FUND, STATE IF DPWH REGULAR BUDGET, PRIORITY DEVELOPMENT
ASSISTANCE FUND, DEPED/DA/DAR BUDGET, CALAMITY FUND, MVUC FUND, ETC.

2. ALL DIMENSION ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED.

1 DPWH STANDARD PROJECT BILLBOARD 2 ISOMETRIC VIEW OF BILLBOARD


-
- SCALE NTS
SCALE NTS

50x75 VERTICAL
DISPLAY AREA DISPLAY AREA
1220 50x75 VERTICAL 1220 50x75 VERTICAL 1220
COCO LUMBER
COCO LUMBER (TARPAULIN 1220 x 2440 x 12 COCO LUMBER (TARPAULIN 1220 x 2440 x 5
MARINE PLYWOOD) MARINE PLYWOOD)

45° 50x75 VERTICAL


COCO LUMBER
50x75 VERTICAL 50x75 VERTICAL
COCO LUMBER COCO LUMBER

1000 50x50 WOODEN 1000 50x50 WOODEN 1000


STAKES STAKES

50x50 WOODEN
STAKES

GROUND LEVEL GROUND LEVEL GROUND LEVEL

EDGE OF ROAD
500 500 500

TRAFFIC DIRECTION

2440 2440

3 ORIENTATION 4 TYPICAL FRAME ELEVATION 5 FRONT ELEVATION (OPTION 1) 6 FRONT ELEVATION (OPTION 2)
- - - -
SCALE NTS SCALE NTS SCALE NTS SCALE NTS

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES C.Y. 2023 PROJECT PROJECT BILLBOARD ELOISA L. RICAFRANCA
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR
CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION ENGINEERING AIDE
REGION IV-A
OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024
QUEZON 4TH DISTRICT ENGINEERING OFFICE 1. SABANG ELEMENTARY SCHOOL, CALAUAG, QUEZON PREPARED: JENNIFER C. APOHIN EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO
GUMACA, QUEZON CALAUAG, QUEZON
ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
REGIDOR G. MAPANAO CHIEF, PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE: DATE:
204 250 21 459 571 459 286 190

BLACK TEXT

114
37

30
47

31
47

30
48

21 21
32 32

81
38

1220
26
38

149
38

27
38

25
40

25
38

77
38

15
2440

73
202

38
69
69
69
69

92

WHITE BACKGROUND

1220
38

25
40

77
39

25
38

25

BLACK TEXT
41

263

80
1220 1220

2440

NOTES :
1. LAYOUT OF PROJECT BILLBOARD IS BASED ON COA CIRCULAR 2013-004,
ERIES OF 2013
FOR SOURCE OF FUND, STATE IF DPWH REGULAR BUDGET, PRIORITY DEVELOPMENT
ASSISTANCE FUND, DEPED/DA/DAR BUDGET, CALAMITY FUND, MVUC FUND, ETC.

2. ALL DIMENSION ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED.


2 ISOMETRIC VIEW OF BILLBOARD
-
SCALE NTS

1 DPWH STANDARD PROJECT BILLBOARD


-
SCALE NTS

1220

50x75 VERTICAL
COCO LUMBER
DISPLAY AREA
(TARPAULIN 2440 x 2440 x 12 1220
MARINE PLYWOOD)

50x75 HORIZONTAL 1220 50x75 HORIZONTAL 50x75 HORIZONTAL


COCO LUMBER
COCO LUMBER COCO LUMBER

1220

45° 50x75 VERTICAL


COCO LUMBER
50x75 VERTICAL 50x75 VERTICAL
COCO LUMBER COCO LUMBER

1000 50x50 WOODEN 1000 50x50 WOODEN 1000


STAKES STAKES

50x50 WOODEN
STAKES

GROUND LEVEL GROUND LEVEL GROUND LEVEL

EDGE OF ROAD
500 500 500

TRAFFIC DIRECTION

2440 2440

3 ORIENTATION 4 TYPICAL FRAME ELEVATION 5 FRONT ELEVATION (OPTION 1) 6 BACK ELEVATION


- - - -
SCALE NTS SCALE NTS SCALE NTS SCALE NTS

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES C.Y. 2023 PROJECT COMMISSION ON AUDIT SIGNBOARD ELOISA L. RICAFRANCA
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR
CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION ENGINEERING AIDE
REGION IV-A
OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024
QUEZON 4TH DISTRICT ENGINEERING OFFICE 1. SABANG ELEMENTARY SCHOOL, CALAUAG, QUEZON PREPARED: JENNIFER C. APOHIN EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO
GUMACA, QUEZON CALAUAG, QUEZON
ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
REGIDOR G. MAPANAO CHIEF, PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE: DATE:
TABLE OF CONTENTS Republic of the Phillipines
Department of
GENERAL Public Works and Highway
OFFICE OF THE BUILDING OFFICIAL
G1 COVER PAGE

G2 SUMMARY OF QUANTITIES

G3 PROJECT BILLBOARD

G4 COMMISSION ON AUDIT SIGNBOARD


District/City/Municipality

ARCHITECTURAL LAND USE & ZONING

A1 VICINITY MAP
KEY PLAN
TABLE OF CONTENT
PERSPECTIVE
A2 GENERAL NOTES
ELEVATION
SECTION
PLAN

LINE & GRADE

STRUCTURAL ARCHITECTURAL
S1 DET. SLAB REINFORCEMENT,
HALF ROOF SLAB HALF FLOOR SLAB
SECTION
PLAN
1 PERSPECTIVE FOUNDATION FRAMING PLAN
A-1 NTS: SECTION
DETAIL OF MANHOLE

STRUCTURAL

PROJECT SITE
PLUMBING
N
LOPEZ-HONDAGUA

QUEZON-ALABAT-PEREZ

SANITARY

QUIRINO
HIGWAY

OLD ZIGZAG

ELECTRICAL
PROJECT SITE
ELECTRICAL
TO BICOL

TO MANILA

TALABA-SUMMIT-PANAON

LEGEND:

MAHARLIKA HIGHWAY
GUMACA-PITOGO-SAN
NARCISO
MECHANICAL
LOPEZ-CATANAUAN LOPEZ-BUENAVISTA
MECHANICAL

2 KEY PLAN 3 VICINITY MAP


A-1 NTS: A-1 NTS:

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES RECHELLE E. DELMO


VICINITY MAP
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y.2023 PROJECT ENGINEERING AIDE
REGION IV-A DETAILED ENGINEERING DESIGN PLAN FOR KEY PLAN
QUEZON 4TH DISTRICT ENGINEERING OFFICE CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION
OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024
TABLE OF CONTENT PREPARED: JENNIFER C. APOHIN EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO
GUMACA, QUEZON 1. SABANG ELEMENTARY SCHOOL, CALAUAG, QUEZON PERSPECTIVE ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
CALAUAG, QUEZON REGIDOR G. MAPANAO CHIEF, PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE: DATE:
NOTE: 100% OF ROOF AREA SHALL DRAIN TO THE TANK
GENERAL NOTES: A
ROOF FOOTPRINT
=AxB
A 5. IT IS RECOMMENDED TO CONNECT THE FOLLOWING HOUSEHOLD
2. COLLECTED WATER VOLUME CAN COMPUTED USING THE FIXTURES TO THE RAINWATER TANK SUPPLY.
B B FORMULA BELOW. a. ALL OUTDOOR TAPS
I. DESIGN CRITERIA AND SPECIFICATIONS b. ALL OUTLETS
1. DPWH DESIGN GUIDELINES CRITERIA AND STANDARD VOLUME III - COLLECTED WATER (GAL.) = ROOF CATCHMENT AREA (SQ-FT) X c. WASHING MACHINE (COLD TAP)
WATER ENGINEERING PROJECTS, 2015 EDITION. ANNUAL AVE RAINFALL DEPTH (IN) X
2. GEORGIA RAINWATER HARVESTING GUIDELINES. 0.623 (CONVERSION FACTOR). 6. SIZE OF TANK WILL VARY DEPENDING ON THE VOLUME OF RAINWATER
TO BE COLLECTED, STRUCTURAL ANALYSIS SHALL BE CONDUCTED.
II. DESIGN CONDITIONS 3. ANNUAL AVERAGE RAINFALL SHALL BE BASED ON THE HIGHEST
1. ROOF CATCHMENT AREA SHALL BE EQUIVALENT TO THE OVERALL CLIMATOLOGICAL NORMAL RECORDED BY THE PHILIPPINES 7. ALL DIMENSIONS ARE IN METERS, UNLESS OTHERWISE SPECIFIED.
FOOTPRINT OF THE BUILDING THAT DETERMINES THE COLLECTION ATMOSPHERIC, GEOPHYSICAL AND ASTRONOMICAL SERVICES
AREA. ADMINISTRATION (PAGASA) III. MATERIALS

4. ALL PLUMBING WORKS SHALL BE UNDERTAKEN BY A LICENSED ALL MATERIALS SHALL CONFORM TO THE SPECIFICATIONS AND
PLUMBER WITH THE CONSENT OF THE MANUFACTURER AND IN REQUIREMENTS SPECIFIED IN THE LATEST DPWH STANDARD
*Catchment Area of Typical Roofs ACCORDANCE WITH ALL STANDARDS, CODES AND REGULATION. SPECIFICATION (BLUE BOOK) VOLUME II AND III.

ALL TYPE OF ROOFING ACCEPTABLE


GUTTER WITH SCREEN ON TOP
6.20

2" GAP AT DOWNSPOUT 0.60 5.00 0.60


RAIN HEAD, SLOPED SCREEN
DIVERTS DEBRIS

0.60
SECOND FINER SCREEN TO PREVENT
SLOPE INSECTS FROM GETTING INTO TANK

INLET LINE

AIR RELIEF VENT WITH INSECT SCREEN

OVERFLOE PIPE WITH LOUVERED


FIRST FLUSH DIVERTER (DOWN OUTLET FOR INSECT PREVENTION
PIPE-TYPE) (100MM)

ROOF

5.00
SLOW DRIP FLOW-CONTROL VALVE
0.50 0.50

1.25
SUPPLY PIPE

0.50

2.55
2.95
SLOPE

0.15
CLEAN-OUT PIPE

0.45

3.55
NGL 0.50

0.60
1.50

ON FILL

0.60 5.00 0.60

1 ELEVATION 2 SECTION 3 PLAN


AWS-2 SCALE 1:50 MTS AWS-2 SCALE 1:50 MTS
AWS-2 SCALE 1:50 MTS

NOTE:
ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE STATED.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES RECHELLE E. DELMO


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y.2023 PROJECT
GENERAL NOTES
ENGINEERING AIDE
REGION IV-A DETAILED ENGINEERING DESIGN PLAN FOR ELEVATION
QUEZON 4TH DISTRICT ENGINEERING OFFICE CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION
OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024 SECTION PREPARED: JENNIFER C. APOHIN EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO
GUMACA, QUEZON 1. SABANG ELEMENTARY SCHOOL, CALAUAG, QUEZON PLAN ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
CALAUAG, QUEZON REGIDOR G. MAPANAO CHIEF, PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE: DATE:
2.55

L/5 0.50
#5 @ 0.1250 O.C. B.W. BENT UP EVERY
OTHER BAR @ L/5 FROM SUPPORT

0.15
0.50
#5 @ 0.1250 O.C. B.W. BENT

0.10

BARS @0.15 O.C.


UP EVERY OTHER BAR
@ L/5 FROM SUPPORT

#4 @ HORZ.

.
#3 @ 0.250 O.C. B.W. BENT
UP EVERY OTHER BAR 3

BARS @0.10 O.C.


@ L/5 FROM SUPPORT SWS-1

1.15
5 - #3 BARS B.W.
2.25

#4 @ HORZ.
1.90

.
0.15
#4 @ HORZ. BARS @0.15 O.C.

0.50
L/5 L/5
#5 @ VERT. BARS @0.10 O.C.
0.15

0.20 . 0.20
#5 @ 0.1250 O.C. B.W. BENT UP EVERY
OTHER BAR @ L/5 FROM SUPPORT

DETAILS SLAB REINFORCEMENT


1 HALF ROOF SLAB HALF FLOOR SLAB 3 SECTION PLAN
SWS-1 SCALE 1:30 MTS SWS-1 SCALE 1:30 MTS

#5 RADIAL BARS @0.35 O.C.


MEASURED FROM OUTSIDE
2.55
0.20 0.20
0.50
0.15 0.15
0.10

#4 @ HORZ. BARS @0.15 O.C.


#5 @ RADIAL BARS

0.05
@0.35 O.C. B.W.
#5 @ VERT. BARS @0.10 O.C.

0.10
4
SWS-1
0.15
2.54
2.95

2.15
1.75

#4 @ HORZ. BARS @0.15 O.C.

#5 @ VERT. BARS @0.10 O.C.


SECTION
1.70
2.10

#5 BARS @0.30 O.C. B.W.

5-#5 @ CIRCULAR BARS


#5 @ RADIAL BARS @0.35 O.C.
MEASURED FROM OUTSIDE

5 DETAIL OF MANHOLE
SWS-1 NTS:
0.20
0.25

5-#5 @ CIRCULAR BARS

0.20 0.20
0.20 0.20 0.20 0.20
2 FOUNDATION FRAMING PLAN
0.60 0.60
SWS-1 SCALE 1:30 MTS

4 SECTION
SWS-1 SCALE 1:30 MTS

NOTE:
ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE STATED.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES DET. SLAB REINFORCEMENT, RECHELLE E. DELMO


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y.2023 PROJECT HALF ROOF SLAB HALF FLOOR SLAB ENGINEERING AIDE
REGION IV-A DETAILED ENGINEERING DESIGN PLAN FOR SECTION
QUEZON 4TH DISTRICT ENGINEERING OFFICE CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION
OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024 PLAN PREPARED: JENNIFER C. APOHIN EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO
GUMACA, QUEZON 1. SABANG ELEMENTARY SCHOOL, CALAUAG, QUEZON FOUNDATION FRAMING PLAN ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
CALAUAG, QUEZON SECTION REGIDOR G. MAPANAO CHIEF, PLANNING AND DESIGN SECTION
DETAIL OF MANHOLE ARCHITECT II DATE: DATE: DATE: DATE:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION IV-A
TH
QUEZON 4 DISTRICT ENGINEERING OFFICE
GUMACA, QUEZON

C.Y.2024 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION
OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024
2. CONCEPCION ELEMENTARY SCHOOL, PLARIDEL, QUEZON
PLARIDEL, QUEZON

SUBMITTED: RECOMMENDED: APPROVED:

EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO


ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
CHIEF, PLANNING AND DESIGN SECTION DATE: DATE:
DATE:
SUMMARY OF QUANTITIES

NOTE:

1. THE STAKE-OUT SURVEY BETWEEN THE CONTRACTOR AND THE GOVERNMENT


SHALL BE CONSIDERED AS THE FINAL PLAN.

2. THE ITEMS OF WORK IDENTIFIED WITH CORRESPONDING COMPUTED QUANTITIES IN


THE APPROVED JOINT AS-STAKE SURVEY PLANS WILL BE BASIS OF PAYMENT.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES C.Y. 2023 PROJECT ELOISA L. RICAFRANCA


DETAILED ENGINEERING DESIGN PLAN FOR
SUMMARY OF QUANTITIES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEERING AIDE
CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION
REGION IV-A
OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024
QUEZON 4TH DISTRICT ENGINEERING OFFICE 2. CONCEPCION ELEMENTARY SCHOOL, PLARIDEL, QUEZON PREPARED: JENNIFER C. APOHIN EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO
GUMACA, QUEZON PLARIDEL, QUEZON
ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
REGIDOR G. MAPANAO CHIEF, PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE: DATE:
80 210
210
210
PROJECT BILLBOARD
50 50
BLACK TEXT

50
210

20
50

610
THIS IS WHERE YOUR TAXES GO
60
50

60
NAME OF PROJECT :
50 50

LOCATION : WHITE BACKGROUND


1220

30

NAME OF CONTRACTOR :
50

30

DATE STARTED :
50

30

CONTRACT COMPLETION DATE :


50

30

CONTRACT COST :
50

610
30

IMPLEMENTING OFFICE :
50

30

SOURCES OF FUND :
50

20

20 20 30
Department of Public Works and Highways

20 20
Text 2920 or call (02) 165-02 for any concern on this project BLACK TEXT
www.dpwh.gov.ph

10
80

1220 1220

2440

NOTES :
1. LAYOUT OF PROJECT BILLBOARD IS BASED ON DO 21, SERIES OF 2017
AND DO 11, SERIES OF 2022.
FOR SOURCE OF FUND, STATE IF DPWH REGULAR BUDGET, PRIORITY DEVELOPMENT
ASSISTANCE FUND, DEPED/DA/DAR BUDGET, CALAMITY FUND, MVUC FUND, ETC.

2. ALL DIMENSION ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED.

1 DPWH STANDARD PROJECT BILLBOARD 2 ISOMETRIC VIEW OF BILLBOARD


-
- SCALE NTS
SCALE NTS

50x75 VERTICAL
DISPLAY AREA DISPLAY AREA
1220 50x75 VERTICAL 1220 50x75 VERTICAL 1220
COCO LUMBER
COCO LUMBER (TARPAULIN 1220 x 2440 x 12 COCO LUMBER (TARPAULIN 1220 x 2440 x 5
MARINE PLYWOOD) MARINE PLYWOOD)

45° 50x75 VERTICAL


COCO LUMBER
50x75 VERTICAL 50x75 VERTICAL
COCO LUMBER COCO LUMBER

1000 50x50 WOODEN 1000 50x50 WOODEN 1000


STAKES STAKES

50x50 WOODEN
STAKES

GROUND LEVEL GROUND LEVEL GROUND LEVEL

EDGE OF ROAD
500 500 500

TRAFFIC DIRECTION

2440 2440

3 ORIENTATION 4 TYPICAL FRAME ELEVATION 5 FRONT ELEVATION (OPTION 1) 6 FRONT ELEVATION (OPTION 2)
- - - -
SCALE NTS SCALE NTS SCALE NTS SCALE NTS

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES C.Y. 2023 PROJECT PROJECT BILLBOARD ELOISA L. RICAFRANCA
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR
CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION ENGINEERING AIDE
REGION IV-A
OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024
QUEZON 4TH DISTRICT ENGINEERING OFFICE 2. CONCEPCION ELEMENTARY SCHOOL, PLARIDEL, QUEZON PREPARED: JENNIFER C. APOHIN EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO
GUMACA, QUEZON PLARIDEL, QUEZON
ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
REGIDOR G. MAPANAO CHIEF, PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE: DATE:
204 250 21 459 571 459 286 190

BLACK TEXT

114
37

30
47

31
47

30
48

21 21
32 32

81
38

1220
26
38

149
38

27
38

25
40

25
38

77
38

15
2440

73
202

38
69
69
69
69

92

WHITE BACKGROUND

1220
38

25
40

77
39

25
38

25

BLACK TEXT
41

263

80
1220 1220

2440

NOTES :
1. LAYOUT OF PROJECT BILLBOARD IS BASED ON COA CIRCULAR 2013-004,
ERIES OF 2013
FOR SOURCE OF FUND, STATE IF DPWH REGULAR BUDGET, PRIORITY DEVELOPMENT
ASSISTANCE FUND, DEPED/DA/DAR BUDGET, CALAMITY FUND, MVUC FUND, ETC.

2. ALL DIMENSION ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED.


2 ISOMETRIC VIEW OF BILLBOARD
-
SCALE NTS

1 DPWH STANDARD PROJECT BILLBOARD


-
SCALE NTS

1220

50x75 VERTICAL
COCO LUMBER
DISPLAY AREA
(TARPAULIN 2440 x 2440 x 12 1220
MARINE PLYWOOD)

50x75 HORIZONTAL 1220 50x75 HORIZONTAL 50x75 HORIZONTAL


COCO LUMBER
COCO LUMBER COCO LUMBER

1220

45° 50x75 VERTICAL


COCO LUMBER
50x75 VERTICAL 50x75 VERTICAL
COCO LUMBER COCO LUMBER

1000 50x50 WOODEN 1000 50x50 WOODEN 1000


STAKES STAKES

50x50 WOODEN
STAKES

GROUND LEVEL GROUND LEVEL GROUND LEVEL

EDGE OF ROAD
500 500 500

TRAFFIC DIRECTION

2440 2440

3 ORIENTATION 4 TYPICAL FRAME ELEVATION 5 FRONT ELEVATION (OPTION 1) 6 BACK ELEVATION


- - - -
SCALE NTS SCALE NTS SCALE NTS SCALE NTS

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES C.Y. 2023 PROJECT COMMISSION ON AUDIT SIGNBOARD ELOISA L. RICAFRANCA
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR
CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION ENGINEERING AIDE
REGION IV-A
OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024
QUEZON 4TH DISTRICT ENGINEERING OFFICE 2. CONCEPCION ELEMENTARY SCHOOL, PLARIDEL, QUEZON PREPARED: JENNIFER C. APOHIN EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO
GUMACA, QUEZON PLARIDEL, QUEZON
ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
REGIDOR G. MAPANAO CHIEF, PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE: DATE:
TABLE OF CONTENTS Republic of the Phillipines
Department of
GENERAL Public Works and Highway
OFFICE OF THE BUILDING OFFICIAL
G1 COVER PAGE

G2 SUMMARY OF QUANTITIES

G3 PROJECT BILLBOARD

G4 COMMISSION ON AUDIT SIGNBOARD


District/City/Municipality

ARCHITECTURAL LAND USE & ZONING

A1 VICINITY MAP
KEY PLAN
TABLE OF CONTENT
PERSPECTIVE
A2 GENERAL NOTES
ELEVATION
SECTION
PLAN

LINE & GRADE

STRUCTURAL ARCHITECTURAL
S1 DET. SLAB REINFORCEMENT,
HALF ROOF SLAB HALF FLOOR SLAB
SECTION
PLAN
1 PERSPECTIVE FOUNDATION FRAMING PLAN
A-1 NTS: SECTION
DETAIL OF MANHOLE

STRUCTURAL
PROJECT SITE
PROJECT SITE

TO PLUMBING
N MA
NI
LA

LOPEZ-HONDAGUA

QUEZON-ALABAT-PEREZ

SANITARY

QUIRINO
HIGWAY

OLD ZIGZAG

ELECTRICAL

TO BICOL ELECTRICAL

TALABA-SUMMIT-PANAON

LEGEND:

MAHARLIKA HIGHWAY
GUMACA-PITOGO-SAN
NARCISO
MECHANICAL
LOPEZ-CATANAUAN LOPEZ-BUENAVISTA
MECHANICAL

2 KEY PLAN 3 VICINITY MAP


A-1 NTS: A-1 NTS:

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES RECHELLE E. DELMO


VICINITY MAP
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y.2023 PROJECT ENGINEERING AIDE
REGION IV-A DETAILED ENGINEERING DESIGN PLAN FOR KEY PLAN
QUEZON 4TH DISTRICT ENGINEERING OFFICE CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION
OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024
TABLE OF CONTENT PREPARED: JENNIFER C. APOHIN EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO
GUMACA, QUEZON 2. CONCEPCION ELEMENTARY SCHOOL, PLARIDEL, QUEZON PERSPECTIVE ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
PLARIDEL, QUEZON REGIDOR G. MAPANAO CHIEF, PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE: DATE:
NOTE: 100% OF ROOF AREA SHALL DRAIN TO THE TANK
GENERAL NOTES: A
ROOF FOOTPRINT
=AxB
A 5. IT IS RECOMMENDED TO CONNECT THE FOLLOWING HOUSEHOLD
2. COLLECTED WATER VOLUME CAN COMPUTED USING THE FIXTURES TO THE RAINWATER TANK SUPPLY.
B B FORMULA BELOW. a. ALL OUTDOOR TAPS
I. DESIGN CRITERIA AND SPECIFICATIONS b. ALL OUTLETS
1. DPWH DESIGN GUIDELINES CRITERIA AND STANDARD VOLUME III - COLLECTED WATER (GAL.) = ROOF CATCHMENT AREA (SQ-FT) X c. WASHING MACHINE (COLD TAP)
WATER ENGINEERING PROJECTS, 2015 EDITION. ANNUAL AVE RAINFALL DEPTH (IN) X
2. GEORGIA RAINWATER HARVESTING GUIDELINES. 0.623 (CONVERSION FACTOR). 6. SIZE OF TANK WILL VARY DEPENDING ON THE VOLUME OF RAINWATER
TO BE COLLECTED, STRUCTURAL ANALYSIS SHALL BE CONDUCTED.
II. DESIGN CONDITIONS 3. ANNUAL AVERAGE RAINFALL SHALL BE BASED ON THE HIGHEST
1. ROOF CATCHMENT AREA SHALL BE EQUIVALENT TO THE OVERALL CLIMATOLOGICAL NORMAL RECORDED BY THE PHILIPPINES 7. ALL DIMENSIONS ARE IN METERS, UNLESS OTHERWISE SPECIFIED.
FOOTPRINT OF THE BUILDING THAT DETERMINES THE COLLECTION ATMOSPHERIC, GEOPHYSICAL AND ASTRONOMICAL SERVICES
AREA. ADMINISTRATION (PAGASA) III. MATERIALS

4. ALL PLUMBING WORKS SHALL BE UNDERTAKEN BY A LICENSED ALL MATERIALS SHALL CONFORM TO THE SPECIFICATIONS AND
PLUMBER WITH THE CONSENT OF THE MANUFACTURER AND IN REQUIREMENTS SPECIFIED IN THE LATEST DPWH STANDARD
*Catchment Area of Typical Roofs ACCORDANCE WITH ALL STANDARDS, CODES AND REGULATION. SPECIFICATION (BLUE BOOK) VOLUME II AND III.

ALL TYPE OF ROOFING ACCEPTABLE


GUTTER WITH SCREEN ON TOP
6.20

2" GAP AT DOWNSPOUT 0.60 5.00 0.60


RAIN HEAD, SLOPED SCREEN
DIVERTS DEBRIS

0.60
SECOND FINER SCREEN TO PREVENT
SLOPE INSECTS FROM GETTING INTO TANK

INLET LINE

AIR RELIEF VENT WITH INSECT SCREEN

OVERFLOE PIPE WITH LOUVERED


FIRST FLUSH DIVERTER (DOWN OUTLET FOR INSECT PREVENTION
PIPE-TYPE) (100MM)

ROOF

5.00
SLOW DRIP FLOW-CONTROL VALVE
0.50 0.50

1.25
SUPPLY PIPE

0.50

2.55
2.95
SLOPE

0.15
CLEAN-OUT PIPE

0.45

3.55
NGL 0.50

0.60
1.50

ON FILL

0.60 5.00 0.60

1 ELEVATION 2 SECTION 3 PLAN


AWS-2 SCALE 1:50 MTS AWS-2 SCALE 1:50 MTS
AWS-2 SCALE 1:50 MTS

NOTE:
ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE STATED.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES RECHELLE E. DELMO


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y.2023 PROJECT
GENERAL NOTES
ENGINEERING AIDE
REGION IV-A DETAILED ENGINEERING DESIGN PLAN FOR ELEVATION
QUEZON 4TH DISTRICT ENGINEERING OFFICE CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION
OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024 SECTION PREPARED: JENNIFER C. APOHIN EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO
GUMACA, QUEZON 2. CONCEPCION ELEMENTARY SCHOOL, PLARIDEL, QUEZON PLAN ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
PLARIDEL, QUEZON REGIDOR G. MAPANAO CHIEF, PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE: DATE:
2.55

L/5 0.50
#5 @ 0.1250 O.C. B.W. BENT UP EVERY
OTHER BAR @ L/5 FROM SUPPORT

0.15
0.50
#5 @ 0.1250 O.C. B.W. BENT

0.10

BARS @0.15 O.C.


UP EVERY OTHER BAR
@ L/5 FROM SUPPORT

#4 @ HORZ.

.
#3 @ 0.250 O.C. B.W. BENT
UP EVERY OTHER BAR 3

BARS @0.10 O.C.


@ L/5 FROM SUPPORT SWS-1

1.15
5 - #3 BARS B.W.
2.25

#4 @ HORZ.
1.90

.
0.15
#4 @ HORZ. BARS @0.15 O.C.

0.50
L/5 L/5
#5 @ VERT. BARS @0.10 O.C.
0.15

0.20 . 0.20
#5 @ 0.1250 O.C. B.W. BENT UP EVERY
OTHER BAR @ L/5 FROM SUPPORT

DETAILS SLAB REINFORCEMENT


1 HALF ROOF SLAB HALF FLOOR SLAB 3 SECTION PLAN
SWS-1 SCALE 1:30 MTS SWS-1 SCALE 1:30 MTS

#5 RADIAL BARS @0.35 O.C.


MEASURED FROM OUTSIDE
2.55
0.20 0.20
0.50
0.15 0.15
0.10

#4 @ HORZ. BARS @0.15 O.C.


#5 @ RADIAL BARS

0.05
@0.35 O.C. B.W.
#5 @ VERT. BARS @0.10 O.C.

0.10
4
SWS-1
0.15
2.54
2.95

2.15
1.75

#4 @ HORZ. BARS @0.15 O.C.

#5 @ VERT. BARS @0.10 O.C.


SECTION
1.70
2.10

#5 BARS @0.30 O.C. B.W.

5-#5 @ CIRCULAR BARS


#5 @ RADIAL BARS @0.35 O.C.
MEASURED FROM OUTSIDE

5 DETAIL OF MANHOLE
SWS-1 NTS:
0.20
0.25

5-#5 @ CIRCULAR BARS

0.20 0.20
0.20 0.20 0.20 0.20
2 FOUNDATION FRAMING PLAN
0.60 0.60
SWS-1 SCALE 1:30 MTS

4 SECTION
SWS-1 SCALE 1:30 MTS

NOTE:
ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE STATED.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES DET. SLAB REINFORCEMENT, RECHELLE E. DELMO


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y.2023 PROJECT HALF ROOF SLAB HALF FLOOR SLAB ENGINEERING AIDE
REGION IV-A DETAILED ENGINEERING DESIGN PLAN FOR SECTION
QUEZON 4TH DISTRICT ENGINEERING OFFICE CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION
OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024 PLAN PREPARED: JENNIFER C. APOHIN EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO
GUMACA, QUEZON 2. CONCEPCION ELEMENTARY SCHOOL, PLARIDEL, QUEZON FOUNDATION FRAMING PLAN ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
PLARIDEL, QUEZON SECTION REGIDOR G. MAPANAO CHIEF, PLANNING AND DESIGN SECTION
DETAIL OF MANHOLE ARCHITECT II DATE: DATE: DATE: DATE:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION IV-A
TH
QUEZON 4 DISTRICT ENGINEERING OFFICE
GUMACA, QUEZON

C.Y. 2024 PROJECT


DETAILED ENGINEERING DESIGN PLAN FOR
CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION
OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024
3. NABANGKA ELEMENTARY SCHOOL, GUINAYANGAN, QUEZON
GUINAYANGAN, QUEZON

SUBMITTED: RECOMMENDED: APPROVED:

EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO


ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
CHIEF, PLANNING AND DESIGN SECTION DATE: DATE:
DATE:
SUMMARY OF QUANTITIES

NOTE:

1. THE STAKE-OUT SURVEY BETWEEN THE CONTRACTOR AND THE GOVERNMENT


SHALL BE CONSIDERED AS THE FINAL PLAN.

2. THE ITEMS OF WORK IDENTIFIED WITH CORRESPONDING COMPUTED QUANTITIES IN


THE APPROVED JOINT AS-STAKE SURVEY PLANS WILL BE BASIS OF PAYMENT.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES ELOISA L. RICAFRANCA


C.Y. 2023 PROJECT SUMMARY OF QUANTITIES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR ENGINEERING AIDE
REGION IV-A CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION
QUEZON 4TH DISTRICT ENGINEERING OFFICE OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024 PREPARED: JENNIFER C. APOHIN EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO
GUMACA, QUEZON 3. NABANGKA ELEMENTARY SCHOOL, GUINAYANGAN, QUEZON
GUINAYANGAN, QUEZON ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
REGIDOR G. MAPANAO CHIEF, PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE: DATE:
80 210
210
210
PROJECT BILLBOARD
50 50
BLACK TEXT

50
210

20
50

610
THIS IS WHERE YOUR TAXES GO
60
50

60
NAME OF PROJECT :
50 50

LOCATION : WHITE BACKGROUND


1220

30

NAME OF CONTRACTOR :
50

30

DATE STARTED :
50

30

CONTRACT COMPLETION DATE :


50

30

CONTRACT COST :
50

610
30

IMPLEMENTING OFFICE :
50

30

SOURCES OF FUND :
50

20

20 20 30
Department of Public Works and Highways

20 20
Text 2920 or call (02) 165-02 for any concern on this project BLACK TEXT
www.dpwh.gov.ph

10
80

1220 1220

2440

NOTES :
1. LAYOUT OF PROJECT BILLBOARD IS BASED ON DO 21, SERIES OF 2017
AND DO 11, SERIES OF 2022.
FOR SOURCE OF FUND, STATE IF DPWH REGULAR BUDGET, PRIORITY DEVELOPMENT
ASSISTANCE FUND, DEPED/DA/DAR BUDGET, CALAMITY FUND, MVUC FUND, ETC.

2. ALL DIMENSION ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED.

1 DPWH STANDARD PROJECT BILLBOARD 2 ISOMETRIC VIEW OF BILLBOARD


-
- SCALE NTS
SCALE NTS

50x75 VERTICAL
DISPLAY AREA DISPLAY AREA
1220 50x75 VERTICAL 1220 50x75 VERTICAL 1220
COCO LUMBER
COCO LUMBER (TARPAULIN 1220 x 2440 x 12 COCO LUMBER (TARPAULIN 1220 x 2440 x 5
MARINE PLYWOOD) MARINE PLYWOOD)

45° 50x75 VERTICAL


COCO LUMBER
50x75 VERTICAL 50x75 VERTICAL
COCO LUMBER COCO LUMBER

1000 50x50 WOODEN 1000 50x50 WOODEN 1000


STAKES STAKES

50x50 WOODEN
STAKES

GROUND LEVEL GROUND LEVEL GROUND LEVEL

EDGE OF ROAD
500 500 500

TRAFFIC DIRECTION

2440 2440

3 ORIENTATION 4 TYPICAL FRAME ELEVATION 5 FRONT ELEVATION (OPTION 1) 6 FRONT ELEVATION (OPTION 2)
- - - -
SCALE NTS SCALE NTS SCALE NTS SCALE NTS

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES PROJECT BILLBOARD ELOISA L. RICAFRANCA


C.Y. 2023 PROJECT
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR ENGINEERING AIDE
REGION IV-A CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION
QUEZON 4TH DISTRICT ENGINEERING OFFICE OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024 PREPARED: JENNIFER C. APOHIN EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO
GUMACA, QUEZON 3. NABANGKA ELEMENTARY SCHOOL, GUINAYANGAN, QUEZON
GUINAYANGAN, QUEZON ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
REGIDOR G. MAPANAO CHIEF, PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE: DATE:
204 250 21 459 571 459 286 190

BLACK TEXT

114
37

30
47

31
47

30
48

21 21
32 32

81
38

1220
26
38

149
38

27
38

25
40

25
38

77
38

15
2440

73
202

38
69
69
69
69

92

WHITE BACKGROUND

1220
38

25
40

77
39

25
38

25

BLACK TEXT
41

263

80
1220 1220

2440

NOTES :
1. LAYOUT OF PROJECT BILLBOARD IS BASED ON COA CIRCULAR 2013-004,
ERIES OF 2013
FOR SOURCE OF FUND, STATE IF DPWH REGULAR BUDGET, PRIORITY DEVELOPMENT
ASSISTANCE FUND, DEPED/DA/DAR BUDGET, CALAMITY FUND, MVUC FUND, ETC.

2. ALL DIMENSION ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED.


2 ISOMETRIC VIEW OF BILLBOARD
-
SCALE NTS

1 DPWH STANDARD PROJECT BILLBOARD


-
SCALE NTS

1220

50x75 VERTICAL
COCO LUMBER
DISPLAY AREA
(TARPAULIN 2440 x 2440 x 12 1220
MARINE PLYWOOD)

50x75 HORIZONTAL 1220 50x75 HORIZONTAL 50x75 HORIZONTAL


COCO LUMBER
COCO LUMBER COCO LUMBER

1220

45° 50x75 VERTICAL


COCO LUMBER
50x75 VERTICAL 50x75 VERTICAL
COCO LUMBER COCO LUMBER

1000 50x50 WOODEN 1000 50x50 WOODEN 1000


STAKES STAKES

50x50 WOODEN
STAKES

GROUND LEVEL GROUND LEVEL GROUND LEVEL

EDGE OF ROAD
500 500 500

TRAFFIC DIRECTION

2440 2440

3 ORIENTATION 4 TYPICAL FRAME ELEVATION 5 FRONT ELEVATION (OPTION 1) 6 BACK ELEVATION


- - - -
SCALE NTS SCALE NTS SCALE NTS SCALE NTS

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES COMMISSION ON AUDIT SIGNBOARD ELOISA L. RICAFRANCA


C.Y. 2023 PROJECT
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR ENGINEERING AIDE
REGION IV-A CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION
QUEZON 4TH DISTRICT ENGINEERING OFFICE OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024 PREPARED: JENNIFER C. APOHIN EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO
GUMACA, QUEZON 3. NABANGKA ELEMENTARY SCHOOL, GUINAYANGAN, QUEZON
GUINAYANGAN, QUEZON ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
REGIDOR G. MAPANAO CHIEF, PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE: DATE:
TABLE OF CONTENTS Republic of the Phillipines
Department of
GENERAL Public Works and Highway
OFFICE OF THE BUILDING OFFICIAL
G1 COVER PAGE

G2 SUMMARY OF QUANTITIES

G3 PROJECT BILLBOARD

G4 COMMISSION ON AUDIT SIGNBOARD


District/City/Municipality

ARCHITECTURAL LAND USE & ZONING

A1 VICINITY MAP
KEY PLAN
TABLE OF CONTENT
PERSPECTIVE
A2 GENERAL NOTES
ELEVATION
SECTION
PLAN

LINE & GRADE

STRUCTURAL ARCHITECTURAL
S1 DET. SLAB REINFORCEMENT,
HALF ROOF SLAB HALF FLOOR SLAB
SECTION
PLAN
1 PERSPECTIVE FOUNDATION FRAMING PLAN
A-1 NTS: SECTION
DETAIL OF MANHOLE

TO BICOL
STRUCTURAL

PROJECT SITE

PLUMBING
N
LOPEZ-HONDAGUA

QUEZON-ALABAT-PEREZ

SANITARY

QUIRINO
HIGWAY

OLD ZIGZAG

ELECTRICAL
TO MANILA

ELECTRICAL

TO
PO
TALABA-SUMMIT-PANAON

B
OF
GU
LEGEND:

IN
AY
AN
MAHARLIKA HIGHWAY

GA
GUMACA-PITOGO-SAN

N
NARCISO CALAUAG - GUINAYANGAN ROAD

MECHANICAL
LOPEZ-CATANAUAN LOPEZ-BUENAVISTA
MECHANICAL

2 KEY PLAN 3 VICINITY MAP


A-1 NTS: A-1 NTS:

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES RECHELLE E. DELMO


VICINITY MAP
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y.2023 PROJECT ENGINEERING AIDE
REGION IV-A DETAILED ENGINEERING DESIGN PLAN FOR KEY PLAN
QUEZON 4TH DISTRICT ENGINEERING OFFICE CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION
OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024
TABLE OF CONTENT PREPARED: JENNIFER C. APOHIN EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO
GUMACA, QUEZON 3. NABANGKA ELEMENTARY SCHOOL, GUINAYANGAN, QUEZON PERSPECTIVE ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
GUINAYANGAN, QUEZON REGIDOR G. MAPANAO CHIEF, PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE: DATE:
NOTE: 100% OF ROOF AREA SHALL DRAIN TO THE TANK
GENERAL NOTES: A
ROOF FOOTPRINT
=AxB
A 5. IT IS RECOMMENDED TO CONNECT THE FOLLOWING HOUSEHOLD
2. COLLECTED WATER VOLUME CAN COMPUTED USING THE FIXTURES TO THE RAINWATER TANK SUPPLY.
B B FORMULA BELOW. a. ALL OUTDOOR TAPS
I. DESIGN CRITERIA AND SPECIFICATIONS b. ALL OUTLETS
1. DPWH DESIGN GUIDELINES CRITERIA AND STANDARD VOLUME III - COLLECTED WATER (GAL.) = ROOF CATCHMENT AREA (SQ-FT) X c. WASHING MACHINE (COLD TAP)
WATER ENGINEERING PROJECTS, 2015 EDITION. ANNUAL AVE RAINFALL DEPTH (IN) X
2. GEORGIA RAINWATER HARVESTING GUIDELINES. 0.623 (CONVERSION FACTOR). 6. SIZE OF TANK WILL VARY DEPENDING ON THE VOLUME OF RAINWATER
TO BE COLLECTED, STRUCTURAL ANALYSIS SHALL BE CONDUCTED.
II. DESIGN CONDITIONS 3. ANNUAL AVERAGE RAINFALL SHALL BE BASED ON THE HIGHEST
1. ROOF CATCHMENT AREA SHALL BE EQUIVALENT TO THE OVERALL CLIMATOLOGICAL NORMAL RECORDED BY THE PHILIPPINES 7. ALL DIMENSIONS ARE IN METERS, UNLESS OTHERWISE SPECIFIED.
FOOTPRINT OF THE BUILDING THAT DETERMINES THE COLLECTION ATMOSPHERIC, GEOPHYSICAL AND ASTRONOMICAL SERVICES
AREA. ADMINISTRATION (PAGASA) III. MATERIALS

4. ALL PLUMBING WORKS SHALL BE UNDERTAKEN BY A LICENSED ALL MATERIALS SHALL CONFORM TO THE SPECIFICATIONS AND
PLUMBER WITH THE CONSENT OF THE MANUFACTURER AND IN REQUIREMENTS SPECIFIED IN THE LATEST DPWH STANDARD
*Catchment Area of Typical Roofs ACCORDANCE WITH ALL STANDARDS, CODES AND REGULATION. SPECIFICATION (BLUE BOOK) VOLUME II AND III.

ALL TYPE OF ROOFING ACCEPTABLE


GUTTER WITH SCREEN ON TOP
6.20

2" GAP AT DOWNSPOUT 0.60 5.00 0.60


RAIN HEAD, SLOPED SCREEN
DIVERTS DEBRIS

0.60
SECOND FINER SCREEN TO PREVENT
SLOPE INSECTS FROM GETTING INTO TANK

INLET LINE

AIR RELIEF VENT WITH INSECT SCREEN

OVERFLOE PIPE WITH LOUVERED


FIRST FLUSH DIVERTER (DOWN OUTLET FOR INSECT PREVENTION
PIPE-TYPE) (100MM)

ROOF

5.00
SLOW DRIP FLOW-CONTROL VALVE
0.50 0.50

1.25
SUPPLY PIPE

0.50

2.55
2.95
SLOPE

0.15
CLEAN-OUT PIPE

0.45

3.55
NGL 0.50

0.60
1.50

ON FILL

0.60 5.00 0.60

1 ELEVATION 2 SECTION 3 PLAN


AWS-2 SCALE 1:50 MTS AWS-2 SCALE 1:50 MTS
AWS-2 SCALE 1:50 MTS

NOTE:
ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE STATED.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES RECHELLE E. DELMO


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y.2023 PROJECT
GENERAL NOTES
ENGINEERING AIDE
REGION IV-A DETAILED ENGINEERING DESIGN PLAN FOR ELEVATION
QUEZON 4TH DISTRICT ENGINEERING OFFICE CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION
OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024 SECTION PREPARED: JENNIFER C. APOHIN EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO
GUMACA, QUEZON 3. NABANGKA ELEMENTARY SCHOOL, GUINAYANGAN, QUEZON PLAN ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
GUINAYANGAN, QUEZON REGIDOR G. MAPANAO CHIEF, PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE: DATE:
2.55

L/5 0.50
#5 @ 0.1250 O.C. B.W. BENT UP EVERY
OTHER BAR @ L/5 FROM SUPPORT

0.15
0.50
#5 @ 0.1250 O.C. B.W. BENT

0.10

BARS @0.15 O.C.


UP EVERY OTHER BAR
@ L/5 FROM SUPPORT

#4 @ HORZ.

.
#3 @ 0.250 O.C. B.W. BENT
UP EVERY OTHER BAR 3

BARS @0.10 O.C.


@ L/5 FROM SUPPORT SWS-1

1.15
5 - #3 BARS B.W.
2.25

#4 @ HORZ.
1.90

.
0.15
#4 @ HORZ. BARS @0.15 O.C.

0.50
L/5 L/5
#5 @ VERT. BARS @0.10 O.C.
0.15

0.20 . 0.20
#5 @ 0.1250 O.C. B.W. BENT UP EVERY
OTHER BAR @ L/5 FROM SUPPORT

DETAILS SLAB REINFORCEMENT


1 HALF ROOF SLAB HALF FLOOR SLAB 3 SECTION PLAN
SWS-1 SCALE 1:30 MTS SWS-1 SCALE 1:30 MTS

#5 RADIAL BARS @0.35 O.C.


MEASURED FROM OUTSIDE
2.55
0.20 0.20
0.50
0.15 0.15
0.10

#4 @ HORZ. BARS @0.15 O.C.


#5 @ RADIAL BARS

0.05
@0.35 O.C. B.W.
#5 @ VERT. BARS @0.10 O.C.

0.10
4
SWS-1
0.15
2.54
2.95

2.15
1.75

#4 @ HORZ. BARS @0.15 O.C.

#5 @ VERT. BARS @0.10 O.C.


SECTION
1.70
2.10

#5 BARS @0.30 O.C. B.W.

5-#5 @ CIRCULAR BARS


#5 @ RADIAL BARS @0.35 O.C.
MEASURED FROM OUTSIDE

5 DETAIL OF MANHOLE
SWS-1 NTS:
0.20
0.25

5-#5 @ CIRCULAR BARS

0.20 0.20
0.20 0.20 0.20 0.20
2 FOUNDATION FRAMING PLAN
0.60 0.60
SWS-1 SCALE 1:30 MTS

4 SECTION
SWS-1 SCALE 1:30 MTS

NOTE:
ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE STATED.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES DET. SLAB REINFORCEMENT, RECHELLE E. DELMO


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y.2023 PROJECT HALF ROOF SLAB HALF FLOOR SLAB ENGINEERING AIDE
REGION IV-A DETAILED ENGINEERING DESIGN PLAN FOR SECTION
QUEZON 4TH DISTRICT ENGINEERING OFFICE CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION
OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024 PLAN PREPARED: JENNIFER C. APOHIN EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO
GUMACA, QUEZON 3. NABANGKA ELEMENTARY SCHOOL, GUINAYANGAN, QUEZON FOUNDATION FRAMING PLAN ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
GUINAYANGAN, QUEZON SECTION REGIDOR G. MAPANAO CHIEF, PLANNING AND DESIGN SECTION
DETAIL OF MANHOLE ARCHITECT II DATE: DATE: DATE: DATE:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION IV-A
TH
QUEZON 4 DISTRICT ENGINEERING OFFICE
GUMACA, QUEZON

C.Y. 2024 PROJECT


DETAILED ENGINEERING DESIGN PLAN FOR
CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION
OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024
4. GUITES ELEMENTARY SCHOOL, LOPEZ, QUEZON
LOPEZ, QUEZON

SUBMITTED: RECOMMENDED: APPROVED:

EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO


ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
CHIEF, PLANNING AND DESIGN SECTION DATE: DATE:
DATE:
SUMMARY OF QUANTITIES

NOTE:

1. THE STAKE-OUT SURVEY BETWEEN THE CONTRACTOR AND THE GOVERNMENT


SHALL BE CONSIDERED AS THE FINAL PLAN.

2. THE ITEMS OF WORK IDENTIFIED WITH CORRESPONDING COMPUTED QUANTITIES IN


THE APPROVED JOINT AS-STAKE SURVEY PLANS WILL BE BASIS OF PAYMENT.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES ELOISA L. RICAFRANCA


C.Y. 2024 PROJECT SUMMARY OF QUANTITIES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR ENGINEERING AIDE
REGION IV-A CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION
QUEZON 4TH DISTRICT ENGINEERING OFFICE OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024 PREPARED: JENNIFER C. APOHIN EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO
GUMACA, QUEZON 4. GUITES ELEMENTARY SCHOOL, LOPEZ, QUEZON
LOPEZ, QUEZON ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
REGIDOR G. MAPANAO CHIEF, PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE: DATE:
80 210
210
210
PROJECT BILLBOARD
50 50
BLACK TEXT

50
210

20
50

610
THIS IS WHERE YOUR TAXES GO
60
50

60
NAME OF PROJECT :
50 50

LOCATION : WHITE BACKGROUND


1220

30

NAME OF CONTRACTOR :
50

30

DATE STARTED :
50

30

CONTRACT COMPLETION DATE :


50

30

CONTRACT COST :
50

610
30

IMPLEMENTING OFFICE :
50

30

SOURCES OF FUND :
50

20

20 20 30
Department of Public Works and Highways

20 20
Text 2920 or call (02) 165-02 for any concern on this project BLACK TEXT
www.dpwh.gov.ph

10
80

1220 1220

2440

NOTES :
1. LAYOUT OF PROJECT BILLBOARD IS BASED ON DO 21, SERIES OF 2017
AND DO 11, SERIES OF 2022.
FOR SOURCE OF FUND, STATE IF DPWH REGULAR BUDGET, PRIORITY DEVELOPMENT
ASSISTANCE FUND, DEPED/DA/DAR BUDGET, CALAMITY FUND, MVUC FUND, ETC.

2. ALL DIMENSION ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED.

1 DPWH STANDARD PROJECT BILLBOARD 2 ISOMETRIC VIEW OF BILLBOARD


-
- SCALE NTS
SCALE NTS

50x75 VERTICAL
DISPLAY AREA DISPLAY AREA
1220 50x75 VERTICAL 1220 50x75 VERTICAL 1220
COCO LUMBER
COCO LUMBER (TARPAULIN 1220 x 2440 x 12 COCO LUMBER (TARPAULIN 1220 x 2440 x 5
MARINE PLYWOOD) MARINE PLYWOOD)

45° 50x75 VERTICAL


COCO LUMBER
50x75 VERTICAL 50x75 VERTICAL
COCO LUMBER COCO LUMBER

1000 50x50 WOODEN 1000 50x50 WOODEN 1000


STAKES STAKES

50x50 WOODEN
STAKES

GROUND LEVEL GROUND LEVEL GROUND LEVEL

EDGE OF ROAD
500 500 500

TRAFFIC DIRECTION

2440 2440

3 ORIENTATION 4 TYPICAL FRAME ELEVATION 5 FRONT ELEVATION (OPTION 1) 6 FRONT ELEVATION (OPTION 2)
- - - -
SCALE NTS SCALE NTS SCALE NTS SCALE NTS

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES PROJECT BILLBOARD ELOISA L. RICAFRANCA


C.Y. 2024 PROJECT
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR ENGINEERING AIDE
REGION IV-A CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION
QUEZON 4TH DISTRICT ENGINEERING OFFICE OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024 PREPARED: JENNIFER C. APOHIN EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO
GUMACA, QUEZON 4. GUITES ELEMENTARY SCHOOL, LOPEZ, QUEZON
LOPEZ, QUEZON ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
REGIDOR G. MAPANAO CHIEF, PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE: DATE:
204 250 21 459 571 459 286 190

BLACK TEXT

114
37

30
47

31
47

30
48

21 21
32 32

81
38

1220
26
38

149
38

27
38

25
40

25
38

77
38

15
2440

73
202

38
69
69
69
69

92

WHITE BACKGROUND

1220
38

25
40

77
39

25
38

25

BLACK TEXT
41

263

80
1220 1220

2440

NOTES :
1. LAYOUT OF PROJECT BILLBOARD IS BASED ON COA CIRCULAR 2013-004,
ERIES OF 2013
FOR SOURCE OF FUND, STATE IF DPWH REGULAR BUDGET, PRIORITY DEVELOPMENT
ASSISTANCE FUND, DEPED/DA/DAR BUDGET, CALAMITY FUND, MVUC FUND, ETC.

2. ALL DIMENSION ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED.


2 ISOMETRIC VIEW OF BILLBOARD
-
SCALE NTS

1 DPWH STANDARD PROJECT BILLBOARD


-
SCALE NTS

1220

50x75 VERTICAL
COCO LUMBER
DISPLAY AREA
(TARPAULIN 2440 x 2440 x 12 1220
MARINE PLYWOOD)

50x75 HORIZONTAL 1220 50x75 HORIZONTAL 50x75 HORIZONTAL


COCO LUMBER
COCO LUMBER COCO LUMBER

1220

45° 50x75 VERTICAL


COCO LUMBER
50x75 VERTICAL 50x75 VERTICAL
COCO LUMBER COCO LUMBER

1000 50x50 WOODEN 1000 50x50 WOODEN 1000


STAKES STAKES

50x50 WOODEN
STAKES

GROUND LEVEL GROUND LEVEL GROUND LEVEL

EDGE OF ROAD
500 500 500

TRAFFIC DIRECTION

2440 2440

3 ORIENTATION 4 TYPICAL FRAME ELEVATION 5 FRONT ELEVATION (OPTION 1) 6 BACK ELEVATION


- - - -
SCALE NTS SCALE NTS SCALE NTS SCALE NTS

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES COMMISSION ON AUDIT SIGNBOARD ELOISA L. RICAFRANCA


C.Y. 2024 PROJECT
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR ENGINEERING AIDE
REGION IV-A CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION
QUEZON 4TH DISTRICT ENGINEERING OFFICE OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024 PREPARED: JENNIFER C. APOHIN EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO
GUMACA, QUEZON 4. GUITES ELEMENTARY SCHOOL, LOPEZ, QUEZON
LOPEZ, QUEZON ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
REGIDOR G. MAPANAO CHIEF, PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE: DATE:
TABLE OF CONTENTS Republic of the Phillipines
Department of
GENERAL Public Works and Highway
OFFICE OF THE BUILDING OFFICIAL
G1 COVER PAGE

G2 SUMMARY OF QUANTITIES

G3 PROJECT BILLBOARD

G4 COMMISSION ON AUDIT SIGNBOARD


District/City/Municipality

ARCHITECTURAL LAND USE & ZONING

A1 VICINITY MAP
KEY PLAN
TABLE OF CONTENT
PERSPECTIVE
A2 GENERAL NOTES
ELEVATION
SECTION
PLAN

LINE & GRADE

STRUCTURAL ARCHITECTURAL
S1 DET. SLAB REINFORCEMENT,
HALF ROOF SLAB HALF FLOOR SLAB
SECTION
PLAN
1 PERSPECTIVE FOUNDATION FRAMING PLAN
A-1 NTS: SECTION
DETAIL OF MANHOLE

PROJECT SITE STRUCTURAL

PROJECT SITE
N
LOPEZ-HONDAGUA

QUEZON-ALABAT-PEREZ
PLUMBING

QUIRINO
HIGWAY
SANITARY
OLD ZIGZAG

TO B
ICO
L

ELECTRICAL

ELECTRICAL
TALABA-SUMMIT-PANAON

A
NIL
GUMACA-PITOGO-SAN

MA
NARCISO

LOPEZ-CATANAUAN LOPEZ-BUENAVISTA LEGEND: TO


MAHARLIKA HIGHWAY

HONDAGUA-ROMA ROAD

MECHANICAL
MECHANICAL

2 KEY PLAN 3 VICINITY MAP


A-1 NTS: A-1 NTS:

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES RECHELLE E. DELMO


VICINITY MAP
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT ENGINEERING AIDE
REGION IV-A DETAILED ENGINEERING DESIGN PLAN FOR KEY PLAN
QUEZON 4TH DISTRICT ENGINEERING OFFICE CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION
OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024
TABLE OF CONTENT PREPARED: JENNIFER C. APOHIN EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO
GUMACA, QUEZON 4. GUITES ELEMENTARY SCHOOL, LOPEZ, QUEZON PERSPECTIVE ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
LOPEZ, QUEZON REGIDOR G. MAPANAO CHIEF, PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE: DATE:
NOTE: 100% OF ROOF AREA SHALL DRAIN TO THE TANK
GENERAL NOTES: A
ROOF FOOTPRINT
=AxB
A 5. IT IS RECOMMENDED TO CONNECT THE FOLLOWING HOUSEHOLD
2. COLLECTED WATER VOLUME CAN COMPUTED USING THE FIXTURES TO THE RAINWATER TANK SUPPLY.
B B FORMULA BELOW. a. ALL OUTDOOR TAPS
I. DESIGN CRITERIA AND SPECIFICATIONS b. ALL OUTLETS
1. DPWH DESIGN GUIDELINES CRITERIA AND STANDARD VOLUME III - COLLECTED WATER (GAL.) = ROOF CATCHMENT AREA (SQ-FT) X c. WASHING MACHINE (COLD TAP)
WATER ENGINEERING PROJECTS, 2015 EDITION. ANNUAL AVE RAINFALL DEPTH (IN) X
2. GEORGIA RAINWATER HARVESTING GUIDELINES. 0.623 (CONVERSION FACTOR). 6. SIZE OF TANK WILL VARY DEPENDING ON THE VOLUME OF RAINWATER
TO BE COLLECTED, STRUCTURAL ANALYSIS SHALL BE CONDUCTED.
II. DESIGN CONDITIONS 3. ANNUAL AVERAGE RAINFALL SHALL BE BASED ON THE HIGHEST
1. ROOF CATCHMENT AREA SHALL BE EQUIVALENT TO THE OVERALL CLIMATOLOGICAL NORMAL RECORDED BY THE PHILIPPINES 7. ALL DIMENSIONS ARE IN METERS, UNLESS OTHERWISE SPECIFIED.
FOOTPRINT OF THE BUILDING THAT DETERMINES THE COLLECTION ATMOSPHERIC, GEOPHYSICAL AND ASTRONOMICAL SERVICES
AREA. ADMINISTRATION (PAGASA) III. MATERIALS

4. ALL PLUMBING WORKS SHALL BE UNDERTAKEN BY A LICENSED ALL MATERIALS SHALL CONFORM TO THE SPECIFICATIONS AND
PLUMBER WITH THE CONSENT OF THE MANUFACTURER AND IN REQUIREMENTS SPECIFIED IN THE LATEST DPWH STANDARD
*Catchment Area of Typical Roofs ACCORDANCE WITH ALL STANDARDS, CODES AND REGULATION. SPECIFICATION (BLUE BOOK) VOLUME II AND III.

ALL TYPE OF ROOFING ACCEPTABLE


GUTTER WITH SCREEN ON TOP
6.20

2" GAP AT DOWNSPOUT 0.60 5.00 0.60


RAIN HEAD, SLOPED SCREEN
DIVERTS DEBRIS

0.60
SECOND FINER SCREEN TO PREVENT
SLOPE INSECTS FROM GETTING INTO TANK

INLET LINE

AIR RELIEF VENT WITH INSECT SCREEN

OVERFLOE PIPE WITH LOUVERED


FIRST FLUSH DIVERTER (DOWN OUTLET FOR INSECT PREVENTION
PIPE-TYPE) (100MM)

ROOF

5.00
SLOW DRIP FLOW-CONTROL VALVE
0.50 0.50

1.25
SUPPLY PIPE

0.50

2.55
2.95
SLOPE

0.15
CLEAN-OUT PIPE

0.45

3.55
NGL 0.50

0.60
1.50

ON FILL

0.60 5.00 0.60

1 ELEVATION 2 SECTION 3 PLAN


AWS-2 SCALE 1:50 MTS AWS-2 SCALE 1:50 MTS
AWS-2 SCALE 1:50 MTS

NOTE:
ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE STATED.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES RECHELLE E. DELMO


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT
GENERAL NOTES
ENGINEERING AIDE
REGION IV-A DETAILED ENGINEERING DESIGN PLAN FOR ELEVATION
QUEZON 4TH DISTRICT ENGINEERING OFFICE CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION
OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024 SECTION PREPARED: JENNIFER C. APOHIN EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO
GUMACA, QUEZON 4. GUITES ELEMENTARY SCHOOL, LOPEZ, QUEZON PLAN ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
LOPEZ, QUEZON REGIDOR G. MAPANAO CHIEF, PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE: DATE:
2.55

L/5 0.50
#5 @ 0.1250 O.C. B.W. BENT UP EVERY
OTHER BAR @ L/5 FROM SUPPORT

0.15
0.50
#5 @ 0.1250 O.C. B.W. BENT

0.10

BARS @0.15 O.C.


UP EVERY OTHER BAR
@ L/5 FROM SUPPORT

#4 @ HORZ.

.
#3 @ 0.250 O.C. B.W. BENT
UP EVERY OTHER BAR 3

BARS @0.10 O.C.


@ L/5 FROM SUPPORT SWS-1

1.15
5 - #3 BARS B.W.
2.25

#4 @ HORZ.
1.90

.
0.15
#4 @ HORZ. BARS @0.15 O.C.

0.50
L/5 L/5
#5 @ VERT. BARS @0.10 O.C.
0.15

0.20 . 0.20
#5 @ 0.1250 O.C. B.W. BENT UP EVERY
OTHER BAR @ L/5 FROM SUPPORT

DETAILS SLAB REINFORCEMENT


1 HALF ROOF SLAB HALF FLOOR SLAB 3 SECTION PLAN
SWS-1 SCALE 1:30 MTS SWS-1 SCALE 1:30 MTS

#5 RADIAL BARS @0.35 O.C.


MEASURED FROM OUTSIDE
2.55
0.20 0.20
0.50
0.15 0.15
0.10

#4 @ HORZ. BARS @0.15 O.C.


#5 @ RADIAL BARS

0.05
@0.35 O.C. B.W.
#5 @ VERT. BARS @0.10 O.C.

0.10
4
SWS-1
0.15
2.54
2.95

2.15
1.75

#4 @ HORZ. BARS @0.15 O.C.

#5 @ VERT. BARS @0.10 O.C.


SECTION
1.70
2.10

#5 BARS @0.30 O.C. B.W.

5-#5 @ CIRCULAR BARS


#5 @ RADIAL BARS @0.35 O.C.
MEASURED FROM OUTSIDE

5 DETAIL OF MANHOLE
SWS-1 NTS:
0.20
0.25

5-#5 @ CIRCULAR BARS

0.20 0.20
0.20 0.20 0.20 0.20
2 FOUNDATION FRAMING PLAN
0.60 0.60
SWS-1 SCALE 1:30 MTS

4 SECTION
SWS-1 SCALE 1:30 MTS

NOTE:
ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE STATED.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES DET. SLAB REINFORCEMENT, RECHELLE E. DELMO


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT HALF ROOF SLAB HALF FLOOR SLAB ENGINEERING AIDE
REGION IV-A DETAILED ENGINEERING DESIGN PLAN FOR SECTION
QUEZON 4TH DISTRICT ENGINEERING OFFICE CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION
OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024 PLAN PREPARED: JENNIFER C. APOHIN EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO
GUMACA, QUEZON 4. GUITES ELEMENTARY SCHOOL, LOPEZ, QUEZON FOUNDATION FRAMING PLAN ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
LOPEZ, QUEZON SECTION REGIDOR G. MAPANAO CHIEF, PLANNING AND DESIGN SECTION
DETAIL OF MANHOLE ARCHITECT II DATE: DATE: DATE: DATE:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION IV-A
TH
QUEZON 4 DISTRICT ENGINEERING OFFICE
GUMACA, QUEZON

C.Y. 2024 PROJECT


DETAILED ENGINEERING DESIGN PLAN FOR
CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION
OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024
5. GUMACA WEST ELEMENTARY SCHOOL, GUMACA, QUEZON
GUMACA, QUEZON

SUBMITTED: RECOMMENDED: APPROVED:

EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO


ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
CHIEF, PLANNING AND DESIGN SECTION DATE: DATE:
DATE:
SUMMARY OF QUANTITIES

NOTE:

1. THE STAKE-OUT SURVEY BETWEEN THE CONTRACTOR AND THE GOVERNMENT


SHALL BE CONSIDERED AS THE FINAL PLAN.

2. THE ITEMS OF WORK IDENTIFIED WITH CORRESPONDING COMPUTED QUANTITIES IN


THE APPROVED JOINT AS-STAKE SURVEY PLANS WILL BE BASIS OF PAYMENT.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES ELOISA L. RICAFRANCA


C.Y. 2024 PROJECT SUMMARY OF QUANTITIES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR ENGINEERING AIDE
REGION IV-A CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION
QUEZON 4TH DISTRICT ENGINEERING OFFICE OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024 PREPARED: JENNIFER C. APOHIN EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO
GUMACA, QUEZON 5. GUMACA WEST ELEMENTARY SCHOOL, GUMACA, QUEZON
GUMACA, QUEZON ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
REGIDOR G. MAPANAO CHIEF, PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE: DATE:
80 210
210
210
PROJECT BILLBOARD
50 50
BLACK TEXT

50
210

20
50

610
THIS IS WHERE YOUR TAXES GO
60
50

60
NAME OF PROJECT :
50 50

LOCATION : WHITE BACKGROUND


1220

30

NAME OF CONTRACTOR :
50

30

DATE STARTED :
50

30

CONTRACT COMPLETION DATE :


50

30

CONTRACT COST :
50

610
30

IMPLEMENTING OFFICE :
50

30

SOURCES OF FUND :
50

20

20 20 30
Department of Public Works and Highways

20 20
Text 2920 or call (02) 165-02 for any concern on this project BLACK TEXT
www.dpwh.gov.ph

10
80

1220 1220

2440

NOTES :
1. LAYOUT OF PROJECT BILLBOARD IS BASED ON DO 21, SERIES OF 2017
AND DO 11, SERIES OF 2022.
FOR SOURCE OF FUND, STATE IF DPWH REGULAR BUDGET, PRIORITY DEVELOPMENT
ASSISTANCE FUND, DEPED/DA/DAR BUDGET, CALAMITY FUND, MVUC FUND, ETC.

2. ALL DIMENSION ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED.

1 DPWH STANDARD PROJECT BILLBOARD 2 ISOMETRIC VIEW OF BILLBOARD


-
- SCALE NTS
SCALE NTS

50x75 VERTICAL
DISPLAY AREA DISPLAY AREA
1220 50x75 VERTICAL 1220 50x75 VERTICAL 1220
COCO LUMBER
COCO LUMBER (TARPAULIN 1220 x 2440 x 12 COCO LUMBER (TARPAULIN 1220 x 2440 x 5
MARINE PLYWOOD) MARINE PLYWOOD)

45° 50x75 VERTICAL


COCO LUMBER
50x75 VERTICAL 50x75 VERTICAL
COCO LUMBER COCO LUMBER

1000 50x50 WOODEN 1000 50x50 WOODEN 1000


STAKES STAKES

50x50 WOODEN
STAKES

GROUND LEVEL GROUND LEVEL GROUND LEVEL

EDGE OF ROAD
500 500 500

TRAFFIC DIRECTION

2440 2440

3 ORIENTATION 4 TYPICAL FRAME ELEVATION 5 FRONT ELEVATION (OPTION 1) 6 FRONT ELEVATION (OPTION 2)
- - - -
SCALE NTS SCALE NTS SCALE NTS SCALE NTS

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES PROJECT BILLBOARD ELOISA L. RICAFRANCA


C.Y. 2024 PROJECT
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR ENGINEERING AIDE
REGION IV-A CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION
QUEZON 4TH DISTRICT ENGINEERING OFFICE OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024 PREPARED: JENNIFER C. APOHIN EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO
GUMACA, QUEZON 5. GUMACA WEST ELEMENTARY SCHOOL, GUMACA, QUEZON
GUMACA, QUEZON ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
REGIDOR G. MAPANAO CHIEF, PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE: DATE:
204 250 21 459 571 459 286 190

BLACK TEXT

114
37

30
47

31
47

30
48

21 21
32 32

81
38

1220
26
38

149
38

27
38

25
40

25
38

77
38

15
2440

73
202

38
69
69
69
69

92

WHITE BACKGROUND

1220
38

25
40

77
39

25
38

25

BLACK TEXT
41

263

80
1220 1220

2440

NOTES :
1. LAYOUT OF PROJECT BILLBOARD IS BASED ON COA CIRCULAR 2013-004,
ERIES OF 2013
FOR SOURCE OF FUND, STATE IF DPWH REGULAR BUDGET, PRIORITY DEVELOPMENT
ASSISTANCE FUND, DEPED/DA/DAR BUDGET, CALAMITY FUND, MVUC FUND, ETC.

2. ALL DIMENSION ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED.


2 ISOMETRIC VIEW OF BILLBOARD
-
SCALE NTS

1 DPWH STANDARD PROJECT BILLBOARD


-
SCALE NTS

1220

50x75 VERTICAL
COCO LUMBER
DISPLAY AREA
(TARPAULIN 2440 x 2440 x 12 1220
MARINE PLYWOOD)

50x75 HORIZONTAL 1220 50x75 HORIZONTAL 50x75 HORIZONTAL


COCO LUMBER
COCO LUMBER COCO LUMBER

1220

45° 50x75 VERTICAL


COCO LUMBER
50x75 VERTICAL 50x75 VERTICAL
COCO LUMBER COCO LUMBER

1000 50x50 WOODEN 1000 50x50 WOODEN 1000


STAKES STAKES

50x50 WOODEN
STAKES

GROUND LEVEL GROUND LEVEL GROUND LEVEL

EDGE OF ROAD
500 500 500

TRAFFIC DIRECTION

2440 2440

3 ORIENTATION 4 TYPICAL FRAME ELEVATION 5 FRONT ELEVATION (OPTION 1) 6 BACK ELEVATION


- - - -
SCALE NTS SCALE NTS SCALE NTS SCALE NTS

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES COMMISSION ON AUDIT SIGNBOARD ELOISA L. RICAFRANCA


C.Y. 2024 PROJECT
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR ENGINEERING AIDE
REGION IV-A CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION
QUEZON 4TH DISTRICT ENGINEERING OFFICE OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024 PREPARED: JENNIFER C. APOHIN EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO
GUMACA, QUEZON 5. GUMACA WEST ELEMENTARY SCHOOL, GUMACA, QUEZON
GUMACA, QUEZON ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
REGIDOR G. MAPANAO CHIEF, PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE: DATE:
TABLE OF CONTENTS Republic of the Phillipines
Department of
GENERAL Public Works and Highway
OFFICE OF THE BUILDING OFFICIAL
G1 COVER PAGE

G2 SUMMARY OF QUANTITIES

G3 PROJECT BILLBOARD

G4 COMMISSION ON AUDIT SIGNBOARD


District/City/Municipality

ARCHITECTURAL LAND USE & ZONING

A1 VICINITY MAP
KEY PLAN
TABLE OF CONTENT
PERSPECTIVE
A2 GENERAL NOTES
ELEVATION
SECTION
PLAN

LINE & GRADE

STRUCTURAL ARCHITECTURAL
S1 DET. SLAB REINFORCEMENT,
HALF ROOF SLAB HALF FLOOR SLAB
SECTION
PLAN
1 PERSPECTIVE FOUNDATION FRAMING PLAN
A-1 NTS: SECTION
DETAIL OF MANHOLE

PROJECT SITE STRUCTURAL


TO
PROJECT SITE MA
NILA

N
LOPEZ-HONDAGUA

QUEZON-ALABAT-PEREZ
PLUMBING

QUIRINO
HIGWAY
SANITARY
OLD ZIGZAG

ELECTRICAL
TO
BIC
OL

ELECTRICAL
TALABA-SUMMIT-PANAON
O
OG
PIT
TO

GUMACA-PITOGO-SAN
NARCISO

LOPEZ-CATANAUAN LOPEZ-BUENAVISTA LEGEND:

MAHARLIKA HIGHWAY

GUMACA-PITOGO ROAD

MECHANICAL
MECHANICAL

2 KEY PLAN 3 VICINITY MAP


A-1 NTS: A-1 NTS:

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES RECHELLE E. DELMO


VICINITY MAP
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT ENGINEERING AIDE
REGION IV-A DETAILED ENGINEERING DESIGN PLAN FOR KEY PLAN
QUEZON 4TH DISTRICT ENGINEERING OFFICE CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION
OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024
TABLE OF CONTENT PREPARED: JENNIFER C. APOHIN EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO
GUMACA, QUEZON 5. GUMACA WEST ELEMENTARY SCHOOL, GUMACA, QUEZON PERSPECTIVE ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
GUMACA, QUEZON REGIDOR G. MAPANAO CHIEF, PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE: DATE:
NOTE: 100% OF ROOF AREA SHALL DRAIN TO THE TANK
GENERAL NOTES: A
ROOF FOOTPRINT
=AxB
A 5. IT IS RECOMMENDED TO CONNECT THE FOLLOWING HOUSEHOLD
2. COLLECTED WATER VOLUME CAN COMPUTED USING THE FIXTURES TO THE RAINWATER TANK SUPPLY.
B B FORMULA BELOW. a. ALL OUTDOOR TAPS
I. DESIGN CRITERIA AND SPECIFICATIONS b. ALL OUTLETS
1. DPWH DESIGN GUIDELINES CRITERIA AND STANDARD VOLUME III - COLLECTED WATER (GAL.) = ROOF CATCHMENT AREA (SQ-FT) X c. WASHING MACHINE (COLD TAP)
WATER ENGINEERING PROJECTS, 2015 EDITION. ANNUAL AVE RAINFALL DEPTH (IN) X
2. GEORGIA RAINWATER HARVESTING GUIDELINES. 0.623 (CONVERSION FACTOR). 6. SIZE OF TANK WILL VARY DEPENDING ON THE VOLUME OF RAINWATER
TO BE COLLECTED, STRUCTURAL ANALYSIS SHALL BE CONDUCTED.
II. DESIGN CONDITIONS 3. ANNUAL AVERAGE RAINFALL SHALL BE BASED ON THE HIGHEST
1. ROOF CATCHMENT AREA SHALL BE EQUIVALENT TO THE OVERALL CLIMATOLOGICAL NORMAL RECORDED BY THE PHILIPPINES 7. ALL DIMENSIONS ARE IN METERS, UNLESS OTHERWISE SPECIFIED.
FOOTPRINT OF THE BUILDING THAT DETERMINES THE COLLECTION ATMOSPHERIC, GEOPHYSICAL AND ASTRONOMICAL SERVICES
AREA. ADMINISTRATION (PAGASA) III. MATERIALS

4. ALL PLUMBING WORKS SHALL BE UNDERTAKEN BY A LICENSED ALL MATERIALS SHALL CONFORM TO THE SPECIFICATIONS AND
PLUMBER WITH THE CONSENT OF THE MANUFACTURER AND IN REQUIREMENTS SPECIFIED IN THE LATEST DPWH STANDARD
*Catchment Area of Typical Roofs ACCORDANCE WITH ALL STANDARDS, CODES AND REGULATION. SPECIFICATION (BLUE BOOK) VOLUME II AND III.

ALL TYPE OF ROOFING ACCEPTABLE


GUTTER WITH SCREEN ON TOP
6.20

2" GAP AT DOWNSPOUT 0.60 5.00 0.60


RAIN HEAD, SLOPED SCREEN
DIVERTS DEBRIS

0.60
SECOND FINER SCREEN TO PREVENT
SLOPE INSECTS FROM GETTING INTO TANK

INLET LINE

AIR RELIEF VENT WITH INSECT SCREEN

OVERFLOE PIPE WITH LOUVERED


FIRST FLUSH DIVERTER (DOWN OUTLET FOR INSECT PREVENTION
PIPE-TYPE) (100MM)

ROOF

5.00
SLOW DRIP FLOW-CONTROL VALVE
0.50 0.50

1.25
SUPPLY PIPE

0.50

2.55
2.95
SLOPE

0.15
CLEAN-OUT PIPE

0.45

3.55
NGL 0.50

0.60
1.50

ON FILL

0.60 5.00 0.60

1 ELEVATION 2 SECTION 3 PLAN


AWS-2 SCALE 1:50 MTS AWS-2 SCALE 1:50 MTS
AWS-2 SCALE 1:50 MTS

NOTE:
ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE STATED.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES RECHELLE E. DELMO


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT
GENERAL NOTES
ENGINEERING AIDE
REGION IV-A DETAILED ENGINEERING DESIGN PLAN FOR ELEVATION
QUEZON 4TH DISTRICT ENGINEERING OFFICE CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION
OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024 SECTION PREPARED: JENNIFER C. APOHIN EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO
GUMACA, QUEZON 5. GUMACA WEST ELEMENTARY SCHOOL, GUMACA, QUEZON PLAN ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
GUMACA, QUEZON REGIDOR G. MAPANAO CHIEF, PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE: DATE:
2.55

L/5 0.50
#5 @ 0.1250 O.C. B.W. BENT UP EVERY
OTHER BAR @ L/5 FROM SUPPORT

0.15
0.50
#5 @ 0.1250 O.C. B.W. BENT

0.10

BARS @0.15 O.C.


UP EVERY OTHER BAR
@ L/5 FROM SUPPORT

#4 @ HORZ.

.
#3 @ 0.250 O.C. B.W. BENT
UP EVERY OTHER BAR 3

BARS @0.10 O.C.


@ L/5 FROM SUPPORT SWS-1

1.15
5 - #3 BARS B.W.
2.25

#4 @ HORZ.
1.90

.
0.15
#4 @ HORZ. BARS @0.15 O.C.

0.50
L/5 L/5
#5 @ VERT. BARS @0.10 O.C.
0.15

0.20 . 0.20
#5 @ 0.1250 O.C. B.W. BENT UP EVERY
OTHER BAR @ L/5 FROM SUPPORT

DETAILS SLAB REINFORCEMENT


1 HALF ROOF SLAB HALF FLOOR SLAB 3 SECTION PLAN
SWS-1 SCALE 1:30 MTS SWS-1 SCALE 1:30 MTS

#5 RADIAL BARS @0.35 O.C.


MEASURED FROM OUTSIDE
2.55
0.20 0.20
0.50
0.15 0.15
0.10

#4 @ HORZ. BARS @0.15 O.C.


#5 @ RADIAL BARS

0.05
@0.35 O.C. B.W.
#5 @ VERT. BARS @0.10 O.C.

0.10
4
SWS-1
0.15
2.54
2.95

2.15
1.75

#4 @ HORZ. BARS @0.15 O.C.

#5 @ VERT. BARS @0.10 O.C.


SECTION
1.70
2.10

#5 BARS @0.30 O.C. B.W.

5-#5 @ CIRCULAR BARS


#5 @ RADIAL BARS @0.35 O.C.
MEASURED FROM OUTSIDE

5 DETAIL OF MANHOLE
SWS-1 NTS:
0.20
0.25

5-#5 @ CIRCULAR BARS

0.20 0.20
0.20 0.20 0.20 0.20
2 FOUNDATION FRAMING PLAN
0.60 0.60
SWS-1 SCALE 1:30 MTS

4 SECTION
SWS-1 SCALE 1:30 MTS

NOTE:
ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE STATED.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES DET. SLAB REINFORCEMENT, RECHELLE E. DELMO


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT HALF ROOF SLAB HALF FLOOR SLAB ENGINEERING AIDE
REGION IV-A DETAILED ENGINEERING DESIGN PLAN FOR SECTION
QUEZON 4TH DISTRICT ENGINEERING OFFICE CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION
OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024 PLAN PREPARED: JENNIFER C. APOHIN EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO
GUMACA, QUEZON 5. GUMACA WEST ELEMENTARY SCHOOL, GUMACA, QUEZON FOUNDATION FRAMING PLAN ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
GUMACA, QUEZON SECTION REGIDOR G. MAPANAO CHIEF, PLANNING AND DESIGN SECTION
DETAIL OF MANHOLE ARCHITECT II DATE: DATE: DATE: DATE: