DPWH Rainwater Harvesting Guidelines
DPWH Rainwater Harvesting Guidelines
C.Y.2024 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION
OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024
1. SABANG ELEMENTARY SCHOOL, CALAUAG, QUEZON
CALAUAG, QUEZON
NOTE:
DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
50
210
20
50
610
THIS IS WHERE YOUR TAXES GO
60
50
60
NAME OF PROJECT :
50 50
30
NAME OF CONTRACTOR :
50
30
DATE STARTED :
50
30
30
CONTRACT COST :
50
610
30
IMPLEMENTING OFFICE :
50
30
SOURCES OF FUND :
50
20
20 20 30
Department of Public Works and Highways
20 20
Text 2920 or call (02) 165-02 for any concern on this project BLACK TEXT
www.dpwh.gov.ph
10
80
1220 1220
2440
NOTES :
1. LAYOUT OF PROJECT BILLBOARD IS BASED ON DO 21, SERIES OF 2017
AND DO 11, SERIES OF 2022.
FOR SOURCE OF FUND, STATE IF DPWH REGULAR BUDGET, PRIORITY DEVELOPMENT
ASSISTANCE FUND, DEPED/DA/DAR BUDGET, CALAMITY FUND, MVUC FUND, ETC.
50x75 VERTICAL
DISPLAY AREA DISPLAY AREA
1220 50x75 VERTICAL 1220 50x75 VERTICAL 1220
COCO LUMBER
COCO LUMBER (TARPAULIN 1220 x 2440 x 12 COCO LUMBER (TARPAULIN 1220 x 2440 x 5
MARINE PLYWOOD) MARINE PLYWOOD)
50x50 WOODEN
STAKES
EDGE OF ROAD
500 500 500
TRAFFIC DIRECTION
2440 2440
3 ORIENTATION 4 TYPICAL FRAME ELEVATION 5 FRONT ELEVATION (OPTION 1) 6 FRONT ELEVATION (OPTION 2)
- - - -
SCALE NTS SCALE NTS SCALE NTS SCALE NTS
DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES C.Y. 2023 PROJECT PROJECT BILLBOARD ELOISA L. RICAFRANCA
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR
CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION ENGINEERING AIDE
REGION IV-A
OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024
QUEZON 4TH DISTRICT ENGINEERING OFFICE 1. SABANG ELEMENTARY SCHOOL, CALAUAG, QUEZON PREPARED: JENNIFER C. APOHIN EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO
GUMACA, QUEZON CALAUAG, QUEZON
ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
REGIDOR G. MAPANAO CHIEF, PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE: DATE:
204 250 21 459 571 459 286 190
BLACK TEXT
114
37
30
47
31
47
30
48
21 21
32 32
81
38
1220
26
38
149
38
27
38
25
40
25
38
77
38
15
2440
73
202
38
69
69
69
69
92
WHITE BACKGROUND
1220
38
25
40
77
39
25
38
25
BLACK TEXT
41
263
80
1220 1220
2440
NOTES :
1. LAYOUT OF PROJECT BILLBOARD IS BASED ON COA CIRCULAR 2013-004,
ERIES OF 2013
FOR SOURCE OF FUND, STATE IF DPWH REGULAR BUDGET, PRIORITY DEVELOPMENT
ASSISTANCE FUND, DEPED/DA/DAR BUDGET, CALAMITY FUND, MVUC FUND, ETC.
1220
50x75 VERTICAL
COCO LUMBER
DISPLAY AREA
(TARPAULIN 2440 x 2440 x 12 1220
MARINE PLYWOOD)
1220
50x50 WOODEN
STAKES
EDGE OF ROAD
500 500 500
TRAFFIC DIRECTION
2440 2440
DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES C.Y. 2023 PROJECT COMMISSION ON AUDIT SIGNBOARD ELOISA L. RICAFRANCA
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR
CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION ENGINEERING AIDE
REGION IV-A
OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024
QUEZON 4TH DISTRICT ENGINEERING OFFICE 1. SABANG ELEMENTARY SCHOOL, CALAUAG, QUEZON PREPARED: JENNIFER C. APOHIN EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO
GUMACA, QUEZON CALAUAG, QUEZON
ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
REGIDOR G. MAPANAO CHIEF, PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE: DATE:
TABLE OF CONTENTS Republic of the Phillipines
Department of
GENERAL Public Works and Highway
OFFICE OF THE BUILDING OFFICIAL
G1 COVER PAGE
G2 SUMMARY OF QUANTITIES
G3 PROJECT BILLBOARD
A1 VICINITY MAP
KEY PLAN
TABLE OF CONTENT
PERSPECTIVE
A2 GENERAL NOTES
ELEVATION
SECTION
PLAN
STRUCTURAL ARCHITECTURAL
S1 DET. SLAB REINFORCEMENT,
HALF ROOF SLAB HALF FLOOR SLAB
SECTION
PLAN
1 PERSPECTIVE FOUNDATION FRAMING PLAN
A-1 NTS: SECTION
DETAIL OF MANHOLE
STRUCTURAL
PROJECT SITE
PLUMBING
N
LOPEZ-HONDAGUA
QUEZON-ALABAT-PEREZ
SANITARY
QUIRINO
HIGWAY
OLD ZIGZAG
ELECTRICAL
PROJECT SITE
ELECTRICAL
TO BICOL
TO MANILA
TALABA-SUMMIT-PANAON
LEGEND:
MAHARLIKA HIGHWAY
GUMACA-PITOGO-SAN
NARCISO
MECHANICAL
LOPEZ-CATANAUAN LOPEZ-BUENAVISTA
MECHANICAL
DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
4. ALL PLUMBING WORKS SHALL BE UNDERTAKEN BY A LICENSED ALL MATERIALS SHALL CONFORM TO THE SPECIFICATIONS AND
PLUMBER WITH THE CONSENT OF THE MANUFACTURER AND IN REQUIREMENTS SPECIFIED IN THE LATEST DPWH STANDARD
*Catchment Area of Typical Roofs ACCORDANCE WITH ALL STANDARDS, CODES AND REGULATION. SPECIFICATION (BLUE BOOK) VOLUME II AND III.
0.60
SECOND FINER SCREEN TO PREVENT
SLOPE INSECTS FROM GETTING INTO TANK
INLET LINE
ROOF
5.00
SLOW DRIP FLOW-CONTROL VALVE
0.50 0.50
1.25
SUPPLY PIPE
0.50
2.55
2.95
SLOPE
0.15
CLEAN-OUT PIPE
0.45
3.55
NGL 0.50
0.60
1.50
ON FILL
NOTE:
ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE STATED.
DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
L/5 0.50
#5 @ 0.1250 O.C. B.W. BENT UP EVERY
OTHER BAR @ L/5 FROM SUPPORT
0.15
0.50
#5 @ 0.1250 O.C. B.W. BENT
0.10
#4 @ HORZ.
.
#3 @ 0.250 O.C. B.W. BENT
UP EVERY OTHER BAR 3
1.15
5 - #3 BARS B.W.
2.25
#4 @ HORZ.
1.90
.
0.15
#4 @ HORZ. BARS @0.15 O.C.
0.50
L/5 L/5
#5 @ VERT. BARS @0.10 O.C.
0.15
0.20 . 0.20
#5 @ 0.1250 O.C. B.W. BENT UP EVERY
OTHER BAR @ L/5 FROM SUPPORT
0.05
@0.35 O.C. B.W.
#5 @ VERT. BARS @0.10 O.C.
0.10
4
SWS-1
0.15
2.54
2.95
2.15
1.75
5 DETAIL OF MANHOLE
SWS-1 NTS:
0.20
0.25
0.20 0.20
0.20 0.20 0.20 0.20
2 FOUNDATION FRAMING PLAN
0.60 0.60
SWS-1 SCALE 1:30 MTS
4 SECTION
SWS-1 SCALE 1:30 MTS
NOTE:
ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE STATED.
DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
C.Y.2024 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION
OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024
2. CONCEPCION ELEMENTARY SCHOOL, PLARIDEL, QUEZON
PLARIDEL, QUEZON
NOTE:
DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
50
210
20
50
610
THIS IS WHERE YOUR TAXES GO
60
50
60
NAME OF PROJECT :
50 50
30
NAME OF CONTRACTOR :
50
30
DATE STARTED :
50
30
30
CONTRACT COST :
50
610
30
IMPLEMENTING OFFICE :
50
30
SOURCES OF FUND :
50
20
20 20 30
Department of Public Works and Highways
20 20
Text 2920 or call (02) 165-02 for any concern on this project BLACK TEXT
www.dpwh.gov.ph
10
80
1220 1220
2440
NOTES :
1. LAYOUT OF PROJECT BILLBOARD IS BASED ON DO 21, SERIES OF 2017
AND DO 11, SERIES OF 2022.
FOR SOURCE OF FUND, STATE IF DPWH REGULAR BUDGET, PRIORITY DEVELOPMENT
ASSISTANCE FUND, DEPED/DA/DAR BUDGET, CALAMITY FUND, MVUC FUND, ETC.
50x75 VERTICAL
DISPLAY AREA DISPLAY AREA
1220 50x75 VERTICAL 1220 50x75 VERTICAL 1220
COCO LUMBER
COCO LUMBER (TARPAULIN 1220 x 2440 x 12 COCO LUMBER (TARPAULIN 1220 x 2440 x 5
MARINE PLYWOOD) MARINE PLYWOOD)
50x50 WOODEN
STAKES
EDGE OF ROAD
500 500 500
TRAFFIC DIRECTION
2440 2440
3 ORIENTATION 4 TYPICAL FRAME ELEVATION 5 FRONT ELEVATION (OPTION 1) 6 FRONT ELEVATION (OPTION 2)
- - - -
SCALE NTS SCALE NTS SCALE NTS SCALE NTS
DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES C.Y. 2023 PROJECT PROJECT BILLBOARD ELOISA L. RICAFRANCA
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR
CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION ENGINEERING AIDE
REGION IV-A
OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024
QUEZON 4TH DISTRICT ENGINEERING OFFICE 2. CONCEPCION ELEMENTARY SCHOOL, PLARIDEL, QUEZON PREPARED: JENNIFER C. APOHIN EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO
GUMACA, QUEZON PLARIDEL, QUEZON
ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
REGIDOR G. MAPANAO CHIEF, PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE: DATE:
204 250 21 459 571 459 286 190
BLACK TEXT
114
37
30
47
31
47
30
48
21 21
32 32
81
38
1220
26
38
149
38
27
38
25
40
25
38
77
38
15
2440
73
202
38
69
69
69
69
92
WHITE BACKGROUND
1220
38
25
40
77
39
25
38
25
BLACK TEXT
41
263
80
1220 1220
2440
NOTES :
1. LAYOUT OF PROJECT BILLBOARD IS BASED ON COA CIRCULAR 2013-004,
ERIES OF 2013
FOR SOURCE OF FUND, STATE IF DPWH REGULAR BUDGET, PRIORITY DEVELOPMENT
ASSISTANCE FUND, DEPED/DA/DAR BUDGET, CALAMITY FUND, MVUC FUND, ETC.
1220
50x75 VERTICAL
COCO LUMBER
DISPLAY AREA
(TARPAULIN 2440 x 2440 x 12 1220
MARINE PLYWOOD)
1220
50x50 WOODEN
STAKES
EDGE OF ROAD
500 500 500
TRAFFIC DIRECTION
2440 2440
DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES C.Y. 2023 PROJECT COMMISSION ON AUDIT SIGNBOARD ELOISA L. RICAFRANCA
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR
CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION ENGINEERING AIDE
REGION IV-A
OF RAIN WATER COLLECTORS IN PUBLIC FACILITIES UNDER GAA 2024
QUEZON 4TH DISTRICT ENGINEERING OFFICE 2. CONCEPCION ELEMENTARY SCHOOL, PLARIDEL, QUEZON PREPARED: JENNIFER C. APOHIN EPHRAIM P. ANGARA ROMEL S. PUCHERO RODEL O. FLORIDO
GUMACA, QUEZON PLARIDEL, QUEZON
ENGINEER II ENGINEER III ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
REGIDOR G. MAPANAO CHIEF, PLANNING AND DESIGN SECTION
ARCHITECT II DATE: DATE: DATE: DATE:
TABLE OF CONTENTS Republic of the Phillipines
Department of
GENERAL Public Works and Highway
OFFICE OF THE BUILDING OFFICIAL
G1 COVER PAGE
G2 SUMMARY OF QUANTITIES
G3 PROJECT BILLBOARD
A1 VICINITY MAP
KEY PLAN
TABLE OF CONTENT
PERSPECTIVE
A2 GENERAL NOTES
ELEVATION
SECTION
PLAN
STRUCTURAL ARCHITECTURAL
S1 DET. SLAB REINFORCEMENT,
HALF ROOF SLAB HALF FLOOR SLAB
SECTION
PLAN
1 PERSPECTIVE FOUNDATION FRAMING PLAN
A-1 NTS: SECTION
DETAIL OF MANHOLE
STRUCTURAL
PROJECT SITE
PROJECT SITE
TO PLUMBING
N MA
NI
LA
LOPEZ-HONDAGUA
QUEZON-ALABAT-PEREZ
SANITARY
QUIRINO
HIGWAY
OLD ZIGZAG
ELECTRICAL
TO BICOL ELECTRICAL
TALABA-SUMMIT-PANAON
LEGEND:
MAHARLIKA HIGHWAY
GUMACA-PITOGO-SAN
NARCISO
MECHANICAL
LOPEZ-CATANAUAN LOPEZ-BUENAVISTA
MECHANICAL
DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
4. ALL PLUMBING WORKS SHALL BE UNDERTAKEN BY A LICENSED ALL MATERIALS SHALL CONFORM TO THE SPECIFICATIONS AND
PLUMBER WITH THE CONSENT OF THE MANUFACTURER AND IN REQUIREMENTS SPECIFIED IN THE LATEST DPWH STANDARD
*Catchment Area of Typical Roofs ACCORDANCE WITH ALL STANDARDS, CODES AND REGULATION. SPECIFICATION (BLUE BOOK) VOLUME II AND III.
0.60
SECOND FINER SCREEN TO PREVENT
SLOPE INSECTS FROM GETTING INTO TANK
INLET LINE
ROOF
5.00
SLOW DRIP FLOW-CONTROL VALVE
0.50 0.50
1.25
SUPPLY PIPE
0.50
2.55
2.95
SLOPE
0.15
CLEAN-OUT PIPE
0.45
3.55
NGL 0.50
0.60
1.50
ON FILL
NOTE:
ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE STATED.
DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
L/5 0.50
#5 @ 0.1250 O.C. B.W. BENT UP EVERY
OTHER BAR @ L/5 FROM SUPPORT
0.15
0.50
#5 @ 0.1250 O.C. B.W. BENT
0.10
#4 @ HORZ.
.
#3 @ 0.250 O.C. B.W. BENT
UP EVERY OTHER BAR 3
1.15
5 - #3 BARS B.W.
2.25
#4 @ HORZ.
1.90
.
0.15
#4 @ HORZ. BARS @0.15 O.C.
0.50
L/5 L/5
#5 @ VERT. BARS @0.10 O.C.
0.15
0.20 . 0.20
#5 @ 0.1250 O.C. B.W. BENT UP EVERY
OTHER BAR @ L/5 FROM SUPPORT
0.05
@0.35 O.C. B.W.
#5 @ VERT. BARS @0.10 O.C.
0.10
4
SWS-1
0.15
2.54
2.95
2.15
1.75
5 DETAIL OF MANHOLE
SWS-1 NTS:
0.20
0.25
0.20 0.20
0.20 0.20 0.20 0.20
2 FOUNDATION FRAMING PLAN
0.60 0.60
SWS-1 SCALE 1:30 MTS
4 SECTION
SWS-1 SCALE 1:30 MTS
NOTE:
ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE STATED.
DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
NOTE:
DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
50
210
20
50
610
THIS IS WHERE YOUR TAXES GO
60
50
60
NAME OF PROJECT :
50 50
30
NAME OF CONTRACTOR :
50
30
DATE STARTED :
50
30
30
CONTRACT COST :
50
610
30
IMPLEMENTING OFFICE :
50
30
SOURCES OF FUND :
50
20
20 20 30
Department of Public Works and Highways
20 20
Text 2920 or call (02) 165-02 for any concern on this project BLACK TEXT
www.dpwh.gov.ph
10
80
1220 1220
2440
NOTES :
1. LAYOUT OF PROJECT BILLBOARD IS BASED ON DO 21, SERIES OF 2017
AND DO 11, SERIES OF 2022.
FOR SOURCE OF FUND, STATE IF DPWH REGULAR BUDGET, PRIORITY DEVELOPMENT
ASSISTANCE FUND, DEPED/DA/DAR BUDGET, CALAMITY FUND, MVUC FUND, ETC.
50x75 VERTICAL
DISPLAY AREA DISPLAY AREA
1220 50x75 VERTICAL 1220 50x75 VERTICAL 1220
COCO LUMBER
COCO LUMBER (TARPAULIN 1220 x 2440 x 12 COCO LUMBER (TARPAULIN 1220 x 2440 x 5
MARINE PLYWOOD) MARINE PLYWOOD)
50x50 WOODEN
STAKES
EDGE OF ROAD
500 500 500
TRAFFIC DIRECTION
2440 2440
3 ORIENTATION 4 TYPICAL FRAME ELEVATION 5 FRONT ELEVATION (OPTION 1) 6 FRONT ELEVATION (OPTION 2)
- - - -
SCALE NTS SCALE NTS SCALE NTS SCALE NTS
DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
BLACK TEXT
114
37
30
47
31
47
30
48
21 21
32 32
81
38
1220
26
38
149
38
27
38
25
40
25
38
77
38
15
2440
73
202
38
69
69
69
69
92
WHITE BACKGROUND
1220
38
25
40
77
39
25
38
25
BLACK TEXT
41
263
80
1220 1220
2440
NOTES :
1. LAYOUT OF PROJECT BILLBOARD IS BASED ON COA CIRCULAR 2013-004,
ERIES OF 2013
FOR SOURCE OF FUND, STATE IF DPWH REGULAR BUDGET, PRIORITY DEVELOPMENT
ASSISTANCE FUND, DEPED/DA/DAR BUDGET, CALAMITY FUND, MVUC FUND, ETC.
1220
50x75 VERTICAL
COCO LUMBER
DISPLAY AREA
(TARPAULIN 2440 x 2440 x 12 1220
MARINE PLYWOOD)
1220
50x50 WOODEN
STAKES
EDGE OF ROAD
500 500 500
TRAFFIC DIRECTION
2440 2440
DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
G2 SUMMARY OF QUANTITIES
G3 PROJECT BILLBOARD
A1 VICINITY MAP
KEY PLAN
TABLE OF CONTENT
PERSPECTIVE
A2 GENERAL NOTES
ELEVATION
SECTION
PLAN
STRUCTURAL ARCHITECTURAL
S1 DET. SLAB REINFORCEMENT,
HALF ROOF SLAB HALF FLOOR SLAB
SECTION
PLAN
1 PERSPECTIVE FOUNDATION FRAMING PLAN
A-1 NTS: SECTION
DETAIL OF MANHOLE
TO BICOL
STRUCTURAL
PROJECT SITE
PLUMBING
N
LOPEZ-HONDAGUA
QUEZON-ALABAT-PEREZ
SANITARY
QUIRINO
HIGWAY
OLD ZIGZAG
ELECTRICAL
TO MANILA
ELECTRICAL
TO
PO
TALABA-SUMMIT-PANAON
B
OF
GU
LEGEND:
IN
AY
AN
MAHARLIKA HIGHWAY
GA
GUMACA-PITOGO-SAN
N
NARCISO CALAUAG - GUINAYANGAN ROAD
MECHANICAL
LOPEZ-CATANAUAN LOPEZ-BUENAVISTA
MECHANICAL
DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
4. ALL PLUMBING WORKS SHALL BE UNDERTAKEN BY A LICENSED ALL MATERIALS SHALL CONFORM TO THE SPECIFICATIONS AND
PLUMBER WITH THE CONSENT OF THE MANUFACTURER AND IN REQUIREMENTS SPECIFIED IN THE LATEST DPWH STANDARD
*Catchment Area of Typical Roofs ACCORDANCE WITH ALL STANDARDS, CODES AND REGULATION. SPECIFICATION (BLUE BOOK) VOLUME II AND III.
0.60
SECOND FINER SCREEN TO PREVENT
SLOPE INSECTS FROM GETTING INTO TANK
INLET LINE
ROOF
5.00
SLOW DRIP FLOW-CONTROL VALVE
0.50 0.50
1.25
SUPPLY PIPE
0.50
2.55
2.95
SLOPE
0.15
CLEAN-OUT PIPE
0.45
3.55
NGL 0.50
0.60
1.50
ON FILL
NOTE:
ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE STATED.
DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
L/5 0.50
#5 @ 0.1250 O.C. B.W. BENT UP EVERY
OTHER BAR @ L/5 FROM SUPPORT
0.15
0.50
#5 @ 0.1250 O.C. B.W. BENT
0.10
#4 @ HORZ.
.
#3 @ 0.250 O.C. B.W. BENT
UP EVERY OTHER BAR 3
1.15
5 - #3 BARS B.W.
2.25
#4 @ HORZ.
1.90
.
0.15
#4 @ HORZ. BARS @0.15 O.C.
0.50
L/5 L/5
#5 @ VERT. BARS @0.10 O.C.
0.15
0.20 . 0.20
#5 @ 0.1250 O.C. B.W. BENT UP EVERY
OTHER BAR @ L/5 FROM SUPPORT
0.05
@0.35 O.C. B.W.
#5 @ VERT. BARS @0.10 O.C.
0.10
4
SWS-1
0.15
2.54
2.95
2.15
1.75
5 DETAIL OF MANHOLE
SWS-1 NTS:
0.20
0.25
0.20 0.20
0.20 0.20 0.20 0.20
2 FOUNDATION FRAMING PLAN
0.60 0.60
SWS-1 SCALE 1:30 MTS
4 SECTION
SWS-1 SCALE 1:30 MTS
NOTE:
ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE STATED.
DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
NOTE:
DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
50
210
20
50
610
THIS IS WHERE YOUR TAXES GO
60
50
60
NAME OF PROJECT :
50 50
30
NAME OF CONTRACTOR :
50
30
DATE STARTED :
50
30
30
CONTRACT COST :
50
610
30
IMPLEMENTING OFFICE :
50
30
SOURCES OF FUND :
50
20
20 20 30
Department of Public Works and Highways
20 20
Text 2920 or call (02) 165-02 for any concern on this project BLACK TEXT
www.dpwh.gov.ph
10
80
1220 1220
2440
NOTES :
1. LAYOUT OF PROJECT BILLBOARD IS BASED ON DO 21, SERIES OF 2017
AND DO 11, SERIES OF 2022.
FOR SOURCE OF FUND, STATE IF DPWH REGULAR BUDGET, PRIORITY DEVELOPMENT
ASSISTANCE FUND, DEPED/DA/DAR BUDGET, CALAMITY FUND, MVUC FUND, ETC.
50x75 VERTICAL
DISPLAY AREA DISPLAY AREA
1220 50x75 VERTICAL 1220 50x75 VERTICAL 1220
COCO LUMBER
COCO LUMBER (TARPAULIN 1220 x 2440 x 12 COCO LUMBER (TARPAULIN 1220 x 2440 x 5
MARINE PLYWOOD) MARINE PLYWOOD)
50x50 WOODEN
STAKES
EDGE OF ROAD
500 500 500
TRAFFIC DIRECTION
2440 2440
3 ORIENTATION 4 TYPICAL FRAME ELEVATION 5 FRONT ELEVATION (OPTION 1) 6 FRONT ELEVATION (OPTION 2)
- - - -
SCALE NTS SCALE NTS SCALE NTS SCALE NTS
DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
BLACK TEXT
114
37
30
47
31
47
30
48
21 21
32 32
81
38
1220
26
38
149
38
27
38
25
40
25
38
77
38
15
2440
73
202
38
69
69
69
69
92
WHITE BACKGROUND
1220
38
25
40
77
39
25
38
25
BLACK TEXT
41
263
80
1220 1220
2440
NOTES :
1. LAYOUT OF PROJECT BILLBOARD IS BASED ON COA CIRCULAR 2013-004,
ERIES OF 2013
FOR SOURCE OF FUND, STATE IF DPWH REGULAR BUDGET, PRIORITY DEVELOPMENT
ASSISTANCE FUND, DEPED/DA/DAR BUDGET, CALAMITY FUND, MVUC FUND, ETC.
1220
50x75 VERTICAL
COCO LUMBER
DISPLAY AREA
(TARPAULIN 2440 x 2440 x 12 1220
MARINE PLYWOOD)
1220
50x50 WOODEN
STAKES
EDGE OF ROAD
500 500 500
TRAFFIC DIRECTION
2440 2440
DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
G2 SUMMARY OF QUANTITIES
G3 PROJECT BILLBOARD
A1 VICINITY MAP
KEY PLAN
TABLE OF CONTENT
PERSPECTIVE
A2 GENERAL NOTES
ELEVATION
SECTION
PLAN
STRUCTURAL ARCHITECTURAL
S1 DET. SLAB REINFORCEMENT,
HALF ROOF SLAB HALF FLOOR SLAB
SECTION
PLAN
1 PERSPECTIVE FOUNDATION FRAMING PLAN
A-1 NTS: SECTION
DETAIL OF MANHOLE
PROJECT SITE
N
LOPEZ-HONDAGUA
QUEZON-ALABAT-PEREZ
PLUMBING
QUIRINO
HIGWAY
SANITARY
OLD ZIGZAG
TO B
ICO
L
ELECTRICAL
ELECTRICAL
TALABA-SUMMIT-PANAON
A
NIL
GUMACA-PITOGO-SAN
MA
NARCISO
HONDAGUA-ROMA ROAD
MECHANICAL
MECHANICAL
DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
4. ALL PLUMBING WORKS SHALL BE UNDERTAKEN BY A LICENSED ALL MATERIALS SHALL CONFORM TO THE SPECIFICATIONS AND
PLUMBER WITH THE CONSENT OF THE MANUFACTURER AND IN REQUIREMENTS SPECIFIED IN THE LATEST DPWH STANDARD
*Catchment Area of Typical Roofs ACCORDANCE WITH ALL STANDARDS, CODES AND REGULATION. SPECIFICATION (BLUE BOOK) VOLUME II AND III.
0.60
SECOND FINER SCREEN TO PREVENT
SLOPE INSECTS FROM GETTING INTO TANK
INLET LINE
ROOF
5.00
SLOW DRIP FLOW-CONTROL VALVE
0.50 0.50
1.25
SUPPLY PIPE
0.50
2.55
2.95
SLOPE
0.15
CLEAN-OUT PIPE
0.45
3.55
NGL 0.50
0.60
1.50
ON FILL
NOTE:
ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE STATED.
DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
L/5 0.50
#5 @ 0.1250 O.C. B.W. BENT UP EVERY
OTHER BAR @ L/5 FROM SUPPORT
0.15
0.50
#5 @ 0.1250 O.C. B.W. BENT
0.10
#4 @ HORZ.
.
#3 @ 0.250 O.C. B.W. BENT
UP EVERY OTHER BAR 3
1.15
5 - #3 BARS B.W.
2.25
#4 @ HORZ.
1.90
.
0.15
#4 @ HORZ. BARS @0.15 O.C.
0.50
L/5 L/5
#5 @ VERT. BARS @0.10 O.C.
0.15
0.20 . 0.20
#5 @ 0.1250 O.C. B.W. BENT UP EVERY
OTHER BAR @ L/5 FROM SUPPORT
0.05
@0.35 O.C. B.W.
#5 @ VERT. BARS @0.10 O.C.
0.10
4
SWS-1
0.15
2.54
2.95
2.15
1.75
5 DETAIL OF MANHOLE
SWS-1 NTS:
0.20
0.25
0.20 0.20
0.20 0.20 0.20 0.20
2 FOUNDATION FRAMING PLAN
0.60 0.60
SWS-1 SCALE 1:30 MTS
4 SECTION
SWS-1 SCALE 1:30 MTS
NOTE:
ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE STATED.
DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
NOTE:
DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
50
210
20
50
610
THIS IS WHERE YOUR TAXES GO
60
50
60
NAME OF PROJECT :
50 50
30
NAME OF CONTRACTOR :
50
30
DATE STARTED :
50
30
30
CONTRACT COST :
50
610
30
IMPLEMENTING OFFICE :
50
30
SOURCES OF FUND :
50
20
20 20 30
Department of Public Works and Highways
20 20
Text 2920 or call (02) 165-02 for any concern on this project BLACK TEXT
www.dpwh.gov.ph
10
80
1220 1220
2440
NOTES :
1. LAYOUT OF PROJECT BILLBOARD IS BASED ON DO 21, SERIES OF 2017
AND DO 11, SERIES OF 2022.
FOR SOURCE OF FUND, STATE IF DPWH REGULAR BUDGET, PRIORITY DEVELOPMENT
ASSISTANCE FUND, DEPED/DA/DAR BUDGET, CALAMITY FUND, MVUC FUND, ETC.
50x75 VERTICAL
DISPLAY AREA DISPLAY AREA
1220 50x75 VERTICAL 1220 50x75 VERTICAL 1220
COCO LUMBER
COCO LUMBER (TARPAULIN 1220 x 2440 x 12 COCO LUMBER (TARPAULIN 1220 x 2440 x 5
MARINE PLYWOOD) MARINE PLYWOOD)
50x50 WOODEN
STAKES
EDGE OF ROAD
500 500 500
TRAFFIC DIRECTION
2440 2440
3 ORIENTATION 4 TYPICAL FRAME ELEVATION 5 FRONT ELEVATION (OPTION 1) 6 FRONT ELEVATION (OPTION 2)
- - - -
SCALE NTS SCALE NTS SCALE NTS SCALE NTS
DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
BLACK TEXT
114
37
30
47
31
47
30
48
21 21
32 32
81
38
1220
26
38
149
38
27
38
25
40
25
38
77
38
15
2440
73
202
38
69
69
69
69
92
WHITE BACKGROUND
1220
38
25
40
77
39
25
38
25
BLACK TEXT
41
263
80
1220 1220
2440
NOTES :
1. LAYOUT OF PROJECT BILLBOARD IS BASED ON COA CIRCULAR 2013-004,
ERIES OF 2013
FOR SOURCE OF FUND, STATE IF DPWH REGULAR BUDGET, PRIORITY DEVELOPMENT
ASSISTANCE FUND, DEPED/DA/DAR BUDGET, CALAMITY FUND, MVUC FUND, ETC.
1220
50x75 VERTICAL
COCO LUMBER
DISPLAY AREA
(TARPAULIN 2440 x 2440 x 12 1220
MARINE PLYWOOD)
1220
50x50 WOODEN
STAKES
EDGE OF ROAD
500 500 500
TRAFFIC DIRECTION
2440 2440
DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
G2 SUMMARY OF QUANTITIES
G3 PROJECT BILLBOARD
A1 VICINITY MAP
KEY PLAN
TABLE OF CONTENT
PERSPECTIVE
A2 GENERAL NOTES
ELEVATION
SECTION
PLAN
STRUCTURAL ARCHITECTURAL
S1 DET. SLAB REINFORCEMENT,
HALF ROOF SLAB HALF FLOOR SLAB
SECTION
PLAN
1 PERSPECTIVE FOUNDATION FRAMING PLAN
A-1 NTS: SECTION
DETAIL OF MANHOLE
N
LOPEZ-HONDAGUA
QUEZON-ALABAT-PEREZ
PLUMBING
QUIRINO
HIGWAY
SANITARY
OLD ZIGZAG
ELECTRICAL
TO
BIC
OL
ELECTRICAL
TALABA-SUMMIT-PANAON
O
OG
PIT
TO
GUMACA-PITOGO-SAN
NARCISO
MAHARLIKA HIGHWAY
GUMACA-PITOGO ROAD
MECHANICAL
MECHANICAL
DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
4. ALL PLUMBING WORKS SHALL BE UNDERTAKEN BY A LICENSED ALL MATERIALS SHALL CONFORM TO THE SPECIFICATIONS AND
PLUMBER WITH THE CONSENT OF THE MANUFACTURER AND IN REQUIREMENTS SPECIFIED IN THE LATEST DPWH STANDARD
*Catchment Area of Typical Roofs ACCORDANCE WITH ALL STANDARDS, CODES AND REGULATION. SPECIFICATION (BLUE BOOK) VOLUME II AND III.
0.60
SECOND FINER SCREEN TO PREVENT
SLOPE INSECTS FROM GETTING INTO TANK
INLET LINE
ROOF
5.00
SLOW DRIP FLOW-CONTROL VALVE
0.50 0.50
1.25
SUPPLY PIPE
0.50
2.55
2.95
SLOPE
0.15
CLEAN-OUT PIPE
0.45
3.55
NGL 0.50
0.60
1.50
ON FILL
NOTE:
ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE STATED.
DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
L/5 0.50
#5 @ 0.1250 O.C. B.W. BENT UP EVERY
OTHER BAR @ L/5 FROM SUPPORT
0.15
0.50
#5 @ 0.1250 O.C. B.W. BENT
0.10
#4 @ HORZ.
.
#3 @ 0.250 O.C. B.W. BENT
UP EVERY OTHER BAR 3
1.15
5 - #3 BARS B.W.
2.25
#4 @ HORZ.
1.90
.
0.15
#4 @ HORZ. BARS @0.15 O.C.
0.50
L/5 L/5
#5 @ VERT. BARS @0.10 O.C.
0.15
0.20 . 0.20
#5 @ 0.1250 O.C. B.W. BENT UP EVERY
OTHER BAR @ L/5 FROM SUPPORT
0.05
@0.35 O.C. B.W.
#5 @ VERT. BARS @0.10 O.C.
0.10
4
SWS-1
0.15
2.54
2.95
2.15
1.75
5 DETAIL OF MANHOLE
SWS-1 NTS:
0.20
0.25
0.20 0.20
0.20 0.20 0.20 0.20
2 FOUNDATION FRAMING PLAN
0.60 0.60
SWS-1 SCALE 1:30 MTS
4 SECTION
SWS-1 SCALE 1:30 MTS
NOTE:
ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE STATED.
DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.