Nevada Performance Guidelines Final 8-31-09
Nevada Performance Guidelines Final 8-31-09
Performance
Guidelines
Aug 31, 2009
Residential Construction Performance Guidelines Manual as accepted
by the Nevada State Contractors Board on October 1, 2002.
Modifications were accepted by the Nevada State Contractors Board on
August 31, 2009.
8-31-09 1
Voluntary Residential Construction Performance Guidelines
The Nevada State Contractors Board (NSCB) suggests contractors and homeowners
review the following Voluntary Residential Construction Guidelines concerning issues that
may arise over the quality, appearance, suitability or performance of residential
construction. These guidelines may provide helpful information and guidance in the
avoidance of issues between contractors and homeowners; however, the guidelines are not
to be viewed as regulations, procedures, or standards adopted by the NSCB. The guidelines
are intended for use as a reference guide only and should not be considered to create, alter,
modify, eliminate or change in any way, the contractual rights and duties of the contractor
or homeowner. Further, they are not intended to create, alter, modify, eliminate or change
any warranties, periods of warranty, or remedies that may pertain to the contractual
relationships between the contractor and homeowner.
The guidelines are general in nature, and are not to be relied upon as legal
authority. The guidelines are not intended to override any applicable building code, nor do
the guidelines require that a contractor surpass any applicable code. Use of these
guidelines will not alleviate the application of, or compliance with any applicable building
codes, contractual language, plans and specifications, scope of work, or any applicable
guidelines that may be adopted by any regulatory agency. Contractors and homeowners
are advised to consult their contracts, plans and specifications, scope of work and any
applicable building codes initially to resolve any issues that may arise over construction. If
after consulting these sources, the contractor and homeowner are unable to resolve a
construction issue, the NSCB suggests they consult these guidelines and attempt to resolve
the issue through application of the particular section, which may set forth the standard of
care and skill ordinarily used in the residential construction industry. Where plans and
specifications are included in the contract documents that exceed the voluntary
performance guidelines contained in this booklet, those plans and specifications supersede
the voluntary guidelines outlined herein.
The guidelines are set up in an easy, simple to use format. Each section deals with
specific, commonly encountered residential construction issues and suggests ways of
handling a particular ISSUE. Each guideline states a “Possible ISSUE”, “Performance
Guideline”, “Homeowner Responsibility”, “Contractor Responsibility”, and finally
“Comments”. These suggestions for performance and resolution may greatly assist
homeowners and contractors in avoiding costly litigation. If a particular issue is not found
within the guidelines, it does not mean it should not be addressed. Contractors and
homeowners are encouraged to work together in resolving any residential construction
issues, and use these guidelines where applicable. In the event resolution is not possible,
contractors and homeowners may always seek independent legal advice from qualified
counsel.
8-31-09 2
TABLE OF CONTENTS
INTRODUCTION .............................................................................................................. 5
PERFORMANCE GUIDELINES.................................................................................... 11
Carpeting ......................................................................................................................... 13
Drywall ............................................................................................................................ 17
Electrical.......................................................................................................................... 19
Exterior Ironwork............................................................................................................ 22
Insulation:........................................................................................................................ 25
Stucco............................................................................................................................... 27
8-31-09 3
Wood Shake Siding.......................................................................................................... 30
Foundations ..................................................................................................................... 34
Interior Countertops........................................................................................................ 47
Interior Stairs.................................................................................................................. 51
Plumbing.......................................................................................................................... 54
Skylights .......................................................................................................................... 59
8-31-09 4
INTRODUCTION
The criteria set forth in this manual are only minimum performance guidelines for quality,
workmanship and product performance. All efforts should be made to solve any problems
that may arise in the course of a typical residential construction project. This manual is in
no way intended to take the place of, or substitute for, any warranty offered by an involved
party. It is separate and stands alone from any manufacturers’ warranties that apply to
any materials and products used in the project. It is simply a guide to assist in any issues
that may occur in the life of a home. Issues selected for the manual are those most
frequently referenced by the homeowner and the contractor.
The scope of responsibilities is specific to each of the parties involved and is a clear
agreement between those parties pertaining to quality, workmanship and product
performance.
The construction process requires all work to be done in compliance with locally approved
and applicable building and other related codes that cover construction. If a conflict does
arise between the performance guideline manual and any locally approved codes, the code
requirements may take precedence over the guidelines. In addition, the application of these
standards with regard to new residential construction and any residential remodeling
projects is required.
8-31-09 5
Definitions of Terms Used:
After Market: A product or service that is purchased by the homeowner and either
installed by the homeowner, or a contractor hired by the homeowner, in or around the home
after the original contractor has completed his work. For instance, examples of after
market projects include: a patio, deck, backyard lanai, swimming pool, landscaping and
window tinting.
Color Variation: The color of the installed material may not exactly match the samples
used in the selection process. This is due to normal dye lot variation that occurs during the
manufacturing process.
Contractor: The company named in the contract to provide the service or product to the
original contractee. The contractor is responsible for the work assigned in the contract,
regardless of who actually performed the work needed. The exception would be in the case
where the homeowner contracted a project to a party outside of the original contract, which
then transfers the responsibility to that party and their warranty.
Defect: A failure to meet the construction performance guidelines, which include: quality,
workmanship and product performance as set forth in this agreement.
Home: The actual dwelling: single family and multi-family residence, condominium, town
home or pre-manufactured Uniform Building Code (UBC) home.
Homeowner: The original buyer of the product or service in the contract. The
responsibility of the homeowner is to review the contract and verify that it has accurately
represented his/her expectations for the finished product. After the homeowner closes
escrow, the homeowner becomes responsible for the routine maintenance and general
upkeep. As noted in these guidelines, the contractor is not responsible for certain repairs
that fall within the homeowner’s maintenance responsibilities. For instance, if the
homeowner selects others to provide certain services that are outside of the original
contractor’s control then the responsibility may fall on the outside party to determine the
cause and remedy the problem. In addition, if the homeowner chooses to install products in
or around the home and a problem occurs after proper installation, the homeowner will
have to work with the manufacturer to resolve the issue.
Manufactured Appliances: Refers to the equipment in and around the home that have
applicable manufacturer’s warranties and/or manufacturer’s specifications for installation,
maintenance, use and performance. Manufacturer related problems attributed to the
materials used, the manufacturing process or failure to perform as defined by the
manufacturer’s warranty is the responsibility of the manufacturer.
8-31-09 6
was installed per manufacturer’s specifications, so if a problem does occur, the homeowner
may have to deal directly with the manufacturer to resolve the issue. Unless otherwise
specified, the contractor’s responsibility may end once they provide the homeowner with the
appropriate information to contact the manufacturer.
Warranty: A warranty or assurance to the homeowner, from the builder or contractor, that
describes the guidelines to which the product or service will be performed, how long the
guidelines will apply, what to do if the warranty is not met and what the homeowner’s
responsibility is in the form of maintenance to keep the warranty intact. In some cases, if
alterations/adjustments are made or maintenance is not kept up to date by the homeowner,
these actions may void the warranty.
Warranty Term: The period in which a warranted defect must occur in order to be covered,
and is also that period which begins on the effective date of the warranty. For new
residential construction that period may be referred to as “During the warranty period”, “At
the time of walk-through”, “According to the manufacturer’s specifications or
recommendations”, “At the close of escrow”, or “Once during the warranty period”. When
the period is related to a remodeling project it may be referred to as: “At the close of
construction”, “During the manufacturer’s warranty period”, “Upon acceptance of the work”
or “During the warranty period”.
8-31-09 7
Some Common Mistakes Made by Homeowners:
1) Irrigation System Sprinkler Heads Continuously Spray Against the Home:
Irrigation sprinkler heads that spray against the wood siding, masonry or stucco
walls could lead to rotted walls and leaching of the color from the stucco coating.
Note: All irrigation spray must be directed away from the home. The homeowner
should make monthly visual inspections to keep the sprinkler heads adjusted as to
not hit the home. Lawn maintenance with power mowers and edgers can and will
change the direction of the sprinkler heads and allow them to hit the home. In
addition, as the landscape materials grow the spray heads may need to be raised or
relocated to avoid any excessive over spray that may occur.
Moisture in the soil will act just like an irrigation system. Overwatering causes
moisture to stay in the soil longer and will eventually penetrate the wall or overflow
onto sidewalk or driveway. The issue that rises from over watering is the
appearance of Efflorescence over time. Taking advantage of the watering schedule
suggested by the Water District, not planting too close to the home or property walls,
and avoiding planting materials that have high watering requirements will help
with excessive water penetration and the appearance of Efflorescence.
Installation of solar screens to the exterior of the window can cause water
infiltration through the framing and could void the manufacturer’s warranty on the
window and/or exterior wall material. Care must be taken when mounting the
screens and should only be installed by qualified professionals.
Multi pane windows, also know as double-glazed and insulating windows consist of
two or more panes of glass that are separated by an air space that is usually 5/8”
thick. The air space is so tightly sealed that no air can enter nor leave the space.
This is the insulating factor. By installing a tinting film on the window, the rays of
the sun are reflected back into the air space which in turn causes excessive heat
build-up between the panes of glass and the likely rupture of the seals. Once the
insulating value is lost, due to the improper installation of the window tinting, the
manufacturer’s warranty on the window will become void.
8-31-09 8
5) Alteration of the Finished Grades Around the Home:
The homeowner must give special attention to prevent erosion, maintain the grading
contours, avoid blocking the drainage design patterns and incorporate the original
design patterns into any landscape improvements. The proper slope and drainage
swales must be maintained to keep any water flow away from the home. Avoid any
improvements that alter the design pattern since these may cause water damage to
the home that will be the responsibility of the homeowner.
Proper design and installation measures must be taken when adding concrete
walkways and patios. The proper slope must be incorporated in the walkway or
patio to ensure that no water is allowed to backup or flow towards the home;
possibly causing damage to the structure. A minimum of two inches or code
requirement from the bottom of the weep screed to the top of the walkway or patio
should be maintained to allow the building structure to weep moisture from the
exterior clad. Not doing so, may void the contractor’s warranty and become the
responsibility of the homeowner.
These structures include a lanai, deck or deck trellis or other shading structures or
devices that are attached to the home (i.e.: satellite dishes, etc). Qualified
professionals can provide structures that are the proper design and type that will
insure watertight connection to the home. Avoid any “add-on structures” that are
improperly installed to the exterior of the home. As time passes, water will find its
way into the home and may cause damage. Proper flashing and/or caulking should
be applied as necessary. Improper attachment to the home may void the warranty
offered by the contractor towards the integrity of the original structure.
Roofs are not designed to be walked on. In addition to being a slip and fall hazard,
carelessness can cause damage to the roofing materials and roof leaks.
The light fixture boxes that are supplied in the home are specifically designed for
hanging light fixtures. Ceiling fans have a special mounting box that requires a
different mounting system. If a ceiling fan is hung from an existing light fixture box,
over time the fan’s vibration and weight can cause the entire installation to pull
8-31-09 9
away from the ceiling. This will cause a very hazardous situation and shall void
both the contractor’s and the manufacturer’s warranty.
10) Turning off the HVAC when your way from home:
The HVAC system is what controls the climate of the home. If the home experiences
extreme climate conditions during the summer or winter, the home will experience
severe expansion and contraction events. This can cause tile and drywall to crack,
wood to warp, etc. This is not recommended by either the contractor or the
manufacturer.
The sewer cleanout and back water values are added to help plumbers break up
stoppages and help prevent property damages due to sewer overflow. The
homeowner should refrain from cutting the sewer cleanout below grade and burying
them in landscaping. The caps should never be removed to allow the pipes to
breath. The homeowner is responsible for maintaining the sewer laterals and
cleanouts. For more information on proper sewer maintenance and/or information
regarding proper disposal of waste (i.e.: cooking grease, medications), you can
contact the local water reclamation district.
8-31-09 10
PERFORMANCE GUIDELINES
8-31-09 11
Contractor Responsibility: Contractor should repair, adjust, or replace operating
parts as required within the warranty period.
Comments: Misuse by the homeowner such as overloading drawers, or hanging or
leaning on doors may void the warranty.
8-31-09 12
Carpeting
8-31-09 13
POSSIBLE ISSUE #4:
SEAMS VISIBLE OR SEPARATION OCCURS IN THE CARPETING
Performance Guideline: All properly installed carpet seams are visible to some
degree depending upon the type, color, location, light exposure and installation of
the carpet. Seams that have gaps, overlap or excessive separation do not meet the
performance guideline. Excessive seams will not be accepted.
Homeowner Responsibility: Report excessively visible seams, or seam separations to
the contractor at homeowner walk through and/or closing.
Contractor Responsibility: Contractors who install carpeting will be expected to
resolve problems regarding manufacturing defects with the manufacturer on behalf
of the owner, if the contractor was responsible for the sale, and/or selection of the
carpeting and repair during the warranty period to meet the performance guideline.
Comments: None
8-31-09 14
Decks & Balconies – Wood
8-31-09 15
vertical displacement or compound cracking is present, the affected area should be
replaced. Cracks in sidewalks that exceed ¼ inch may require the affected area to
be replaced.
Comments: Trees planted too close to a concrete driveway or walkway posses the
potential for the root structure to undermine or heave the concrete thus causing
cracks. Heavy vehicles, such as RV’s can also cause cracks due to their excessive
weight. Tree roots need to be watched so that they are not under the driveway or
walkway. Homeowner should notify contractor of "excessive" weight issue with an
RV or heavy vehicle before or during the sale. Heavy RV’s should not be driven or
parked on driveways.
8-31-09 16
POSSIBLE ISSUE #4:
SETTLING OR HEAVING OF STOOPS OR STEPS
Performance Guideline: Settling or heaving of stoops or steps in excess of a 1/4 inch
is unacceptable
Homeowner Responsibility: The homeowner is responsible to maintain the shrubs
and trees around the steps and stoops to help prevent any extra settling or heaving.
Notify the contractor if the settling or heaving exceeds the performance guideline.
Contractor Responsibility: The contractor should repair or replace the stoop or step
if it is out of compliance to the performance guidelines and within the warranty
period.
Comments: Trees planted too close to a concrete step, stoop, or walkway posses the
potential for the root structure to undermine or heave the concrete. Overwatering
the vegetation can also cause the soils to settle or swell. It is the homeowner’s
responsibility to control their watering schedule.
Drywall
8-31-09 17
POSSIBLE ISSUE #2:
CROWNED JOINTS ARE VISIBLE THROUGH THE DRYWALL
Performance Guideline: Crowned joints should not exceed 1/8 inch within 8 feet as
measured with a straight edge placed over the center of the joint.
Homeowner Responsibility: Report any visible crown joints in the drywall to the
contractor.
Contractor Responsibility: Contractor should repair as necessary during the
warranty period.
Comments: Contractor will make all reasonable efforts to match existing materials
as closely as possible; however, the contractor is not required to guarantee an exact
match of either texture or color.
8-31-09 18
POSSIBLE ISSUE #6:
CEILING SAGS
Performance Guideline: Ceiling should not sag more that 1/4 inch with in 8 feet.
Homeowner Responsibility: Report drywall sagging that exceeds the Performance
guideline to the contractor.
Contractor Responsibility: Contractor should repair as needed during the warranty
period.
Comments: Contractor will make all reasonable efforts to match existing materials
as closely as possible, however, the contractor may not guarantee an exact match of
either texture or color.
Electrical
The minimum Guidelines in the electrical field should be in compliance with the technical
provisions of the National Electrical Code of the National Fire Protection Association and
the local amendments, in the form approved by the authority having jurisdiction at the
time of construction.
8-31-09 19
Homeowner Responsibility: Check the A.C. unit for any debris, which may be
blocking airflow or obvious damage to unit. Reset breaker; if breaker continues to
trip, call for service.
Contractor Responsibility: Have electrical contractor check the breaker size (should
be maximum size allowed) and check applicable electrical connections for tightness
during the warranty period. If the electrical circuit is ok, the A.C. contractor should
check the condenser unit for proper operation during the warranty period.
Comments: None
8-31-09 20
Comments: For example, 20 Ampere Receptacle and Light circuits are designed to
carry 16 amperes per the National Electrical Code. Loads that add 10 to 12 amperes
to a circuit that is already using 10 or 12 amperes may trip the circuit breaker to
protect the circuit wiring.
8-31-09 21
Contractor Responsibility: Within the residence, defective cable or cable connectors
should be repaired as required during the warranty period by appropriate means.
Comments: Signal strength may need to be checked or adjusted by the cable
provider.
Exterior Ironwork
8-31-09 22
Comments: Caulking is commonly used throughout the interior and exterior of the
home as sealant or cosmetic filler. Even properly installed caulking will deteriorate,
shrink and crack with normal exposure to the elements, wear, and aging or from
movement of the materials it is adhered to. Damage to the home can be slow and
difficult to detect. Water intrusion can become a costly repair if the caulk is not
properly maintained.
8-31-09 23
Contractor Responsibility: Reapply paint as needed to meet the Performance
guideline during the warranty period. Contractor will make all reasonable efforts to
match existing materials as closely as possible; however, the contractor does not
guarantee exact match paint.
Comments: Paint should cover all the intended surfaces, fully and completely. No
light or inadequately covered areas should exist.
8-31-09 24
match existing materials as closely as possible; however, the contractor does not
guarantee an exact match of either texture or color.
Comments: None.
Insulation
8-31-09 25
Plywood or Other Veneer Siding
Due to varying moisture conditions throughout Nevada, wood products will continue to
expand and contract. This action is normal and beyond the contractors control.
8-31-09 26
Stucco
8-31-09 27
Contractor Responsibility: Contractor should repair the excessive gaps during
warranty period. Contractor will make all reasonable efforts to match existing
materials as closely as possible; however, the contractor does not guarantee an exact
match of either texture or color.
Comments: None
8-31-09 28
Homeowner Responsibility: Report excessive buckling of the tongue and groove
wood siding to the contractor.
Contractor Responsibility: Contractor should repair or replace the wood siding as
necessary during the warranty period. Contractor will make all reasonable efforts to
match existing materials as closely as possible; however, the contractor does not
guarantee an exact match of either texture or color.
Comments: Buckling may be caused by the increase in relative humidity, which in
turn causes the expansion of the wood siding. Allowing the wood siding to set
outside for a few days, to adjust to the ambient humidity prior to installation, may
help.
8-31-09 29
Homeowner Responsibility: Report excessive gaps between the siding and the
molding to the contractor.
Contractor Responsibility: Contractor should correct the areas with excessive gaps
during the warranty period.
Comments: None
8-31-09 30
Contractor Responsibility: Contractor should repair, replace, clean and/or treat the
affected shakes that have bled through the paint or stain once during the warranty
period. Contractor will make all reasonable efforts to match existing materials as
closely as possible; however, the contractor does not guarantee an exact match of
either texture or color.
Comments: None
General Subject Information: This section refers to any fireplaces or decorative gas
appliances (DGA) that may be installed in or around the home. To clarify, a fireplace is
defined as any unit designed and equipped to burn combustibles (wood, paper, etc) in
addition to gas. A decorative gas appliance (DGA) will be defined as those units that
aesthetically resemble fireplaces but are designed exclusively to burn gas only. An exterior
gas lamppost or coach light and any gas burning barbecue unit will also be designated as a
decorative gas appliance. Due to the dangers of improper fireplace installation, only
qualified fireplace installers should complete the work. In Clark County, Nevada,
contractors are strongly encouraged to have a certified Gas Hearth Appliance Specialist on
staff to ensure the proper installation of the fireplace. In addition, Clark County also
requires that the fireplace be an EPA approved Phase II type model and can only be
installed above an elevation of 3,000 feet. Note: Direct Vent gas appliances are clean
burning (much cleaner than any Phase II wood burning fireplaces), in which case does not
apply to the same EPA category.
8-31-09 31
Contractor Responsibility: Contractor should repair or replace as necessary during
the warranty period, unless homeowner misuse or negligence is evident.
Comments: The doors should meet evenly and align with each other.
8-31-09 32
Floors & Ceilings
8-31-09 33
Comments: Warped or twisted beams or posts can occur as they dry. Beams or
posts should not twist more than 1/16 inch per foot of 4 x 12 inch descending ratio as
follows:
• 4” x 12”, 1/16” twist per foot, 1 1/4” total allowable;
• 4” x 6”, 1/32” twist per foot, 9/16” total allowable;
• 4” x 4”, 1/40” twist per foot, 1/2” total allowable.
Warpage or twisting should not damage beam pockets.
Foundations
Check with local building officials for required depth in the area where the construction is
planned.
This section applies to standard steel troweled or light broom finishes. Specialty finishes
are not included. Settling and heaving of soils under concrete caused by alteration of
grades by owner or owner’s agent, which create excessive ponding or moisture adjacent to
concrete foundations, walks, drives, slabs, or patios, should not be considered the
contractor’s responsibility, providing he has met all the conditions called for in the contract,
plans, specifications, and all code requirements.
All concrete should be placed in compliance with applicable codes and standards. This will
apply to design strengths, dimensions, frost lines, and reinforcement, along with items not
specifically contained in the codes, such as proper placement in a good and workmanlike
manner to achieve appearance and function of the finished product.
8-31-09 34
Comments: Cracking is a typical characteristic of concrete and is typically caused by
shrinkage during curing (drying), temperature changes, or normal movement due to
settlement. This is normal and can be expected.
8-31-09 35
Waterproofing & Vapor Barriers
Waterproofing and vapor barrier requirements may vary according to area. Check with the
local building official about specific requirements and methods approved in that area.
8-31-09 36
so that the door latches and seals correctly. Repair or replace defective materials
during the warranty period.
Comments: None
Buyer assumes responsibility of sprinkler heads, bubbler heads, and distribution tubing of
drip systems after 30 days, unless improper workmanship by the contractor can be shown.
8-31-09 37
POSSIBLE ISSUE #2:
WATER COVERAGE OF THE SPRINKLERS IS NOT COMPLETE
Performance Guideline: Heads should be placed to cover area intended with water
pressure and volume available. Coverage must be complete and thorough, supplying
full coverage of the intended areas without encroaching on the neighboring property
or excess water on sidewalks and streets.
Homeowner Responsibility: The Homeowner should make monthly visual
inspections to keep the sprinklers adjusted to ensure full coverage. The homeowner
should not alter the sprinkler system. Lawn maintenance with power mowers and
edgers may change the direction of the sprinkler heads causing a lack of coverage.
Redirect the sprinkler heads for full coverage.
Contractor Responsibility: Contractor should make necessary repairs during the
warranty period.
Comments: None
8-31-09 38
• Check for leaks
• Insure insulation secure
• Protect from freeze
8-31-09 39
Contractor Responsibility: Contractor should correct so that proper coverage is
achieved during the warranty period.
Comments: The landscape rocks may settle and sink into the soil, due to exposure to
wind, rain, and watering. Once settling occurs, the homeowner may have to add
rocks to maintain the landscape appearance. The rock should reference the ASTM
C88-05 for Soundness of Aggregate by Sodium Sulfate or Magnesium Sulfate and for
sieve testing for the amount of allowed in sized rock.
8-31-09 40
Heating, Ventilating and Air Conditioning Systems
General Subject Information: The majority of homes in Nevada are built with HVAC
systems in place for homeowner comfort. They are operated with electric Air-conditioning
systems and electric or gas heating furnaces. Certain design criteria are utilized in the
design of these systems in the corresponding area in which they are built in the state. The
design conditions vary in reference to the geographical areas but the final application and
comfort controls are the same. Homeowner maintenance is required to keep these systems
functioning properly.
8-31-09 41
Homeowner Responsibility: Proper thermostat operation, make sure you know how
to operate per the operation manual’s instructions. Windows should have some type
of shading device installed (i.e.: blinds, drapes tinting, solar screens, etc.) to reduce
the amount of heat gained from sunlight. Do not block airflow to or from HVAC
grills /registers. Airflow can be adjusted by opening and closing register louvers.
Maintenance Alert! Homeowner should change the HVAC system filter(s) pursuant
to the manufacturer’s recommendations. Filters are to be consistent with those
originally installed and with the manufacturer’s recommendations.
Contractor Responsibility: The contractor should make proper repairs or
adjustments to meet temperature conditions during the warranty period.
Deficiencies caused by malfunction of system equipment or appliances are subject to
the terms of the manufacturer’s warranty unless workmanship by the contractor is
involved. The contractor should be responsible for system balancing dampers,
registers, and other minor adjustments for operation during the heating season.
Contractor is to notify homeowner that they are required to adjust the air flow
dampers (grilles/registers) as needed after the original system balancing.
Contractor is to notify homeowner that filter replacement with filters that are not
consistent with those originally installed, may effect and reduce the system air
flows. This may contribute to inadequate air flows to areas of the house and
inadequate heating.
Comments: Many factors affect the performance of the HVAC system: the design of
the system, placement of furniture, solar orientation and the location of the room in
the house. For example, a room located on the second floor will be warmer because
warm air rises and cool air falls to the floor.
8-31-09 42
flow. If the system does not meet the requirements, the design professional needs to
be involved to resolve the lack of heating or cooling in that area of the home.
Contractor to verify in the following sequence:
1. Equipment is working properly.
2. System was installed per design.
3. System was properly designed.
Comments: The duct systems registers need to be balanced by the installing
contractor and then further adjusted by the homeowner to meet their own comfort
needs. The duct system should meet the design flow +/- 10% as required by the
ASHRAE Handbook.
8-31-09 43
can occur. Notify the contractor if the concrete stained area was placed by the
contractor.
Contractor Responsibility: If the condensate drain line terminates above existing
concrete surfaces, the contractor shall reroute or extend the lines past the edge of
the concrete to prevent moisture dripping onto the concrete.
Comments: Condensation water stains can occur when the homeowner has placed
concrete in an area that did not have concrete in place during construction of the
home. A rust or white colored stain can and will occur at this condition. Secondary
lines must be placed in visible locations, for example over windows or doorways.
Secondary lines will only drain if your unit is in need of service. Note that in North
Las Vegas, secondary lines can be found in the garage.
POSSIBLE ISSUE # 7:
HVAC SYSTEM IS NOISY WHEN OPERATING
Performance Guideline: Ducts should not rattle or “oilcan”. Air flowing through the
duct system is a normal part of the operation of the system; however, noise from
ducts should not be excessive.
Homeowner Responsibility: None
Contractor Responsibility: Determine cause and make necessary repairs during the
warranty period.
Comments: The air handler fan will make noise as it blows air throughout the
house. Noise will also be heard as air returns through the return air system back to
the furnace.
8-31-09 44
POSSIBLE ISSUE #10:
CONCRETE OR FIBERGLASS PAD AT THE CONDENSER LOCATION SETTLES AND
UNIT IS TILTED
Performance Guideline: HVAC condenser should be level within 1” from side to side,
unless otherwise stated by the manufacturer. Settling can and will occur over time
in addition to the weight of the equipment.
Homeowner Responsibility: Report excessive settling of the condenser pad to the
contractor upon visual inspection during the warranty period.
Contractor Responsibility: Contractor should re-level the pad during the warranty
period.
Comments: None.
8-31-09 45
Contractor Responsibility: If the equipment is placed in an area that is less than the
manufacturer’s minimum requirements, the contractor should change the location to
meet the minimum requirements.
Comments: The protective insulation that is around the Freon line over a few years
can turn brittle do to excessive heat and exposure to the sun. It is recommended to
replace the insulation every two years as standard homeowner care and
maintenance.
8-31-09 46
POSSIBLE ISSUE #4:
CERAMIC TILE FLOOR INSTALLATION IS OUT OF SQUARE WITH ROOM
Performance Guideline: Ceramic tile floor installation should be square with the
room.
Homeowner Responsibility: Report any out of square ceramic floor tile installations
to the contractor at the homeowner walk through.
Contractor Responsibility: Contractor should repair or reinstall the ceramic tile
floor as necessary during the warranty period.
Comments: Some times if a room is out of square it could be do to the grout lines not
lining up. Tiles are not always cut perfectly square which causes some lines to not
match up and cause variations. 1/16 inch variations are acceptable. If this is not
the case, same responsibility to the contractor applies.
Interior Countertops
8-31-09 47
Contractor Responsibility: Contractor should repair or replace as necessary during
the warranty period.
Comments: Homeowner modification or abnormal use may void the warranty.
Homeowner is responsible for maintenance and caulking where necessary.
Interior Doors
8-31-09 48
POSSIBLE ISSUE #2:
BOTTOM OF INTERIOR DOOR RUBS ON THE FLOORING SURFACE
Performance Guideline: All doors should clear finish floor material supplied or
installed by contractor by 1-inch minimum and 1-½ inch maximum.
Homeowner Responsibility: Notify contractor. Homeowner may be responsible for
door clearance if flooring material is purchased and installed by homeowner or
another contractor hired by the homeowner.
Contractor Responsibility: Contractor should repair as necessary during the
warranty period.
Comments: When the homeowner installs carpet or other flooring, the homeowner
is responsible for any additional door undercutting. A jump duct is a system that
uses 2 grilles connected by a single duct. One grille is located just inside room and
just outside the room near the door. The purpose of the jump duct is to balance the
room pressure with space outside the room. The presence of a jump duct reduces the
need for air clearance from the bottom of the door to the flooring. The door should
never rub the flooring in either case.
8-31-09 49
Homeowner Responsibility: Report cracked or loose marble, granite or stone.
Contractor Responsibility: Contractor should make necessary repairs or replace the
cracked or loose marble, granite or stone during the warranty period. Contractor
will make all reasonable efforts to match existing materials as closely as possible;
however, the contractor does not guarantee an exact match of either texture or color.
Contactor is not responsible for resealing, repaired/replaced tile.
Comments: Care should be taken not to drop large heavy objects on the marble,
granite or stone that can break or dislodge tile pieces.
8-31-09 50
duct reduces the need for air clearance from the bottom of the door to the flooring.
The door should never rub the flooring in either case.
Interior Stairs
8-31-09 51
Mirrors & Shower Doors
8-31-09 52
Comments: Surface imperfections such as "cat’s eyes" or “specks" in the glass
occasionally occur in the manufacturing process.
8-31-09 53
Contractor Responsibility: Contractor should check door for proper operation and
repair or replace components as needed during the warranty period.
Comments: None.
Plumbing
8-31-09 54
POSSIBLE ISSUE #4:
PLUMBING PIPES ARE LEAKING
Performance Guideline: The components of the plumbing system should completely
contain and/or transport water without leaking. There should be no leakage from
any soil, waste, vent, gas, or water piping,
Homeowner Responsibility: Homeowner should report leaks promptly to the
contractor to avoid additional damage. . Leaks must be reported in a timely manner,
or additional damage may occur.
Contractor Responsibility: Contractor should repair promptly and repair resultant
damage during the warranty period.
Comments: Homeowner should take action to stop or slow the leak as to lessen the
damage. Homeowner may be responsible for damage resulting from homeowner
misuse, neglect or delay in reporting damage.
8-31-09 55
manufacturer provides recommendations for the cleaning, care and use of these
finishes. Many elements that are beyond the manufacturer’s or contractor’s control,
such as the use of abrasive pads or cleaners, can rapidly deteriorate the fixture
finish and cause discoloration and/or tarnishing.
Roofing Materials
Roofs should not leak and should be installed per the manufacturer’s recommendations and
other applicable codes. The contractor may not be responsible for leaks caused by
alterations, tie-ins, or penetrations caused by owner or others after completion of the roof.
This section refers to the roofing system including asphalt and fiberglass composition (3
Tab) shingles, wood shakes or shingles, and concrete or clay tiles.
8-31-09 56
Contractor Responsibility: Contractor should determine cause of leak and make
necessary repairs during the warranty period.
Comments: None
8-31-09 57
Contractor Responsibility: Contractor should repair leaks as necessary during the
warranty period.
Comments: During heavy rains, overflow may occur.
8-31-09 58
Roofs – Structural Components
Skylights
8-31-09 59
POSSIBLE ISSUE #2:
MOISTURE CONDENSES ON THE INTERIOR SURFACE OF THE SKYLIGHT
Performance Guideline: Installation should be per manufacturer’s specifications.
Skylight perimeters must be detailed so that condensation water is adequately
trapped in an impervious gutter or similar detail, where it can rest until it has a
chance to evaporate.
Homeowner Responsibility: Report any leaks to the contractor. The homeowner
should take responsibility for the amount of humidity created in kitchens, baths,
laundry rooms and other devices that produce water vapor.
Contractor Responsibility: Contractor should repair as needed during the warranty
period.
Comments: Minor moisture condensation on the interior surface of the skylight
glazing may be considered normal.
Vinyl Flooring
8-31-09 60
existing materials as closely as possible; however, the contractor does not guarantee
an exact match of either texture or color.
Comments: None
8-31-09 61
Windows & Patio Doors
8-31-09 62
Contractor Responsibility: Contractor should adjust or repair as necessary during
the warranty period.
Comments: Dirt and debris in the tracks can clog the weep holes designed to drain
water from track. Weep-hole blockage may cause the water to backup and cause
damage. This would be considered normal care and maintenance.
Yard Grading
General Information: This section addresses the exterior areas of the property surrounding
the home. For clarity the following definitions have been added:
• Rough Grade: Ground leveling required for the excavation and preparation of
the building site.
• Final Grade/Landscape Grade/Finish Grade: The finished ground level adjoining
the building at all exterior walls. This grade must meet the approved drainage
design criteria.
8-31-09 63
Contractor Responsibility: Contractor should repair the affected areas as needed
and re-contour the drainage design pattern to the original design if necessary during
the warranty period.
Comments: Certain components are installed below the finish grade level of the
yard areas such as footings, utility lines and piping. After installation, the area
excavated should be back filled with sufficient compression (density) to prevent
settling or sinking.
8-31-09 64