The document outlines the repair work for the existing bore water pump house in the Gunadala area, detailing various tasks and associated costs. The total estimated amount for the project is ₹2,93,910.61, with a completion date set for March 2025. It includes a comprehensive list of materials and labor required for the project, along with their respective rates and quantities.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
18 views4 pages
Pump House
The document outlines the repair work for the existing bore water pump house in the Gunadala area, detailing various tasks and associated costs. The total estimated amount for the project is ₹2,93,910.61, with a completion date set for March 2025. It includes a comprehensive list of materials and labor required for the project, along with their respective rates and quantities.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4
VIJAYAWADA MUNICIPAL CORPORATION (2023-24)
Providing repairs to the existing bore water pump house in
Gunadala area, 1st Division in Works Division-II. Rc-E11- Name of the Work: 101310/2025, Ts:-EE-598/2024-25,Dt:- 28.01.2025, Agt :- EE-672/2204- 25, Dt:- 28.01.2025, Agt Amt:- 2,93,910.61 Ps, M/s Om Namo Sivayya, Time @ 1M. Estimate Amount in Lakhs 0.00 DETAILED CUM ABSTRACT ESTIMATE S.N Description of Item No L B D Qty. Rate Units Amount o Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the 1A dismantled material, disposal of unserviceable material and stacking the 10-03-2025 serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH Or say 2.70 570.34 1 Cum Earthwork excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational incidentalm labour charges 1B such as shoring, sheeting, planking, struting, etc, complete for finished item of work including seigniorage exclduing dewatering charges etc, as per SS - 20 B (APSS 308) Or say 13.50 332.70 1 Cum Engaging hydralic tractor on hier basis for lifting of debrise and shifting it to a 1C desired place as directed 3 2 6.00 2400.00 1 Day Providing stone Dust for filling including Cost and coneyance charges, 2A Spreading, Sectioning etc., complete. 12-03-2025 Or say 0.12 1154.40 1 Cum Brick Masonry in CM (1:6) with Bricks traditional size 23x11x7 cms 2nd class 2B including cost and conveyance of all materials and labour charges for mixing of mortor watering curing etc. complete. Or say 1.95 8225.65 1 Cum Engaging Labour on hire basis for Removing of debrise and cleaning of site 2C etc., complete as directed by departmental authorities. 5 4 20.00 784.00 Each Engaging Skilled plumbers for repaire works in pump house etc., complete as 2D directed by departmental authorities. 2 3 6.00 1113.00 Each Engaging Skilled plumbers for repaire works in pump house etc., complete as 2E directed by departmental authorities. 3 3 9.00 896.00 Each Supplying, fitting and placing HYSD bar reinforcement as per drqwings and technical specifications clauses 1000 and 1202 MORD & 1100, 1600 MORTH 3A for bars below 36mm dia including over laps and wastage, where they are not 15-03-2025 welded including cost and conveyance of binding wire and preparation and tying grills and fixing in position and labour charges etc., complete
Or say 32.50 93.02 Kg
S.N Description of Item No L B D Qty. Rate Units Amount o Providing concrete for plain concrete (M10) using 220 Kgs Cement ,40 mm nominal size hard stone aggregate , mechanically mixed, placed in foundation 3B and compacted by vibration including curing for 14 days complete as per drawings and technical specifications of MORTH Or say 0.40 1154.40 1 Cum Manufacturing, Supply, Delivery and fixing of M.S. Iron Gate , MS Grill using with M.S. Angulars, M.S. flats including cost and conveyance of all materials 3C and labour charges for cutting, welding, grinding and fixing etc., , complete.as directed by the departmental authorities.
Or say 90.00 131.15 1 Kg
Manufacture, Supply, & Delivery of HDPE Pipes conforming to IS 4984 - 2016
3D including transportation to anywhere in A.P, excluding all taxes (Supply up to 90 mm dia. in coil & above 110 mm dia. straight length.)(6.0 Kgs/cm2)
110mm MAT-07265 1 1 26.30 26.30 388.56 1 Rmt
Supply and placing of the RCC M20 (Design Mix) concrete corresponding to IS 456 using 60% of mixer 20mm size graded machine crushed hard granite metal (coarse aggregate) 40% of 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry, cement 350Kgs 4A including cost and conveyance of all materials like cement, fine aggrregate 18-03-2025 (sand) coarse aggregate, water etc., to site and all labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. Or say 0.28 11832.28 1 Cum Providing stone Dust for filling including Cost and coneyance charges, 4B Spreading, Sectioning etc., complete. Or say 19.56 1154.40 1 Cum Plastering for Walls in CM (1:3) 12mm thick including cost and conveyance of 5A all materials and labour charges for mixing of mortor watering curing etc. 21-03-2025 complete. Or say 13.24 4600.35 10 Sqm Plastering for walls in CM (1:4) 12mm thick including cost and conveyance of 5B all materials, labour charges for mixing of mortor watering curing etc. complete. Or say 24.94 4513.19 10 Sqm Providing concrete for plain concrete (M15 Design Mix) using 275 Kgs Cement ,20 mm,10mm nominal size Graded hard stone aggregate , 5C mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications of MORTH Or say 12.76 5253.23 1 Cum Flooring with ceramic tiles, set over base coat of cement mortar (1:8) 7.3 mm thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed with neat 6A cement to full depth mixed with pigment of matching shade including cost of 24-03-2025 all materials like cement, sand water and tiles etc., complete, including complete for finished item of work, but including the cost of conveyance of all materials. Or say 2.47 11321.33 10 Sqm S.N Description of Item No L B D Qty. Rate Units Amount o Walling with glazed red or white full body ceramic wall tiles of size 300 x 450 mm / 320 mm x 400 mm and thickness 6 mm 1st quality, including near cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed 6B with neat cement to full depth mixed with pigment of matching shade including cost of all materials like cement, sand water and tiles etc., complete, including complete for finished item of work, but including the cost of conveyance of all materials. Or say 10.26 11559.79 10 Sqm Painting, priming coat on new plastered surface to given an even shade after throughly brushing the surface to remove all dirt and remains of losse 7A powdered materials, including cost and conveyance of all materials to work 28-03-2025 site and all operational incidental labour charges etc., complete for finished item of work as per SS Or say 158.86 891.58 10 Sqm Painting walls with Plastic emulsion or other equal and approved water proof cement paint over priming coat, 2 coats (All colours) to given an even shade after throughly brushing the surface to remove all dirt and remains of losse 7B powdered materials, including cost and conveyance of all materials to work site and all operational incidental labour charges etc., complete for finished item of work as per SS.(For External walls) Or say 158.86 2557.39 10 Sq.m Painting with Synthetic Enamel Paints -Two coats -for Old Wood work to given an even shade after throughly brushing the surface to remove all dirt 7C and remains of losse powdered materials, including cost and conveyance of all materials to work site and all operational incidental labour charges etc., complete for finished item of work as per SS Or say 9.69 1426.50 10 Sqm Painting with Synthetic Enamel Paints -Two coats -for Old Iron work to given an even shade after throughly brushing the surface to remove all dirt and 7D remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational incidental labour charges etc., complete for finished item of work as per SS Or say 4.92 1283.13 10 Sqm Supply and Fixing of 18W/20W 1200 MM length LED batten light with extruded Aluminium housing and poly corbonate cover , input voltage AC 220- 8A 260 Volts with PF >0.9, surge protection 2 KV, THD <15 % with inbuilt driver 01-04-2025 and frosted cover CCT : 3000K -5700 K , minimum CRI >70, etc complete of make PHILLIPS ,LUMILEDS/OSRAM/SAMSUNG 1 4 4.00 1234.52 Each Supplying & Fixing white glazed flat back half stall urinals 1st quality conforming to IS:2556-1995 with standard C.P. Spreader of overall size 95 x 8B 95 x 57 mm conforming to IS:2556-Part6, Sec-6-1974 fixed with screws complete Indian make : 410 x 265 x 305 mm BMW-D.34 1 1 1.00 3003.98 Each 8C Supply, Delivery and fixing 12.7 mm dia NP push cock Ist quality 1 1 1.00 294.26 Each Supply, Delivery and fixing of Angle Valves including cost and conveyance of 8D all materials and labour charges etc., complete as directed by the departmental authorities (Rc.E11-102286/2021) 1 1 1.00 1194.04 Each Supply, Delivery and fixing of Weist Pipe including cost and conveyance of 8E all materials and labour charges etc., complete as directed by the departmental authorities (Rc.E11-102288/2021) S.N Description of Item No L B D Qty. Rate Units Amount o 1 1 1.00 120.00 Each Supply and Fixing of Premium make CPVC Pipes of ODPipe - SDR 13.5 and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS 8F (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowgurard SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007) (BMW-I.221) 22.20mm ODPipe - SDR 1 1 18.90 18.90 209.05 1 Rmt 13.5 (BMW-I.221) 15.90mmODPipe -SDR 1 1 20.60 20.60 178.38 1 Rmt 13.5 (BMW-I.220) Supply of 20mm PPR Ball Valve conforming to DIN Standards 8077/8092 8G (BMW-I.403 ) 1 1 1.00 194.28 Each 0.00 Or Say