Pipe Tech - COC - Rev 0 - Bypass - 101
Pipe Tech - COC - Rev 0 - Bypass - 101
New Replacement After Repairs Modifications After Relocation
Inspection Authority Indicated on Name No Name Plate Inspection Authority Number No Name Plate
Plate: Indicated on Nameplate:
Pressure Test – (Indicate if exemption / deferment from pressure test is required and applied for)
Pressure Test 01/02/2022 Test Pressure: 30.5 Bar Test Duration: 1 hour Test Medium: Water
Date:
Pressure Test
Results: Passed.
Authorization Signatory
1. Design calculations were verified and found acceptable. In case of piping the qualifications and
experience of the design engineer were confirmed.
2. Inspections, examinations, and tests prior to, during and after completion of fabrication / site Signature:
installation were found to be satisfactory.
3. Materials used for pressure parts were verified against the supplier’s mill certificates, checked for
compliance with the construction code and drawing requirements.
4. Transferring identification markings of the pressure components were carried out correctly by the Date: 04/03/2022
manufacturer to maintain traceability.
5. Welding was carried out by qualified welders / welding operators in accordance with code
requirements, using qualified procedures approved by 3rd party & client.
Stamp:
6. Qualifications of all personnel engaged in NDT were reviewed and found satisfactory.
7. Surface preparation, painting application and preparation for shipment / final installation were
generally observed.
8. Nameplate stamping and marking found to conform to the requirements of the PER and bears the
Pipe Tech name and Government approved inspection Authority Registered Number.