The document is a Certificate of Conformance for pressure equipment issued to ProGas for an LPG Tank 101 piping installation. It includes details about the design, materials, inspections, and tests conducted, confirming compliance with ASME B31.3 standards. The pressure test was successfully passed, and all qualifications and procedures were verified as satisfactory.

Uploaded by

kelwin.middleton
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views1 page

Pipe Tech - COC - Rev 0 - Bypass - 101

The document is a Certificate of Conformance for pressure equipment issued to ProGas for an LPG Tank 101 piping installation. It includes details about the design, materials, inspections, and tests conducted, confirming compliance with ASME B31.3 standards. The pressure test was successfully passed, and all qualifications and procedures were verified as satisfactory.

Uploaded by

kelwin.middleton
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

AIA (3RD PARTY) CERTIFICATE OF

CONFORMANCE FOR PRESSURE


EQUIPMENT

Client: ProGas Pipe Tech Certificate Number: PIPETECH-COC-PG-19069-001


Owner (Registered ProGas Site Number / X-Storage / Beira Manufacturer’s TEE / Mechanica
User): Location: Name:
Equipment LPG Tank 101: Manufacturer’s
Description: Piping Installation Project Number: 19069 Serial Number: ZA-081/B
– Bypass Line
Designer Responsible for Design – Lionel Gordon Designer Responsible for Design – 940327
Designer’s Name: PR Eng. / Tech No.:
Design 19.6 Bar N/A
Max Operating 14 Bar N/A Country of Origin: Mozambique
Pressure: Pressure:
Design -45 °C +60 °C Operating 30 °C N/A Year of Manufacture 2022
Temperature: Temperature: / Installation:
PWHT: N/A N/A NDT Percentage: 10% RT 10% Surface Piping Diameters 4” SCH 40
Testing & Wall Thickness: 1” / 1 ½” / 2” SCH XS
405005-00036-00-PI-ISO-100LPGPN16020-1
405005-00036-00-PI-ISO-100LPGPN16020-2 Design Code: ASME B31.3 – 2018
As Built / Isometric / GA 405005-00036-00-PI-ISO-100LPGPN16020-3
Drawing Number: 405005-00036-00-PI-ISO-100LPGPN16030-1
Construction Code: ASME B31.3 - 2018

Client Specifications: N/A Exceptions, Exemptions, Concessions N/A


or Deviations:
SANS 347 Hazard Categorization and Inspection Module: Hazard Category II, Module A2 + E1 and A2 + D1

    
New Replacement After Repairs Modifications After Relocation

Inspection Authority Indicated on Name No Name Plate Inspection Authority Number No Name Plate
Plate: Indicated on Nameplate:

Pressure Test – (Indicate if exemption / deferment from pressure test is required and applied for)
Pressure Test 01/02/2022 Test Pressure: 30.5 Bar Test Duration: 1 hour Test Medium: Water
Date:
Pressure Test
Results: Passed.
Authorization Signatory
1. Design calculations were verified and found acceptable. In case of piping the qualifications and
experience of the design engineer were confirmed.
2. Inspections, examinations, and tests prior to, during and after completion of fabrication / site Signature:
installation were found to be satisfactory.
3. Materials used for pressure parts were verified against the supplier’s mill certificates, checked for
compliance with the construction code and drawing requirements.
4. Transferring identification markings of the pressure components were carried out correctly by the Date: 04/03/2022
manufacturer to maintain traceability.
5. Welding was carried out by qualified welders / welding operators in accordance with code
requirements, using qualified procedures approved by 3rd party & client.
Stamp:
6. Qualifications of all personnel engaged in NDT were reviewed and found satisfactory.
7. Surface preparation, painting application and preparation for shipment / final installation were
generally observed.
8. Nameplate stamping and marking found to conform to the requirements of the PER and bears the
Pipe Tech name and Government approved inspection Authority Registered Number.