The document provides a detailed schedule of columns and footings for a construction project, including specifications for sizes, steel reinforcement, and lateral ties. It outlines the requirements for concrete mix, dowel lengths, and curing times, as well as safety and structural integrity measures. Additionally, it includes revision statements and contact information for the structural designer and consultant.

Uploaded by

yugagrawal5246
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views10 pages

Chameli Project Plan

The document provides a detailed schedule of columns and footings for a construction project, including specifications for sizes, steel reinforcement, and lateral ties. It outlines the requirements for concrete mix, dowel lengths, and curing times, as well as safety and structural integrity measures. Additionally, it includes revision statements and contact information for the structural designer and consultant.

Uploaded by

yugagrawal5246
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

1118&18

112
= 3,69,12,15,
0 LINE
19= FACE
710,13.||7=2510 258, &
44
40
-11-2 25-10"
LOATING COLUMN FROM 10
UPPER SR. FLOOR.
-14-8 -112
FACE LTNE
12&3 =00"
COLUMN NO. 1TOE DELETED
FROM UPPER GRFLOOR 9-2

5=92
4

6=132 2-2

-9-8
-1-G
7=182" 12-10"

-6-8
35 (9 -3
8&9=260" 144
3.

LFT SP)=296S 10 UFT


50 X50 13 65 85
10=326

-47
UFT (EP)= 3S6 39
11& 12 =390 144

13 = 4610"
-94
+2713)

14& 15 = 542:

-g182

10-10
ROTING OUMN PROR
18 19
FRON PPgGR. ROOR,
17,18 &19 =650 O NO. 19fO BE DELETED
FRMUPPERGR AO0R

10
48 -11-2
-9-7 -25-10° STILT FLOOR PLAN
WASTU RACIANAOSIN
38
NNDRASOUED
R.O. A. D.
FACE LINE OF APATMENY" CHAMEL' FOR PIYUSH LIFESPACES DMULE DATE :26/ 09/ 2022
SCHEDULE OF COLUMNS &FOOTINGS
COLUMN NOTATION C1,C7,C13,C17 C2,C15 C3 C5,C8,C14 C6,C9,C12 C10 C11 C18 C19
(FLOATING ABOVE)
(FLOATING ABOVE)
4-16
SIZE STEEL 18"21* 14-16@ 12x18" + 4 12x18" 10-127 12x21 12-163 12x18* * 1218 10-16 12%21 +1ß 12x18 "1318°x18 12-16

COLUMN LATERAL TIES

GROUND

FLOOR
SECTION

DIA NOS 10 21 NOS 10 14 NOS 10 11 NOS 10 22 NOS 10 15 NOS 10 14 NOS 10 17 NOS 10 16 NOS 10 21 NOS
SHO DIRECTION REIN. -65
LENGTH
DIA NOS 10 21 NOS 10 12 NOS 10 10 NOS 10 19 NOS 10 14 NOS 10 12 NOS 10 14 NOS 10 14 NOS 10 |21NOS
LONG DIRECTION REIN. 68 S5 -411 611 11

L2X B2 X D2 33x43x 12"


FOOTING
L1 X B1 X D1 69"x 70x24" 50° x59" x19" 46 x53 x17" 63'x73'x 15 56x63"x 21" 50" x59x19" 59"x 69%x 22" 59"x 63"x21" 69x 70'x 24
STEEL IN DIA. &SPACING (BOTTOM) q10@4 cdc 10 @5 cc 10 @6 dc q10@4 de 10@5 dc q10 @5 cdc q10 @5 cdc 10@5 dc 10@4 dc
SHORTER
DIRECTION DIA. &SPACING (TOP)
STEEL IN
DIA. &SPACING (BOTTOM) 10 @4 dc q10 @5 cc q10 @6 dc q10@4 dc q10@5 de q10@5 cdc q10 @5" clc 10@5 dc q10 @4 cc
LONGER
DIRECTION DIA. &SPACING (TOP)
** Lateral Ties to be provided to the Colum Jmm C/C
* SBC CONSIDERED TO BE 325 KN PE
*Extema! Walls Considered to be 6 ial - 4" thick (Red Clay Brick)
* Sunk for Toilets and Baths cons to be and For Washing Places it would be 3
SDE COER

ATERAL TIE
NaL
VERICAL STEL

For Footings:
1.Dowel length to me bars shall be 300 mm
in all footings.
2. Stirrups shall coninu of footing
i24

3. P.C.C. layer of M10 of 150 be placed


below footing.
REVISION STATEMENT
FGOrO
ABSTRUCTURAL CONSULTANT
POO S.N. DATE REV! REMARKS Structural Designer :Abhay VBhadlikar (MS)
For columns : 27/09/2022 RO Mobile No. 9422752529
1
1. Use M20 and FE 500 as construction Email ID:[email protected]
material 2 01/10/2022 R1 Revised Column And Footing Schedule
2. All rings to be at 8 mm Tor at 150 mm cc. RaNFORCEAGNT Address - Bhadlikars " K.N.Plaza " Wadibhokar
3. Stirrups in column beam juncion Road Deopur Dhule 424002 (MH)
are to be
min. three in junction area to column bars.
Unless otherwise specified. DESIGNED FOR- Ground + 4 Residential Loading Only
4. Face of columns to be CLIENT: Ar. Chajjed Sir
curtailed shall be as per
architectural drawings unless
5. Not more than 50% bars to beotherwise specified. PROJECT:Construction of Appartment For Mr. Kulkami Sir DESIGNED BY- Punit Jain PAPER SIZE -A3
curtailed at any section. DRAWN BY- Shekhar Sheramale DRAWING -2
TYPICAL DETAIL FOR ISOLATED FOOTING DRAWING:Schedule of Column &Footing
CHECKED BY - Abhay Bhadlikar
NOTES:
Schedule of Beamns 1.OUR RESPONSIBILITY SHALL REMAIN LIMITED TOSAFE
AND SOUND STRUCTURAL DESIGN AS TRANSMITTED
Bottom TOP 8Y THIS DRAWING AND WE SHALL NOT REMAIN
FLOATING COLUMN Beam Nos Beam Size
Throughout
Extra Stirrups Remark RESPONSIBLE FOKe URING
b. SAFETY OF ANY ADJoINING BUILDINGDEMOLITION.
Throughout Curtail
9"X18",10-12 T Left End Right End / PERSONS
FC B19 B 150 X 250 2-12 T 2-10 T SLAB 1 BEAM (BEAM TOP SUNK
STAYING IN ADJOINING BUILDING / PERSONS AND
PROPERTIES ON ADLOINING ROADS
B18 T8-200
TOP) c. SAFETY OF CONSTRUCTION WORKERIANY
CHB 150 X380 2-12 T 2-10 T T&-200 SLAB 1 BEAM sTRUCTION.
ACORRECTNESSSAEETY OE ANY TEMPORARY
3SUNP 3 CE
B3 230 X 450 2-16 T 3-12 T 2-10 T FROM CANTI. T&-150 SLAB 1 BEAM STRUCTURE, SCAFFoLDING, SHUTTERING, CENTERING
ERECTED AT SITE AND ANY INJURY TO ANY
B4 450 X 675 2-25+ 2-16T 5-25 T T 10-100(4-LEGGED) SLAB 1 BEAM
1 B9 150 X 380 2-12 T -
2-8 T T8-175 SLAB 1 BEAM
PERSONNEL ARISING OUT OF THEIR ACCIDENTS.

DESHUTTERING FALUL TY(SURSTANDARD


ZB5 B6 230 X450 2-16 T 3-12 T 2-12 T FROM CANTI. 1-12 T T8-150 SLAB 1 BEAM cONSTRUCTION MATERIAL OR WORKMANSHIP !
B7 230 X 450 3-12 T 2-10 T 1-12 T FROM CANTI. T8-175 SLAB 1 BEAM FAULTY CcONSTRUCTION PROCEDURE.
2 SUPERVISION IF SPECIFICALLY ASKED FOR WILL BE
B 230 X 380 2-12 T 1-12 T 2-10 T
SI B17 230 X 450
T&175 SLAB 1 BEAM
B16 89 2-16 T 1-12 T 2-12 T 2-12 T T8-150 SLAB 1 BEAM
REGARDING CORRECT AND SOUND CONSTRUCTION
CB9 FC) ESINKKIA C31 B10

B11
230 X 380
150 X 380
3-12 T
2-12 T
2-10 T 1-12 T 1-12 T T8-150
T8-175
SLAB 1 BEAM
SLAB 1 BEAM
SHALL SOLELY REST WTH CONTRACTOR/BUILDER!
OWNER
2-10 T
FLOATING COL. B1 230 X450 2-16 T 1-12 T 2-12 T 2-12 T T&-175 SLAB 1 8EAM UGHI
B13 230 X 380 3-12 T 2-10 T 1-12 T T8-150 SLAB 1 BEAM NOTICE BEFORE CONSTRUCTION
1-12 T 4. cONCRETE SHALL BE CURED FOR ATLEAST 24 DAYS.
9"X21",10-12T
B15 CB8 B14 230 X 450 2-16 T 1-12 T 2-12 T 2-12 T T&-150 SLAB 1 BEAM
REINFORCEMENT
B15 230 X 380 2-12 T 1-12 T 2-10 T FROM CANTI. T&175 SLAB 1 BEAM 1. ALL STRUCTURAL STEEL SHALL BE OF GRADE
230 X4S0 2-16T T&150 SLAB 1 BEAM FES00 [TORJ AND TIE MEMBERS SHALL BE OF
B16 2-16 T 3-12 T 2-12 T
B14 B17 230 X450 3-12 T 2-10 T 2-16 T FROM CANTI. T8-175 SLAB 1 BEAM GRADE FE 500 (TORI.
2. CLEAR COVER:
818 230 X 450 2-12 T 1-12 T 2-10 T T&-200 SLAB 1 BEAM FOOTINGS = 50; COLUMNS 25 MM FOR 12 T OR
B19 230 X450 2-16 T 2-12 T T&150 SLAB 1 BEAM 40 MM FOR 16 T& ABOVE; BEAMS =25 MM FOR
2-10 T 12T,18 TOR 40 MM FOR 20 TAABOVE:
B21 150 X450 2-12 T 2-10T T&175 SLAB 1 BEAM
SLABIS =20(mm).
BEAM (SIDE FACE REINE
B22 530 X 750 4-25 T 4-25 T 3-20 +1-16 T 3-20 T 2-16 T T 10-1004-LEGGEDSLAB 1 3. LAP LENGTHS: SLAB &BEAMS 603, COLUMN =450,
TOR STEEL
8B13 1T&-200
2-12 T ON EACH FACE)
SLAB 1 BEAM
TOR STEEI

B23 230 X 450 2-12 T 1-12 T 2-10 T 2-16 T 1-12 T


2-12T T175 CC
B24 230 X450 2-12 T 1-12 T 2-10 T 1-12 1 2-16 T T8-200 SLAB 1 BEAM NO. OF 1 oA OF DIA OF SPACNG
3-25 +1-16 T| 1 BEAM (SIDE FACE REINE
T 10-1004-LEGGED) SLAB 2-12
BARS BARS BAR
B25 $30 X750 425T 4-25 T 2-16T 3-25 T
T ON EACH FACE) CONCRETE
B26 150 X 450 2-12 T 2-10 T T&200 SLAB 1 BEAM ALL STRUCTURAL CcONCRETE SHALL BE
B12 SLAB 1 BEAM (BEAM TOP SUNK MACHINE MIXED TO AGRADE OF CONCRETEM20
B27 150 X 300 2-12 T 2-10 T T8200 2.CEMENT USED SHALL BE OPC OFGRADE 53
TOP) 3. THE MAXIMUM AGGREGATE SIZE SHALL BE 2
B29 230 X 380 2-12 T 2-12 T 2-10 T T&-175 SLAB 1 BEAM SHALL BE 12 MM IN THE
CASE OF PARADEre
830 230 X380 2-12 T 2-12 T 2-10 T T&175 SLAB 1 BEAM
4,TIS ADVISED TOUSE PLASTICISERS TO
B31 230 X450 2-16 T FROM CANTI T&-175 SLAB 1 BEAM
ST1 INCREASE THE WORKABILITY OF CONCRETE
CLB1 B32 230 X 530 2-16 T 3-12 T 2-12 T 1-12T 2-12 T T&150 SLAB 1 BEAM NOTES
B33 230 X530 2-16 T 2-12 T 2-10 T 2-121 2-12 T T&-150 SLAB 1 BEAM 1, DO NOT SCALE THIS DRAWING
1BI0 B
12 B34 230 X 530 3-16 T 2-16 T 2-12 T 2-12 2-12 T T&-125 SLAB 1 BEAM 2, CONSULT ARCHITECTURAL DRAWNGs FOR THE
DIMENSIONS.
B35 230 X450 2-16T FROM CANTI T&175 SLAB 1 BEAM 3. IN CASE OF DISCREPANCY, CONSULT
B36 150 X38o 3-12 T 2-10 T T&150 SLAB 1 BEAM STRUCTURAL ENGINEER
SLAB 1 BEAM THE DESIGN AND QUALITY OF SHUTIERINGIS
B37 150 X380 3-12 2-10 T T&150
THE CONTRACTORS LIABILITY
RO
6E9 B38 SLAB 1 BEAM
ESUNK 230 X 450 3-12 T FROM CANTI r8-175
SLAB 1 BEAM
DESHUTTERING PERIOD (IN DAYS)
CHB1 B39 230 X 450 2-16T 2-12 T 2-12 T 1-12 T 1-12 T T8-150 RTIFCAL
ELEMENT
SAND NATURAL
B40 230 X 450 2-12 T 1-12 T 2-10 T 1-12T T&-200 SLAB 1 BEAM SAND VSI) SAND
BS B41 230 X450 2-16 T 2-10 T 1-12 T FROM CANTI. T&150 SLAB 1 BEAM COLUNN
CB8 2-12 T
9"X21",10-12 T B42 150 X380 2-12 T 1-12 T 2-10 T T&-175 SLAB 1 BEAM (3" DOWN) BEAM SIDE 1 TO 1TO2
FLOATING COL HB HIDDEN BEAM BEAM BOTTOM (SPAN <3.6m)
230 X130 2-12 T 2-10 T T&-175 14
CHB1 230 X 130 FROM CANTI. FROM CANTI. T8-175 HIDDEN BEAM BEAM BOoTTOM (SPAN> 36m) 14 2
CB3 B6 B7
CB1 230 X450 2-12 T 3-16T T8-100 CANTILEVER BEAM CANTILEVER SLABBEAM 21
14 S CB1 CB2 230 X 450 2-12 T 3-12 T T8-100 CANTILEVER BEAM SMALL SPAN SLAD
z S1 CB3 230 X 450 2-12 T 2-161 T8-100 CANTILEVER BEAM LARGE SPAN SLAB 21
R5
CB4 230 X450 2-16 T 4-16 T T8-100 CANTILEVER BEAM REVISION STATEMENT
CB5 450 X 675 2-25 + 2-16 T 5-25 T r10-100(4-LEGGED) CANTILEVER BEAM SN DATE REV REMARKS
CBE 530 X750 3-20 T 1 09/11/2022RO
6-20 1 10-100(3-LEGGED) CANTILEVER BEAM 15/11/2022 R1 AS PER ARCHITECTS REO.
(19) Cê5 530 X 750 3-25 + 1-16 T 6-25 T T10-100(4-LEGGED) CANTILEVER BEAM
B4
CB8
18A F CB9
230 X380
230 X380
2-12 T
2-16T
3-12 T
4-16 T
T8-100
T&100
CANTILEVER BEAM
CANTILEVER BEAM
CUENT:Ar. Chaled Sir
PROJECT:Conetruclon of Apparbnert For Mr. Krni S
CLB1 230 X450 2-16 T 3-16 T T&100 CANTILEVER LANDING BEAM
B3 DRAWING:Deslon of Beams at Seb 1 Level
FLOATINGd CR81 150 X450 2-16 T 2-12 T 2-12 T T8-125 CRANKED BEAM
FLOATING COLUMN
B1 g"x18", 8-12 Slab Schedule
Slab No
AB STRUCTURAL CONSULTANT
Thicknes Maln Dir. | Sec. Dlr. Remar
g"X18",10-12 T
AB
S
Structural Deaigner. Abhay VBhedilcr (NS)
130(5") T&-150 T8-200 ONE WAY SLAB
130(5") T8-175 T8-175 TWO WAY SLAB Address :-Bhedikars" KNPazz Wadbiolor
130(5") T125 T8-125 TWO WAY SLAB Road Deopur Dhue 424002 (M)
LHS RHS 130(5") T8-150 T8-175 TWO WAY SLAB
150(6") T10-125 DESIGNED FOR-Ground+4 Residentil Lodnn On
T8-150 CANTILEVER SLAB
S6 130(5") T8-100 T8-150 CANTILEVER SLAB DESIGNED BY - Punt Jaln PAPER sIZE-A3
ST1 150(6") T12-125 T8-150 STAIRCASE WAIST SLAB DRAWN BY- Sheihr Sheramale DRAWNG- 1
lCHECKED BY -Abhay Bhadiar
25-10°

2-9 +27-o 1-8

22-9 21-10
20-5 20-6

6
TCLET
|73X4%
5-6 4-6
-2-7-
11-3"
8 3'9
BEDRJ2 -4 UP
142'X 113'
UFT
65 50 X50 5-6
RLAT NO, 7
-3COMMON
LOBBY
Z7X130
14-2" 3-9

13-9 HALL 68
142X 139
LVL +41G
446 44-6
KITCHEN
10-4
1OI'X 104
86 -5-10 WASH
DINING 3TX 94
98X9479
4%
8-10' A4 tr TOILET
(14) F6X40 1-10
4
MASTER BED
1211"X 100
PAS5AGE
26X39
10
TOILET
10 40 X89
19
BED RM.
(17) 120X 100 BALCONMI
18 FOURTH FL0OR PLAN
33 B'A 1334.00 S0 FT
d BJA =294.00 5QFT4OPEN TERRACE HALF AREA
TOTAL BIA = 1628 00 30T
12 -12-11 WASTU RAEHNA ASOCATES
25-10 -2-7
(UNNULTNIENGONER
WINLAKK
PROPOSEDAARTIMENT CHAMELI" FOoR PIYUSH UFESPACES DHULE DATE :26 / 09/ 2022 NNN NALUN)
-25-10'
-24-10"
11
2-7-

2-9 21-10
20-6 20-6

6
TOHF
73X 4
46
9
6
113
BED RM.
|42'X I13
(10) LIFT
65 86 -3490OMMON 50 X50
FLAT NO. 8
LOBBY
7X 130
39
14-2
HALL 63
13-9 142X 139
LVL +520
446
4-6
KTCHEN 10-4
1OIX I04
$6 -5-10 WAS
DINING 30 X34

-3-5
8-10 TOILET
14 Gx40

MASTER BED
12|1"X 10
PAS5AGE
26X39
10
TOILET
10 47 X89
19
BED RM.
(1) 120x 100
3-3
FIfTH FLOOR PLAN
6 10-3 BA =1334.00 SQ.FT.
-12 WASTU RACHANA ASSOCIATES
25-10" RAJENDRA SCHHAED
CUNSULTNO ENGINER
VAKRARKAR DHULE
PROPOSED APAKTMENT CHAMELI` FOR PIYUSH LIFESPACES DHULE DATE: 26/09/ 2022 PIONE NDL(O68
1&18=112. 3,6,9,12,15,|
a|7
=
2510
610
= UF(SP) 19=00° LINE
LFTEP) 10"
= FACE
710,13, 258, &

40
11-2 25-10"
FLOATING COLUMN FROM 10
UPPER GR. FLOOR.
-14-8 +11-2
FACE LINE
1,2 &3 =00"
|COLUMN NO. TO EE DELETED
FROM UPPER GRJFLOOR. 9-2"

5=92"

6=132" +2-2

-10-6
7= 182 12-10°

8&9= 260" 144


URL

10 UFT
50'X50 13 5 85
O 0=326
4-7
UFT (E.P)= 356 39
11& 12 =390" 144

13 =4610"
+224(3)

14& 15 =542" 13

|10-10
AOTING CO UMN FROM
18 IposRGROOR
ORUMN NO. 1zORE DELETE)
ROM UPPaGR. FOOR.
17,18 &19 =650 tOU NO. 19fO BE DELETED
FROMUPPR FLOOR

FLOATING COIMN FROM


UPPER GR. FLOOR,

-14
-9-7 -25-10 STILT FLOOR PLAN
WA RAOHANA ASOCATES

R.O. A. D.
FACE LINE OF ARTMENT"CHAMELI" #OR PIYUSH LUIFESPACES OMULE DATE :26/09/ 2022
202226/09/ DATE:LIDHULEFESPACES PIYUSH CHAMELI'
FOR APARTMENT PROPOSED
DHIE WAKHURA D.
A.O. R.
UNSULTINGENINDE
UED CH#RATVERAS
ASSOCATES RUCHANA OASTU
SQ.F1721.00
T BI=
A 2S-L0
PLAN FLOOR STILT
10
PÈNGLO
1
ADOR UPRER
GR FREN
FO
UPPERGR
EOUUMNROM FAONTING
259
4
39
130 X
43
85 65 56 50
50X LOBBY
LIFT COMMON
3-9 ss UP
3-10
9) 7oX3J
TOLET ALN
+20 LVL
I06X
80
CABIWATCHMEN
N
10-6 ql2-2
13-2
ROR UERGR FTM
8
25-10 -I1-2
10
25-10" 27"-o
ROATING COLUMN FROH
-10-1" 6
UPPER GR. FLOOR
-10-0 &iY
&6
6 18
-27
2
11 TOIL A2a KICHEN 10
BALCCN 4 X 7C
BED RM.
FLOANG COLNFROM WAS
PASSAGE 30 X1Oi
ER GR. AOOR.
AN28X36
4"

TOLE
FD
4
94 BED RM. 6
I04 X120"
DINING
98 X94
AAT NO. 2,4&6
-5-103

HALL
142X 139
139
LVL+100}206° #310
139 -4-1' -
TYPE B
39

COMIAON LIFT
65 $6 40BBY 50' X50 5-6 65
7T130
39
TYPE A
-14-2"
13
HALL
142X 139"
LVL +100,206*310
KTCHEN
10-4
AAT NO. 1,3&5
1O1"X 104
86 -5-10 WA
DINING 30 X 94
98X94
ERRACE
4
TOLE
[14) 7GX40

MASTER BED
(14 PAS5AGE
127 X100
26 X39
10
TOILET
40 X8) AOADIGouMN RONUPPER

BED RM.
(19) AOR.

120 X100 6
18 HBALCONY TPICAL FIRST.SECOND THIRD FLOOR PLAN
03X 3-3 BIA = 1004 005Q.FT.(MPE A)
BÀ = 975.005Q.FT.(0YE B)
TOTAL BIÁ = 1979.00 5Q.TAOOR
12 WASTU RACHNA SOTAE
-12-7 RJENDRA SCHHAJED
25-10 QUNSULTINGENGINE
PROPOSED APARTMENT HAMEL FOR PIYUSH
rESPACES DHULE DATE:05/01/ 2023. HONE NO (02503)251
39-7
-I12"
-25-10 - -2-7 10

29
HOATINGCOLUPNFR
2
(1)P6
OUNN NO. ITO BERETED
RON UPER G&AOR

13
P/A =143.00 SO.FT.

PIA=140.00S0.
972-+ -10-6
WATCHMEN CABIN
10GX 80
PIA =143.00SQ,FT. LVL +20
P4
7
TOILET
3-21 8 31
2-7

P/A =148.00 SQ.FT. 39

PARKING
10 2510 X65O COMMON UFT
LVL +1G LOBBY 50 X50 58 65 85
43 X130
COMMON AREA =102.00 S0,FT.
P3

COMMON PARK

BPIA =138.00 SQFT.


P2 P/A =100.00 SQ.FT.
P7

15
P/A =146.00 SQFT. 14

20-7| PI

ROATING OUUMN FRON


19
uUMN NO. 17T0 8E DAFTE
(18) UPPERER. Rog
ROM UPERGR AOOR.
PIA =146.00 SQ.FT. PA =183,00 SQ.FT. UMN NO, J TO BE ELETED)
FRON UPER GR. AbOR

L124 33
LOTTING ODLIMN FROM
UPPER C. POOR.
10
STILT ALOOR FLAN
-9-2 -5-10 BA721.00 5Q.FT.
-37-7 M GAHE ASTU RACHANA ASSOCAVTES
R.0. A. D. RAENDRA S. CHHAJED
UNSLLTING ENGINDER
VASAKAR DHULB
PROPOSED APARTMENT CHAMMEL! FOR PIYUSHLIFESPACES DHULE DATE 06/01/ 2023 PONH ND (056112416R0
2-8
6-9
Z(3)
4-8 H26-3
8

+3-2-o-4-1

-6-6

321
29
8
-4-11
WATCHMEN CABIN
-9 106' X80
LVL +20

3-3

6-6
3-2

429 UFT
(10 6 50 X50

2449 -24 6
39

3 -411 -73
13 PARKING
79
LVL +1'G
3-4

5 6-2-6

H2-11tt
69
385
2-10" 2-10

M.S. GATE

You might also like