0% found this document useful (0 votes)
29 views11 pages

ROAD DETAILS OF ID 108 Gopal Nagar N Block

The document outlines the development works for unauthorized colonies in Gopal Nagar N Block, detailing various construction activities including road and drainage work. It provides a comprehensive list of items with quantities, rates, and total amounts for each task, culminating in a total project cost of approximately 27,542,907.00. The document also includes specifics about the types of roads and their dimensions.

Uploaded by

keslecdesign
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views11 pages

ROAD DETAILS OF ID 108 Gopal Nagar N Block

The document outlines the development works for unauthorized colonies in Gopal Nagar N Block, detailing various construction activities including road and drainage work. It provides a comprehensive list of items with quantities, rates, and total amounts for each task, culminating in a total project cost of approximately 27,542,907.00. The document also includes specifics about the types of roads and their dimensions.

Uploaded by

keslecdesign
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 11

DELHI STATE INDUSTRIAL & INFRASTRUCTURE DEVELOPMENT CORPORATION LTD

Name of work : Development Works in Unauthorized Colonies.


Sub Head : C/o road and S.W Drain at Gopal Nagar N Block, Reg. No. 108

S.No. Description of Item Qty. Unit Rate Amount


1 DSR-2014/P-242/15.2.2
Demolishing cement concrete manually / by
mechanical means including disposal of material
within 50 meters lead as per direction of Engineer
–in – charge
(a) 1:4:8 or Linear mix 198.10 cum 550.50 109054.05
2 DSR-2014/P-242/15.7.4
Demolishing brick work manually/ by mechanical
means including stacking of serviceable material
and disposal of unserviceable material within 50
metres lead as per direction of Engineer-in-
charge.
In cement mortar 237.71 cum 754.10 179257.11
3 DSR-2014/ P-111/6.1.2
Brick work with common burnt clay F.P.S.(non
modular) bricks of class designation 7.5 in
foundation and plinth in:

(a)Cement mortar 1:6 (1 cement : 6 coarse sand) 812.06 cum 4677.25 3798207.64
4 DSR-2014/P-216/13.4.1
12 mm cement plaster of mix
(a) 1:6 (1 cement : 6 coarse sand) 3530.73 sqm 158.40 559267.63
5 DSR-2014/P-85/4.1.3 ,4.1.10
Providing and laying in position cement concrete
of specified grade excluding the cost of centering
and shuttering. All work up to plinth level.

(a) 1:2:4 (1 cement : 2 coarse sand : 4


graded stone aggregate 20 mm nominal
size) 48.60 cum 5466.30 265662.18
(b)1:5:10 (1 cement : 5 coarse sand : 10
graded stone aggregate 40 mm nominal
size) 387.88 cum 4004.00 1553071.52
6 A/R based on DSR-2014
Providing and fixing 25mm thick with cement
concrete 1:2:4 (1 cement : 2 coarse sand : 4
graded stone aggregate 12.5mm nominal size) on
the top of S.W. drain walls including centering and
shuttering etc. complete. 1214.98 sqm 161.13 195769.73
7 DSR-2014/P-217/13.18
Neat cement punning. 4745.71 sqm 41.40 196472.39
8 A/R based on DSR-2014
Supply of earth by mechanical transport i/c
Royality, excavation, loading, unloading and
banking the same in layer not exceeding 20 cm in
depth, breaking clods watering, rolling each layer
with ½ tonne roller or wooden or steel rammers,
and rolling every 3rd and top-most layer with
power roller of minimum 8 tonnes and dressing up
with proper camber for roads inculding filling up
ground depressions with 30 Km lead and lift upto
1.5m : Rolling by means of compactor
( where 8 tonne roller can not be used) to
achieve the required DBD shall also be the
part of item.

2537.11 cum 737.77 1871803.64


9 DSR-2014/P-89/4.20.1.2
Providing and laying in position ready mixed plain
cement concrete, with cement content as per
approved design mix and manufactured in fully
automatic batching plant and transported to site
of work in transit mixerfor all leads, having
continuous agitated mixer, manufactured as per
mix design of specified grade for plain cement
concrete work, including pumping of R.M.C. from
transit mixer to site of laying and curing,
excluding the cost of centering, shuttering and
finishing, including cost of curing, admixtures in
recommended proportions as per IS : 9103 to
accelerate/retard setting of concrete, improve
workability without impairing strength and
durability as per direction of the Engineer-in-
charge. M-10 grade plain cement concrete
(minimum cement content considere @ 220
kg/cum) 945.83 cum 5931.11 5609821.77
10 A/R based on DSR-2014
Providing and laying ready mix cement concrete
of M-30 grade, in roads, manufactured in fully
automatic batching plant & transported to site
work in transit mixer, using cement content as per
design mix, using coarse sand and graded stone
aggregate of 20 mm nominal size in apporpriate
proportions as per approved & specified design
criteria including cost of admixtures in
recommended proportions as per IS : 9103 at
accelerate / retard setting of concrete,improve
Workability without impairing strength and
durability including pumping of RMC from transit
mixer to site laying at site, spreading and
compacting, mechanically by using needle and
surface vibrators, leveling to required slope /
camber, finishing with required texture, brooming
with wire brush curing excluding the cost of
centering shuttering complete all as per direction
of Enginer-in-charge (minimum cement content
considered @ 340 kg/cum)

1556.10 cum 6539.70 10176427.17


11 DSR-2014/P-72/2.4
Deduct for not rolling with power roller of
minimum 8 tonnes for banking excavated earth in
layers not exceeding 20 cm in depth. 541.68 cum -3.00 -1625.05
12 A/R based on Market Rate
Providing and laying P.V.C sheet 125 micron thick
on lean cement concrete surface without creases
whereever overlap is necessary. The same at least
should be overlapped 300mm the surface of lean
cement concrete shall be swept clean of all
extrenous material before pacing & fixing with
plastic nails 9909.73 sqm 8.74 86611.07
13 A/R based on DSR-2014
Deduct for not laying the concrete by using the
pump, piping-work & accessories etc, as per
direction of Engineer-in-charge 2141.30 cum -174.23 -373078.70
14 DSR-2014/ P-262/16.45
Providing and fixing in position pre-moulded joint
filler in expansion joints
per cm
depth per
cm width
per m
6245.40 length 2.45 15301.23
15 DSR-2014/ P-96/5.9.1
Centering and shuttering including strutting,
propping etc. and removal of form for :
(a) Foundations, footings, bases of columns, etc.
for mass concrete 1563.46 sqm 196.45 307141.72
16 DSR-2014/ P-96/5.1.2
Providing and laying in position specified grade of
reinforced cement concrete excluding the cost of
centering, shuttering, finishing and reinforcement
– All work up to plinth level
1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded
stone aggregate 20 mm nominal size) 86.40 cum 6230.20 538289.28
17 DSR-2014/ P-99/5.22.6
Reinforcement for R.C.C. work including
straightening, cutting, bending, placing in position
and binding all complete
Thermo Mechanically treated bars. 8640.00 kg
68.10 588384.00
Total 25675838.38
Less .95% enhancement on DSR-2014 Except item .12 Rs. 70884.54 243097.66
Total 25432740.72
Less 12% on DSR-2014 Except item no.12 Rs. Rs. 70884.54 3041535.56
Total (A) 22391205.16
Add 1% Q.C and Add 1% Contingencies 447824.10
Total (B) 22839029.26
Add Service Tax @15% on 40% on (B) 1370341.76
Total 24209371.02
Add 1% Labour Cess on (A) 223912.05
Total 24433283.07
Add P.F. @ 13.36% on 25% on (B) 762823.58
Total 25196106.65
Add E.S.I @4.75% on 25% on (B) 271213.47
Total 25467320.12
Add Maintenance charges @3% on Total 764019.60
Total 26231339.72
Add @ 5% Deparmental Charges 1311566.99
Total 27542906.71
Says 27542907.00

(Bhart Ahuja) (Tariq Shafi) (Naresh Rana)


EE(CD)-VI AEE J.E.
DETAIL OF ROAD

Name of Work: Development work in unauthorized colonies.

Sub Head : C/o road and S.W Drain at Gopal Nagar N Block, Reg. No. 108

S.No Name /Nos. of Length width of Type / Thickness in Remarks


Road of Road Road in Proposal Meter
in meter meter of Road

Block A
1 Gali No. 1 97.05 7.26 RMC Road 0.10 to 0.15 CC ROAD
2 Gali No. 2 172.46 7.18 RMC Road 0.10 to 0.15 CC ROAD
3 Gali No. 3 102.94 7.81 RMC Road 0.10 to 0.15 CC ROAD
4 Gali No. 4 79.12 6.01 RMC Road 0.10 to 0.15 CC ROAD
5 Gali No. 5 30.71 5.90 RMC Road 0.10 to 0.15 CC ROAD
6 Gali No. 6 82.33 2.86 RMC Road 0.075 to 0.10 BRICK
7 Gali No. 7 30.82 4.38 RMC Road 0.075 to 0.10 CC ROAD
8 Gali No. 8 32.81 2.80 RMC Road 0.075 to 0.10 KACCHA ROAD
9 Gali No. 9 30.23 5.76 RMC Road 0.10 to 0.15 METTELED ROAD
10 Gali No. 10 44.20 3.15 RMC Road 0.075 to 0.10 BRICK
11 Gali No. 11 44.55 6.12 RMC Road 0.10 to 0.15 CC ROAD
12 Gali No. 12 44.48 3.34 RMC Road 0.075 to 0.10 BRICK
13 Gali No. 13 52.46 6.80 RMC Road 0.10 to 0.15 METTELED ROAD
14 Gali No. 14 54.93 5.26 RMC Road 0.10 to 0.15 METTELED ROAD
15 Gali No. 15 35.38 2.89 RMC Road 0.075 to 0.10 BRICK
16 Gali No. 16 22.20 6.02 RMC Road 0.10 to 0.15 METTELED ROAD
17 Gali No. 17 114.06 6.17 RMC Road 0.10 to 0.15 METTELED ROAD
18 Gali No. 18 67.56 5.94 RMC Road 0.10 to 0.15 METTELED ROAD
19 Gali No. 19 64.19 3.04 RMC Road 0.075 to 0.10 BRICK
20 Gali No. 20 63.83 6.68 RMC Road 0.10 to 0.15 METTELED ROAD
21 Gali No. 21 64.25 3.04 RMC Road 0.075 to 0.10 BRICK
22 Gali No. 22 64.57 6.02 RMC Road 0.10 to 0.15 METTELED ROAD
23 Gali No. 23 69.70 6.18 RMC Road 0.10 to 0.15 METTELED ROAD
24 Gali No. 24 64.91 2.96 RMC Road 0.075 to 0.10 BRICK
25 Gali No. 25 90.98 6.06 RMC Road 0.10 to 0.15 METTELED ROAD
26 Gali No. 26 77.62 2.85 RMC Road 0.075 to 0.10 BRICK
27 Gali No. 27 68.02 4.48 RMC Road 0.075 to 0.10 CC ROAD
28 Gali No. 28 122.10 5.93 RMC Road 0.10 to 0.15 METTELED ROAD
29 Gali No. 29 52.56 4.17 RMC Road 0.075 to 0.10 METTELED ROAD
30 Gali No. 30 42.73 2.90 RMC Road 0.075 to 0.10 BRICK
31 Gali No. 31 34.32 4.35 RMC Road 0.075 to 0.10 METTELED ROAD
32 Gali No. 32 24.52 2.83 RMC Road 0.075 to 0.10 BRICK
33 Gali No. 33 131.47 6.14 RMC Road 0.10 to 0.15 CC ROAD
34 Gali No. 34 39.46 2.93 RMC Road 0.075 to 0.10 KACCHA ROAD
35 Gali No. 35 57.40 6.58 RMC Road 0.10 to 0.15 METTELED ROAD
36 Gali No. 36 71.92 2.97 RMC Road 0.075 to 0.10 BRICK
37 Gali No. 37 84.99 5.98 RMC Road 0.10 to 0.15 METTELED ROAD
38 Gali No. 38 96.14 3.05 RMC Road 0.075 to 0.10 BRICK
39 Gali No. 39 117.30 5.92 RMC Road 0.10 to 0.15 METTELED ROAD

M/s Allied Engineers

.
(Bhart Ahuja) (Tariq Shafi) (Naresh Rana)
EE(CD)-VI AEE J.E.
DSIIDC
Office of EE (CD)-VI

Name of Work: Development work in unauthorized colonies.

Sub Head : C/o road and S.W Drain at Gopal Nagar N Block, Reg. No. 108

Sub: Details of Road (Kachacha & Damage CC Road)


GALI NO. LENGTH R/W AREA
Gali No. 1 1 97.05 ( 7.26 - 1.52 ) = 557.07
Gali No. 2 1 172.46 ( 7.18 - 1.52 ) = 976.12
Gali No. 3 1 102.94 ( 7.81 - 1.52 ) = 647.49
Gali No. 4 1 79.12 ( 6.01 - 1.52 ) = 355.25
Gali No. 5 1 30.71 ( 5.9 - 1.52 ) = 134.51
Gali No. 6 1 82.33 ( 2.86 - 1.38 ) = 121.85
Gali No. 7 1 30.82 ( 4.38 - 1.38 ) = 92.46
Gali No. 8 1 32.81 ( 2.8 - 1.38 ) = 46.59
Gali No. 9 1 30.23 ( 5.76 - 1.52 ) = 128.18
Gali No. 10 1 44.2 ( 3.15 - 1.38 ) = 78.23
Gali No. 11 1 44.55 ( 6.12 - 1.52 ) = 204.93
Gali No. 12 1 44.48 ( 3.34 - 1.38 ) = 87.18
Gali No. 13 1 52.46 ( 6.8 - 1.52 ) = 276.99
Gali No. 14 1 54.93 ( 5.26 - 1.52 ) = 205.44
Gali No. 15 1 35.38 ( 2.89 - 1.38 ) = 53.42
Gali No. 16 1 22.2 ( 6.02 - 1.52 ) = 99.90
Gali No. 17 1 114.06 ( 6.17 - 1.52 ) = 530.38
Gali No. 18 1 67.56 ( 5.94 - 1.52 ) = 298.62
Gali No. 19 1 64.19 ( 3.04 - 1.38 ) = 106.56
Gali No. 20 1 63.83 ( 6.68 - 1.52 ) = 329.36
Gali No. 21 1 64.25 ( 3.04 - 1.38 ) = 106.66
Gali No. 22 1 64.57 ( 6.02 - 1.52 ) = 290.56
Gali No. 23 1 69.7 ( 6.18 - 1.52 ) = 324.80
Gali No. 24 1 64.91 ( 2.96 - 1.38 ) = 102.56
Gali No. 25 1 90.98 ( 6.06 - 1.52 ) = 413.05
Gali No. 26 1 77.62 ( 2.85 - 1.38 ) = 114.10
Gali No. 27 1 68.02 ( 4.48 - 1.38 ) = 210.86
Gali No. 28 1 122.1 ( 5.93 - 1.52 ) = 538.46
Gali No. 29 1 52.56 ( 4.17 - 1.38 ) = 146.64
Gali No. 30 1 42.73 ( 2.9 - 1.38 ) = 64.95
Gali No. 31 1 34.32 ( 4.35 - 1.38 ) = 101.93
Gali No. 32 1 24.52 ( 2.83 - 1.38 ) = 35.55
Gali No. 33 1 131.47 ( 6.14 - 1.52 ) = 607.39
Gali No. 34 1 39.46 ( 2.93 - 1.38 ) = 61.16
Gali No. 35 1 57.4 ( 6.58 - 1.52 ) = 290.44
Gali No. 36 1 71.92 ( 2.97 - 1.38 ) = 114.35
Gali No. 37 1 84.99 ( 5.98 - 1.52 ) = 379.06
Gali No. 38 1 96.14 ( 3.05 - 1.38 ) = 160.55
Gali No. 39 1 117.3 ( 5.92 - 1.52 ) = 516.12

2641.27 9909.73
2641.27 (A) 9909.73 (B)

Total drain length = 2x 2641.27 = 5282.54 (C)


Total drain length of roads above 15'-0"width= 2x 1670.61 = 3341.22 (D)
Total drain length of roads up to 15'-0"width= 2x 970.66 = 1941.32 (E)
Total RMC Area of road above 15'-0" width = = 8104.12 (F)
Total RMC Area of road up to 15'-0" width = = 1805.61 (G)

M/s Allied Engineers

(Bhart Ahuja) (Tariq Shafi) (Naresh Rana)


EE(CD)-VI AEE J.E.
Detail of Measurement
Name of Work: Development work in unauthorized colonies.
Sub Head : C/o road and S.W Drain at Gopal Nagar N Block, Reg. No. 108

S.No. Detail of work No. Measurments Quantities Remarks


length breath Ht./depth
1 Demolishing cement concrete manually / by
mechanical means including disposal of material
within 50 meters lead as per direction of Engineer –in
– charge
(a) 1:4:8 or linear mix.
For Kachacha & Damage CC road 0.25 5282.54 0.60 0.25 198.10
198.10 Cum (a)
2 Demolishing brick work manually/ by mechanical
means including stacking of serviceable material and
disposal of unserviceable material within 50 metres
lead as per direction of Engineer-in-charge.
In cement mortar
0.25 5282.54 0.60 0.30 237.71
237.71 Cum (b)
3 Brick work with common burnt clay F.P.S.(non
modular) bricks of class designation 7.5 in foundation
and plinth in:
(a)Cement mortar 1:6 (1 cement: 6 coarse sand)

Drain work 1.00 5282.54 0.23 0.40 485.99


1.00 3341.22 0.23 0.25 192.12
1.00 1941.32 0.23 0.30 133.95

812.06 Cum

4 12 mm cement plaster of mix


(a) 1:6 (1 cement : 6 coarse sand)

1.00 5282.54 0.40 2113.02


Drain work 1.00 3341.22 0.25 835.31
1.00 1941.32 0.30 582.40

3530.73 Sqm
5 Providing and laying in position cement concrete of
specified grade excluding the cost of centering and
shuttering. All work up to plinth level.
(a) 1:2:4 (1 cement : 2 coarse sand : 4
graded stone aggregate 20 mm
Nominal size)

Drain work 1.00 3341.22 0.23 0.04 30.74


1.00 1941.32 0.23 0.04 17.86
48.60 Cum
(b) 1:5:10 (1 cement : 5 coarse sand : 10 graded
stone aggregate 40mm Nominal size)

Drain work 1.00 3341.22 0.76 0.10 253.93


1.00 1941.32 0.69 0.10 133.95
387.88 Cum

6 Providing and laying 25mm thick with cement


concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded
stone aggregate 12.5mm nominal size) on the top of
S.W. drain walls including centering and shuttering
etc. complete.

Drain work 1.00 5282.54 0.23 1214.98


1214.98 Sqm
7 Neat cement punning.

Drain work 1.00 5282.54 -- 0.40 2113.02


1.00 3341.22 0.25 835.31
1.00 1941.32 0.30 582.40

for bed 1.00 3341.22 0.23 768.48


1.00 1941.32 0.23 446.50
4745.71 Sqm
8 Supply of earth by mechanical transport i/c Rayality,
excavation, loading, unloading and banking the same
in layer not exceeding 20 cm in depth, breaking clods
watering, rolling each layer with ½ tonne roller or
wooden or steel rammers, and rolling every 3rd and
top-most layer with power roller of minimum 8 tonnes
and dressing up with proper camber for roads
inculding filling up ground depressions with 30 Km
lead and lift upto 1.5m : (Rolling by means of
compactor).

Area as per B 1.00 9909.73 0.30 2972.92


Deduct Qty vide Item no. 1(a) -198.10
Deduct Qty vide Item no. 2 (a) -237.71
2537.11 Cum
9 Providing & laying in position ready mixed M-10 grade
plain cement concrete ( with 20 mm nominal size
stone aggregate ), maufactured in fully automatic
batching plant and transported to site of work in
transit mixer for all leads, having continuous agitated
mixer: including the cost of pumping of R.M.C from
transit mixer to site of laying, finishing, curing,
admixtures in recommended proportions as per IS :
9103 to accerlerate / retard setting of concrete,
improve workability without impairing strength and
durabilty ; exlcluding the cost of centering &
shuttering ; complete as per direction of the Engineer
- in- charge. All works up to plinth level ( minimum
cement content considered @ 220kg/cum)

Qty as per detail (F) 1.00 8104.12 -- 0.100 810.41 (P)


Qty as per detail (G) 1.00 1805.61 -- 0.075 135.42 (Q)
945.83 Cum
10 Providing and laying ready mix cement concrete of M-
30 grade, in roads, using cement content as per
design mix, using coarse sand and graded stone
aggregate of 20 mm nominal size in appropriate
proportions as per approved & specified design
criteria including cost of admixtures in recommended
proportions as per IS: 9103 to accelerate /retard
setting of concrete, improve workability without
impairing strength and durability including pumping
of R.M.C from transit mixer to site/,laying at site,
spreading and compacting, mechanically by using
needle and surface vibrators, levelling to required
slope/ camber, finishing with required texture,
brooming with wire brush curing excluding the cost of
centering, shuttering complete all as per direction of
Engineer-incharge ( minimum Cement content
required in M-30 is @ 340 kg/cum.). Cement concrete
manufactured in approved RMC plant i/c
transportation to site in transit mixer.

Qty as per detail (F) 1.00 8104.12 -- 0.150 1215.62 (R)


Qty as per detail (G) 1.00 1805.61 -- 0.100 180.56 (S)
Top of Drain 1.00 3341.22 0.23 0.150 115.27 (T)
1.00 1941.32 0.23 0.100 44.65
1556.10 Cum
11 Deduct for not rolling with power roller of minimum 8
tonnes for banking excavated earth in layers not
exceeding 20 cm in depth.
Qty as per G 1.00 1805.61 0.30 541.68
541.68 Cum
12 Providing and laying P.V.C sheet 125 micron thick on
lean cement concrete surface without creases
whereever overlap is necessary, the same at least
should be 300mm. The surface of lean cement
concrete shall be swept clean of all extrenous
material before pacing & fixing with plastic nails.

Qty as per detail (B) 9909.73


9909.73 Sqm
13 Deduct for not laying the concrete by using the pump,
piping work, accessories , power charges , loading /
unloading & other misc. operational charges etc. , as
per direction of Engineer –in –charge..
Qty as per P 1.00 810.41
Qty as per R 1.00 1215.62
Qty as per T 1.00 115.27
2141.30 Cum
14 Providing and fixing in position pre-moulded joint filler
in expansion joints.

Block A
Gali No. 1 4 5.74 1.20 15.00 413.28
Gali No. 2 6 5.66 1.20 15.00 611.28
Gali No. 3 4 6.29 1.20 15.00 452.88
Gali No. 4 3 4.49 1.20 15.00 242.46
Gali No. 5 1 4.38 1.20 15.00 78.84
Gali No. 6 3 1.48 1.20 10.00 53.28
Gali No. 7 1 3.00 1.20 10.00 36.00
Gali No. 8 1 1.42 1.20 10.00 17.04
Gali No. 9 1 4.24 1.20 15.00 76.32
Gali No. 10 2 1.77 1.20 10.00 42.48
Gali No. 11 2 4.60 1.20 15.00 165.60
Gali No. 12 2 1.96 1.20 10.00 47.04
Gali No. 13 2 5.28 1.20 15.00 190.08
Gali No. 14 2 3.74 1.20 15.00 134.64
Gali No. 15 1 1.51 1.20 10.00 18.12
Gali No. 16 1 4.50 1.20 15.00 81.00
Gali No. 17 4 4.65 1.20 15.00 334.80
Gali No. 18 3 4.42 1.20 15.00 238.68
Gali No. 19 2 1.66 1.20 10.00 39.84
Gali No. 20 2 5.16 1.20 15.00 185.76
Gali No. 21 2 1.66 1.20 15.00 59.76
Gali No. 22 2 4.50 1.20 15.00 162.00
Gali No. 23 3 4.66 1.20 15.00 251.64
Gali No. 24 2 1.58 1.20 10.00 37.92
Gali No. 25 3 4.54 1.20 15.00 245.16
Gali No. 26 3 1.47 1.20 10.00 52.92
Gali No. 27 3 3.10 1.20 10.00 111.60
Gali No. 28 5 4.41 1.20 15.00 396.90
Gali No. 29 2 2.79 1.20 10.00 66.96
Gali No. 30 2 1.52 1.20 10.00 36.48
Gali No. 31 1 2.97 1.20 10.00 35.64
Gali No. 32 1 1.45 1.20 10.00 17.40
Gali No. 33 5 4.62 1.20 15.00 415.80
Gali No. 34 1 1.55 1.20 10.00 18.60
Gali No. 35 2 5.06 1.20 15.00 182.16
Gali No. 36 3 1.59 1.20 10.00 57.24
Gali No. 37 3 4.46 1.20 15.00 240.84
Gali No. 38 4 1.67 1.20 10.00 80.16
Gali No. 39 4 4.40 1.20 15.00 316.80

Per cm
` 6245.40
Breadth
Per cm
depth
15 Centering and shuttering including strutting, propping
etc. and removal of form for :
(a) Foundations, footings, bases of columns, etc. for
mass concrete
For RCC Culvert 51.00 4.00 0.30 61.20
102.00 1.20 0.20 24.48
102.00 4.00 0.20 81.60

RMC on drain top 1.00 8104.12 0.15 1215.62


1.00 1805.61 0.10 180.56
1563.46 Sqm
16 Providing and laying in position specified grade of
reinforced cement concrete excluding the cost of
centering, shuttering, finishing and reinforcement –
All work up to plinth level
For RCC Culvert 90.00 4.00 1.20 0.20 86.40 Cum
17 Reinforcement for R.C.C. work including
straightening, cutting, bending, placing in position
and binding all complete
For RCC Culvert 86.40 @ 100.00 Kg/Cum 8640.00 Kg

M/s Allied Engineers

(Bhart Ahuja) (Tariq Shafi) (Naresh Rana)


EE(CD)-VI AEE J.E.
HISTORY SHEET

STATE/ UT : DELHI
DEPARTMENT : DELHI STATE INDUSTRIAL & INFRASTRUCTURE DEVELOPMENT
CORPORATION LTD.
CIRCLE : Suprintendent Engineer (UC)
DIVISION : Executive Engineer (CD-XXIV)
NAME OF WORK: Development works in un-authorized colonies.
S.H : C/o Road and S.W Drain at Gopal Nagar N Block

Reg. No. : 108


Cost of work : Rs. 27542907.00
Estimate framed: Er. Bharat Ahuja, E.E. CD-XXIV.
History : As per latest policy, the A/A & E/S of all development work of unauthorized colonies shall be accorded
by the MD/DSIIDC. No further approval /Sanction shall be accorded by U.D.Deptt; Govt. of NCT Delhi.
Hence, there is no further need to send the estimates to U.D.Deptt. The estimate of above said colony
has been prepared as per the directions mentioned vide F-535/UC/UD/2011/5627-35 dt 7.6.2011 &
DSIIDC/Dir(W)/2011/94 dt 29.06.2011.

Present Status of Colony:


(1) Water line laid or not :- Water lines not Laid.
(2) Sewer line or not :- Sewer lines not Laid
(3) Electrification :- Electricity facility available.
Design & The provision for 10cm to 15 cm thick ready mixed concrete M-30 with under 7.5 cm to 10cm thick
Scope: layer of M-10 is taken. The provision of S.W. drain with rectangular section in brick work over base of
CC 1:5:10 and 4cm thick cement concrete in bed & 2.5cm thick cement concrete at the top of drain's
wall with cement plaster in 1:6 i/c neat cement punning is taken.
Specification :
The work will be executed as per guide line dt: 22.10.09 issued by the then CE (O& M) and CPWD
specification 2009 vol-I & II with upto date correction slip.

Rates : Based on DSR 2014

Method : By Contract

T&P : Shall be arranged by the Contractor

W.C : To be met out from 1% contingenceies

Land : Available

Time : 6 months
M/s Allied Engineers

(Bhart Ahuja) (Tariq Shafi) (Naresh Rana)


EE(CD)-VI AEE J.E.