0% found this document useful (0 votes)
2 views

Table of contenrt

The document outlines a project proposal including initiation, planning, and feasibility analysis. It describes the existing system's problems and presents a proposed application with functional and non-functional requirements. Additionally, it includes system modeling using object-oriented paradigms.

Uploaded by

abdatadalacha5
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2 views

Table of contenrt

The document outlines a project proposal including initiation, planning, and feasibility analysis. It describes the existing system's problems and presents a proposed application with functional and non-functional requirements. Additionally, it includes system modeling using object-oriented paradigms.

Uploaded by

abdatadalacha5
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Contents

CHAPTER ONE.--------------------------------------------------------------------------------------------2

1 Project Initiation and Planning-------------------------------------------------------------------------2


1.1 Background Information------------------------------------------------------------------------------2
1.2 Statement of the problem-----------------------------------------------------------------------------2
1.3 Objective of the project-------------------------------------------------------------------------------3
1.3.1 General Objective---------------------------------------------------------------------------------3
1.3.2 Specific Objective--------------------------------------------------------------------------------4
1.4 Scope and limitation of the project------------------------------------------------------------------4
1.4.1 Scope of the system-------------------------------------------------------------------------------4
1.4.2 Limitations of the system------------------------------------------------------------------------5
1.5 Methodology and Software used---------------------------------------------------------------------5
1.5.1 Systems analysis and design methodology----------------------------------------------------5
1.5.2 Data Collection Methodology-------------------------------------------------------------------6
1.5.3 Development environment, programming tools and resource required-------------------6
1.6 Feasibility Analysis-----------------------------------------------------------------------------------7
1.6.1 Economic feasibility------------------------------------------------------------------------------7
1.6.2 Technical feasibility------------------------------------------------------------------------------8
1.6.3 Operational Feasibility---------------------------------------------------------------------------9
1.6.4 Schedule Feasibility------------------------------------------------------------------------------9
1.7 Beneficiaries of the Project-------------------------------------------------------------------------10
1.8 Project Management Plan---------------------------------------------------------------------------10
1.8.1 Scope Management Plan-----------------------------------------------------------------------10
1.8.2Time Management Plan-------------------------------------------------------------------------15
1.8.3 Cost Management Plan------------------------------------------------------------------------15
1.8.4 Quality Management Plan----------------------------------------------------------------------16
1.8.5 Communication Management Plan----------------------------------------------------------16
1.8.6 Assessing risk------------------------------------------------------------------------------------17
1.9 Project Organization---------------------------------------------------------------------------------18
1.9.1 Team organization-------------------------------------------------------------------------------18

CHAPTER TWO-------------------------------------------------------------------------------------------19

2. Description of the Existing System------------------------------------------------------------------19


2.1 Introduction of Existing System--------------------------------------------------------------------19
2.2 Overview of Existing System-----------------------------------------------------------------------19
2.3 Problem of the Existing System--------------------------------------------------------------------19
2.4 Practices to be preserved from the Current System----------------------------------------------20
2.5 Preferred Solution------------------------------------------------------------------------------------20
2.6 Business Rules----------------------------------------------------------------------------------------20
2.7 Players in the existing system----------------------------------------------------------------------21

CHAPTER THREE---------------------------------------------------------------------------------------22

3. Proposed Application-----------------------------------------------------------------------------------12
3.1 Overview of the Proposed Application------------------------------------------------------------22
3.2 Functional Requirements----------------------------------------------------------------------------22
3.2.1 Essential Use Case Modeling------------------------------------------------------------------22
3.2.2 Essential User Interface Flow Diagram------------------------------------------------------25
3.2.3 Domain Modeling-------------------------------------------------------------------------------28
3.3 Non Functional Requirements----------------------------------------------------------------------29
3.3.1 Performances-------------------------------------------------------------------------------------29
3.3.2 Security Issues-----------------------------------------------------------------------------------29

CHAPTER FOUR-----------------------------------------------------------------------------------------30

4. System Modeling using OO (Object Oriented) Paradigm--------------------------------------30


4.1 Use Case Diagram for New System---------------------------------------------------------------30
4.2 sequence Diagram of proposed system------------------------------------------------------------35
4.3 Activity Diagram-------------------------------------------------------------------------------------47

You might also like