0% found this document useful (0 votes)
17 views

Zentia Ceiling Installation Manual

This installation guide provides detailed instructions for installing Prelude 24 and Prelude Sixty2 ceiling systems, including required tools, room layout, and step-by-step procedures for perimeter trim, main runners, cross tees, and tile installation. It emphasizes the importance of adhering to specific measurements and fixing centers based on tile weight and national codes. Contact information for further assistance is also provided.

Uploaded by

tellpatryan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views

Zentia Ceiling Installation Manual

This installation guide provides detailed instructions for installing Prelude 24 and Prelude Sixty2 ceiling systems, including required tools, room layout, and step-by-step procedures for perimeter trim, main runners, cross tees, and tile installation. It emphasizes the importance of adhering to specific measurements and fixing centers based on tile weight and national codes. Contact information for further assistance is also provided.

Uploaded by

tellpatryan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 31

Installation Guide

Prelude 24 / Prelude Sixty2


Mineral Board / Tegular / Vector
Summary

1 Tools required

2 Room layout

3 Perimeter trim installation

4 Top fixings & hangers

5 Main Runner installation

6 Cross Tee installation

7 Full size tile installation

8 Cut tile installation


1 Tools required
General tools 1.1
1.2 Grid tools 1.3 Tile tools
2 Room Layout
Planning the layout 2.1

≤ 300 mm ≤ 300 mm ≤ 300 mm ≤ 300 mm ≥ 300 mm ≥ 300 mm ≥ 300 mm ≥ 300 mm

A A
A A
(l) 4500 mm

(l) 4500 mm

(l) 4500 mm

(l) 4500 mm
X No X No Yes Yes

450 mm 450 mm
150 mm 150 mm

A : 600 x 600 mm A : 600 x 600 mm


4500 (l) / 600 = 600 x 7 + 150 x 2 4500 (l) / 600 = 600 x 6 + 450 x 2
2.2 First hanger location 2.3 Direction of the Main Runners

No.1
Max A

max max
600 mm 600 mm

1200 mm
1200 mm

1200 mm
*For alternative hanger and main runner spacing, please contact ITS on 0800 371 849
3 Perimeter trim installation
Angle trim installation 3.1

1 2 3

300
– 45
0mm

*Fixing centres may vary with tile weight and national cde of practice, please contact ITS on 0800 371 849
Shadowline installation 3.2

1 2 3

*Fixing centres may vary with tile weight and national code of practice, please contact ITS on 0800 371 849
Flexible perimeter 3.3
trim installation

1 2 3

*Tighter radii will require smaller fixing centres. First fixings max. 50mm from ends of trim
4 Top fixings & hangers
Prelude 24 TLS / XL2 installation 4.1

1200mm
1200 – 1900mm*

*Hanger and Main Runner centres can vary depending on the tile weight and national code of practice. Please contact ITS on 0800 371 849
Prelude Sixty2 installation 4.2

*Hanger and Main Runner centres can vary depending on the tile weight and national code of practice. Please contact ITS on 0800 371 849
5 Main Runner installation
First Main Runner location 5.1

String lines

1
Main Runner alignment 5.2

X No Yes

X No

Yes
Joining Main Runners 5.3

1 Prelude 24 TLS / XL2

2 Prelude Sixty2
6 Cross Tee installation
TLS 6.1

1 2
X - 5mm

3 4
XL2 6.2

1 2
X - 5mm

3 4
7 Full size tile installation
Board / Tegular installation 7.1
Minimum void of 150mm
Vector installation 7.2

Minimum void of 85mm


A B

C D

1 2 3

A B A B

*All the tiles must be installed in the same direction


8 Cut tile installation
Board 8.1

X + 4mm

1 3

2 1

X
Tegular with angle trim 8.2

2 3

m
9m

Y + 16mm

1 4

Y
Tegular with shadowline 8.3

Z + 7mm

1 3

Z
Vector with angle trim 8.4

Use Vector Border Clips for corner tiles

A B C D

1 2 3

C D
2mm

Y Y + 13mm

*Spacer bars are recommended at the perimeters of all installations to maintain proper tile alignment
Vector with shadowline 8.5

A B C D
Where cut tiles are resting on the trim,
border wedges may be necessary to
maintain correct alignment

1 2 3

A B

Z Z + 3mm

*Spacer bars are recommended at the perimeters of all installations to maintain proper tile alignment

You might also like