Project Schedule
Project Schedule
Project Review – 1:
Initiation of the project
1. 28.02.2025 Finalization of Domain and Technology
Problem definition objectives
Abstract & Literature survey Submission.
Project Review – 2:
Material, Tools and software requirements
specification.
2. 14.03.2025 Block diagram of the proposed project.
Module hardware implementation.
Algorithm implementation.
Module design.
Project Review – 3:
Architecture / Flowcharts.
3. 16.04.2024
Integration of designed modules.
Verification of simulation result.
Project Review – 4:
4. 02.05.2025 Design of test case and output Screen shots.
Submission of rough copy of the project.
Final Review:
5. 22.05.2025
Submission of the final copy.