0% found this document useful (0 votes)
40 views2 pages

General Equipment Layout

The document contains detailed specifications and drawings for a substation layout, including dimensions, equipment placements, and construction notes. It outlines various components such as transformers, grounding systems, and safety features, along with specific instructions for future expansions and interlocks. Additionally, it emphasizes the importance of referring to civil drawings for further details on structural elements.

Uploaded by

irasool261
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
40 views2 pages

General Equipment Layout

The document contains detailed specifications and drawings for a substation layout, including dimensions, equipment placements, and construction notes. It outlines various components such as transformers, grounding systems, and safety features, along with specific instructions for future expansions and interlocks. Additionally, it emphasizes the importance of referring to civil drawings for further details on structural elements.

Uploaded by

irasool261
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

01 CA 1615440 8866 P 4400021322 1-2431001.

01
LEGEND NOTES
01 of 02

REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.
DN - DOWN
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE

NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EL - ELEVATION
NOTED.
PN TN FFL - FINISHED FLOOR LEVEL
COR. # 02 2. EQUIPMENT SHOWN IN DOTTED LINE ARE FOR FUTURE
GT1, 2 & 3 - 100MVA POWER TRANSFORMER
3° EXPANSION AND NOT IN CONTRACTOR SCOPE OF WORK.
.653 (132/33kV, 80/100MVA, Dyn1, 60Hz)
24 N 3. THIS DRAWING SHALL BE REFERRED ONLY FOR
SUBSTATION PLOT
CSS - CABLE SUPPORT STRUCTURE
COORDINATES EQUIPMENT DIMENSIONS AND ITS CLEARANCES FOR
RC OPEN
DRAIN CHANNEL GRT - GROUNDING TRANSFORMER FURTHER DETAILS LIKE COLUMN, WALL, STAIRCASE,
CORNER NORTHINGS EASTINGS FOR GRAVEL AREA
GIB - GAS INSULATED BUS DOOR, etc, REFER TO THE RESPECTIVE CIVIL DRAWING.
L
COR. #1 2945538.076 371117.335 WAL GIS - 132KV GIS (132kV, 40KA (1 sec), 2000A)
UNDA
RY 4. IN STATCOM AREA EACH GATE SHALL BE PROVIDED
BO
T WITH AN ELECTRICAL AND MECHANICAL INTERLOCK WHICH

150
CAS
COR. #2 2945601.455 371194.691
V O/G PRE LCC - LOCAL CONTROL CUBICLE

6200
k COULD BE RELEASED AFTER 10 MINUTES OF ITS INITIATION
132 LES

0
RNAL R, Y, B - PHASE OF SUPPLY
EXTE
COR. #3 2945510.685 371236.665
CAB COM
AREA FROM STATCOM PANEL.
TELE CSE - CABLE CEILING END
COR. #4 2945447.312 371159.310 5. PANELS SHOWN IN CONTROL ROOM & TELECOM ROOM ARE
SF6/A.B - SF6 TO AIR BUSING

150

6120
STEEL TENTATIVE. ACTUAL PANELS WILL BE SHOWN IN INDIVIDUAL
/G 004
V O 100 FENCE 8374 AGWT - ABOVE GROUND WATER TANK
k ROOMS LAYOUT.

0
3
3 LES
CAB S.A - SURGE ARRESTOR
6. HVAC DUCT SHALL BE ENTERED THROUGH THE ROOF.

MAIN GATE
V O/G RMU - RING MAIN UNIT
33k 7. MINIMUM CLEARANCE IN AIR FOR 132kV OUTDOOR CONNECTIONS
LES
CAB
NER - NEUTRAL EARTHING RESISTER AS PER SEC STANDARD TES-P-119.08.REV.01 SHALL BE
OAD
E R T AREA
ASPHAL
WID ACSR - ALUMINUM CONDUCTOR STEEL REINFORCE AS FOLLOW:
15M
P-P - PHASE TO PHASE
CLEARENCE FOR 132kV:
ALL SF6 SA GT PERSONAL P-G - PHASE TO GROUND
Y W GIB
C C C C
UNDAR L L L L GATE PHASE TO PHASE 1730mm
O 01 02 04 05 07 09 11 12 14 15
T B MH - MANHOLE
RC OPEN DRAIN CHANNEL CAS
PRE 37540 3130 1940 2300 2685 PHASE TO GROUND 1575mm
FOR GRAVEL AREA

REMOVABLE PRECAST BOUNDARY WALL


GTR-1 BEF - EXHAUST FAN
4855 2890 8910 4660 3220 4600 4853 2972 8052 H3 GROUND CLEARENCE 4020mm
COR. # 01 BUSHING C RC OPEN
L H2 BSF - SUPPLY FAN

1820
580 BSF

2445
PLATFORM
BSF 2U 2V 2W CSS DRAIN CHANNEL 8. STEEL CAGE LADDER TO REACH ROOF OF STAIR -1 & 2
ASPHALT AREA
3.02 3.01
01 FOR GRAVEL AREA PN - PLANT NORTH
SHALL BE PROVIDED.

4950
D

2100
H1
A
SB-RD

1717
1M WIDE WALKWAY
H0
O TN - TRUE NORTH

1W

PROPOSED 6.0M
RAIL CENTER
EL E
R

WIDE PARKING
9. STAIR CASE-1 SHALL PROVIDE ACCESS FROM CABLE BASEMENT TO

NN BL

2N
A

TU CA
SB-RD
E SWGR - SWICTHGEAR ROOM LOWER ROOF & STEEL CAGE LADDER FROM LOWER TO UPPER ROOF.
ID 1750 1080

kV
GRAVEL 01

1M WIDE WALKWAY

3u1 3w2
C
STAIRCASE-01

4190
W

33
33kV, 2500A. 60Hz, 25kA/3sec

Y
BSF CLEAN AGENT
L GT

2050
UP DN 600

1V
1717
CYLINDER ROOM
M 10. STAIR CASE-2 PROVIDE ACCESS FROM CABLE BASEMENT TO

6000
3.03 C
AREA
L

6
(7605x4400)
SPT - SUMP PUMP PIT (OIL PIT)

1200
F
FO.PANEL
GIS
FFL+0.00
GROUND FLOOR.

7605

4950
-
12945

1N
CDP-01

9900
TRANSFERRING WATER/OIL

7605

GT-1
1U
8395 600

FUT.
B 2500 TTP -

D07
FROM PIT TO MOBILE TANKER 11. THE ENTIRE SUBSTATION SHALL HAVE BASEMENT UNDERNEATH
800 2875

2674 6752 1489


PLATFORM PLATFORM
(TYP.)

SOG
SB-RD
EXCEPT FOR CLEAN AGENT CYLINDER ROOMS & TOILET.

SPT-1
4400 1500 1500 6000 CDP - CHEMICAL DRAIN PIT

1600
D05
D

1200 1200 1200 1200 1500 1270 900


3140

FUT.

B
D07
SMH - SOAK MAN HOLE 12. LOCATION OF ABOVE GROUND WATER STORAGE TANK WITH

Y
R

8437
600 1500

132kV O/G
2209 SB-SP

3500
TTP-1

1600
D03

SPARE
(TYP.) PUMP, SEPTIC TANK, SEEPAGE PIT AND MANHOLES, CONDENSATE

2035
FACP FECP

T301, T302 - STATION SERVICE TRANSFORMER

D05
CONTROL ROOM

1055

300

CABLES
B
1800 1800 2015

Y
E 8065

R
SP-02 01 (22000x16710)
FFL+0.00 F DRAIN PITS ARE TENTATIVE AND SHALL BE FINALIZED IN THE
-

1600
SOG - SLAB ON GRADE

D01
3352

9099A GT-1
5393

D03
2N
RESPECTIVE DESIGN DRAWINGS
H27 F
150

5927
1800
SDP-02
2W 2V 2U LV

8300
22000
01

BATTERY PANEL
6622
SB-RD
H25 F

3000
PRINTER

D01
F
150 - SPLASH BLOCK/ROOF DRAIN

B
600

3500
H23

1560 900

Y
(33500X8065)+(38180X10625)

2100
13. THE LCD DISPLAY IN CONTROL ROOM SHALL BE FIXED

R
D130
T302
1500 1263 1500 1263 1500 1721

H21
16710

100
(TYP.) SB-SP

1M WIDE WALKWAY
��

11225(CRANE SPANE)
- (SUSPENDED) FROM THE CEILING IN FRONT OF WORK STATION.
H19
GTR-2 (FUTURE) SPLASH BLOCK/SUBMERSIBLE PUMP

33kV SWGR ROOM

600
1500
HV

GT-01

REMOVABLE PRECAST BOUNDARY WALL


H17
1800 800 1800 1600 1800 1600 1800 1600 1800

B/C-A
D130
G SB-SP
1W
H15
CY
GT-2

1/ 3+ 1/ 1+

1/ 4+ 1/ 2+
FFL+0.00

.2
1V 1U SE BER

N
1

F 1
.
F

0
S .

+4 2

2
0

Y
M M R I

- EQUIPMENT FRONT

L
R

7
C(

S
33kV CABLE

M
H13

+4

2445
F
3000 3047 2540

R
CZ

6
A
CSS

U
R R

+
FUTURE

1600
+
) +

-
RMU-02

D220
CY
2U 2V 2W

2
SE BER

.1
. .

.1 F 2

150

2050
I
TUNNEL
.
H11

+4 2

R2
0

S
B,Y,R M M

C
M

7
C

L
5069

V
NC

R
+4

F
Z) R R A

01

+
+

+
4800
+

BUS SECTION
=S

.2
H09

4950
/R +

/R +
A .

.2
+S S

R1 05

R1 06
S

2100
I
- FUTURE

+4 2

C
M M

5
M
CP

V
V

0
A
+4
SB-RD 1 U

R
132kV GIS ROOM

+
+

3410
H07

D220
=S

/R +

/R +

.2
A

ACDB
1

.3
1
+S S

1050 1050 800


.
R1 7

R1 8
1170 3475 0 0 .
F F (33100x12945)

1W
5
+4 2

S
F

C
T

MCCB
0

RAIL CENTER
CP

L
M

V
E

2100
+4
V
H05 2 F

A
M

+
U

+
+

D230
+
FFL+0.00

B
=S
C

12800 150 150


-

/R + /R +

/R + /R +

2N
1

2A
A
- CENTER LINE
RMU-01

.2
SB-RD
0
+S S

R1 1 R1 9

R1 1 R1 10

8000
0

.1
2

.
P /

T
H03

1A
M
M

3
CP

1717
C
+4
+4
S

0
3 BB

CH.1
+
+

+
=S

21850
3
A 1

2B
H01 2

.3
+S S
0 2

9600

.
1750 1080

.
2

2
M /

T
3
LA

1B
4M

0
C
+4
1 +
1200

R
BUS SEC.

+B

900 1500 1200 1570 1200 1200 1200 1200


H

3u1 3w2
+
+
HBR1
R,Y,B =SAS
C
LGT

Y
+ / +

+ / +
RING CORE
3 4

H
.4
2

CH.2
1.
C
F .0
R1 1 R1 1

R1 1 R1 1
R2

R2
+

B
SLB

4M

4M
13000

B/C-B
0
H710

B
C
+ +

D230
1
F

R
M
1U 1V 1W

+
- FUTURE SPACE ONLY
+

1V
33100
+
+

1717
=
CT FOR AMI SAS

12800
5 6

.1

.2

360
.A
+ R

R2

R2
H02 SLA 1

6M WIDE ROAD
V

C
M

M
/ /

0
2

3048
+4

+4

B
A

R
HV

1M WIDE WALKWAY
4883

+ +
6M WIDE ROAD

+
2400

=
SAS

1600
.1
H04

+
.

2
R1 17

R1 18
+

4950
2
R2

R2

D02
SLB
1721

R
V

0
M

B
4 / 4 /

F
2

1N
R
43435

2600
F
183
+
T301

A
+

+
+

MAIN DCDB
F

9900
H06 =SAS
6622

F .2
- PRECAST WALL

/R +

E

R1 19

R1 20
B

1U
600
+ F

2
.
S
+4 2

2
FCP

0
C
M
R
C

M
A1 4 /

25M WIDE ROAD


H08 B

9099B GT-2
GRAVEL

+
+

+
+

D02
600

=SAS R

/R +

/R +
GT-02

1A LO -B LO
R1 21

.1
+

R1 22
FCP F

+ 2

2
H10

2B

1600
BB /

M
B1

1600
4 4

0
1526

(TYP.)

R
+

D04
1

SOG
+
- CMU WALL

100005
ELP
=S

360
H12 A R

/R +

/R +
LV 2U 2V 2W +S S

.2
F

R1 23

R1 24

D04
+ 2

2A
F

4
F F

SPT-2
AP BB /

AREA

M
4 4

0
+
1 R

+
2N

+
H14 -
J =S
A

2 + 2 +

2 + 2 +
+S S

.1
/R 27 1/R 25

/R 28 1/R 26

4800
1600

100
6622

+ F

F
3600

B
AP

F
4 4

0
H16

1200 1600

Y
2 R
2400

R
+
SP-01 =S

OLP
R

R
- CAGE LADDER
A
1500

1600

SPARE GT-3
.2
+S S F

D06
+ F

132kV O/G
H18

6
M M

600

D06
AP

DCP-02
F
0

4600
R1 4

R1 4
3 R

3500
TTP-2
E Y
H20

1
N IT
100

.2
.
1800

R
T

8
SDP-01

A U

10
100
C C

E BI

0
(TYP.)

CABLES
R
R
S
6385

D08
+

300
1 F
H22

PP

.2
C BI

.
C

10
F
C

8
1200

BUS SEC.

SB-SP
T .

1600
A

R
HBR2 N
V

F
+

- PVC SLEEVES

D08
+

B
33500

Y
R
H720

FUT.
2588

2153
C

D10
L

2600
SB-SP H24
33kV O/G

GIS
150 150 150
3135

B
01 - REVISION MARK/NUMBER
CABLES

H26 X

2315
4400

Y
R
1600 1600 1600 1600

3500
3600

H28 3984 6752 2209


F

BB AXIS

11382
H30 HVAC CP-03 HVAC CP-02 HVAC CP-01
ILP DCP-01

M SB-RD H32 TTP-3 GTR-3

4430
1000

FUT.
150 DC-DC DC-DC

D10
DCDB-2 DCDB-1

SPT-3
12985 3585 H3
CONV-1 CONV-2
3185

H34 F
Y Y
600

1800

F
GT-03

F C
H2
3035

2050
H36 LAN MPLS-TP MDF/ MDF/ MDF/

1800 33kV CABLE


OFFICE ROOM
PULLING

REMOVABLE PRECAST BOUNDARY WALL


DDF-02 DDF-01
PANELDVM DDF GIS

2445
H38 F
(3585x3035) TUNNEL
2U 2V 2W CSS
COMMUNI. ROOM SB-RD
H40 F
DATA
MCP (12985x3035)
FFL+0.00
- HOOK 01

4950
CABINET/
OFMR FFL+0.00

2100
KEY PLAN
H42
N - H1
IPMG
4200

H44
H0
FO.PANEL

1W
1M WIDE WALKWAY

RAIL CENTER
RC OPEN
1M WIDE WALKWAY

7587 H46 CABLE TRAY OPENING FOR

2N
DRAIN CHANNEL H48 F
HVAC EQUIPMENT ON ROOF

1717
AGWT
CDP-02
FOR GRAVEL AREA H50 F
1750 1080 PN TN

3u1 3w2
GRAVEL C
REFERENCE DRAWINGS

10625

Y
LGT
33kV SWGR ROOM
8045

3500 1645 2100 °


33

1717

1V
(33500X8065)+(38180X10625)
1500 WTP FFL+0.00
-
24
.65
N

AREA 01
33kV O/G

DRAWING TITLE DRAWING NO.

4950
R

1N
5665

9900
CABLES

0
10

1U
R2

GT-3
38180 G
P- DRAWING CONTROL SHEET CE-1615254
N AL
OPE L RN AREA
TE
RC NNE A EX OM
A
CH ARE L C
LE

00
N AL
AI L W
TE
DR RAVE Y

62
G R
74
A

E
D
FOR N

GAT
SOG
U
B
O 83
T
S
A

N
C

I
E
R L

MA
SB-SP
P
EE
ST CE
N
FE

AL

20
ON
RS E

15

61
PE GAT
G EL EA

LL
0
/ EN NN

R
R
OP CHA L A

0
O

WA
RC N E
V ES DR
AI AV
k GR

ARY
2 BL R

PTS-23CN1096
FO

SCOPE OF WORK & TECHNICAL SPECIFICATIONS


13 CA EA

ND
AR

6. G
E
1

0M
R-

N
BOU
01

ED KI
T GT
01

SB-SP

R
AL

45

PA
T
P
7790
PH

CAS
H3

24
FUTURE 10M WIDE ROAD

POS
DE
AS

T
H2

PRE

PROI
GT S
CS

W
C
L

E
SA H1

BL
C H0 80
L 85

50
04 SF
6
10

OVA
26

E
00 C 00

49
L 50
2610

00
B
GI
10 60

REM
23 17

00
CONCRETE LINE
C
L

15

R
40 C
NG L

NTE
21
19
2U

G
GT

0
I
C
2V2

SH
00

S
52 BU L

0
W

O/
G 30 80 15

132 BLE

25
CE
15
31

-M
/
O
S

L
2N

kV
RAI
TOILET

1W

50
14

WORKSHOP
V E

CA
88 k L
3 B

49
72
SB-RD

00
3 A

3w2
66 C 29
F
2300

BS

99
01 0

171
12

3u
1M WIDE WALKWAY
3.

B
60 .)

STAIRCASE-02
C

1V
53
PL

CABLE
-RD

-1
SB P
AN
48

885 6000 8587


TY

1N
(
T

PROPOSED LAYOUT OF SUBSTATION (REV.00) (TENDER) CT-924803

GT
NO

LL
TUNNE

1
.

T-
11

10

1U
)

WA
(3200x2300)
9425 L GT 2925 6000 9340

33kV
00 RE

00
17

SP
(4700x2300)

0
46 TU

17
RM

30
09
FU
FO

RY
G

35
R
AT
/ PL (

NDA
O 2
20 R-

50
1
S P-
32 TT GT

20
V E

-M
01

BOU
DN
k L

45
07

SOG
0
3 B 250
60

00
3 A
F
BS

24
Y
46
WA
C

11100

ST
02
PRECAST BOUNDARY WALL

LK

FFL+0.00
0 3. WA 0

35
54

FFL=-0.050
D
60 .
-R

CA
DE S
37
WI 5 SB
94 89 ) CS

37
1M 12 14 P 0
TY 60 .

PRE
-
95 (

84
C
L 83 )P

0
P
TY
S
52
80

0
GI -S
05
D 10 67 (

182

600
0 SB

50
A 89
01 60
10

LE
E-
O

F
AS

B
04 09

Y
1200
R RC

R
22

AB
AI

49
ST DN 50
17

FO

00
02

OV
.
UP

PANE
IDE

TER
B

Y
L
05
W 74

D0 .

REM
21

G
26 T
-2
T
90

T
2U

EN G

132 BLES
0 C

FU
2V2

AG OOM

76
GT RE
-RD

O/
MH.1
28 L
W

CEN
58 SB

6500 5850 600


R
N 22
15

AD
EA ER
TU
CL I 0) 66

00
L

127 D07 .
01

AY
ND 440

ET
FU

0
L

FU
AL CY x 0

09
55

Y
05 0.0

LKW

RO
160
05

kV
W E

L
76FFL+-

WA
D05

2N
B
BL

I
1W
48
(

CA
50
D05RE

R
CA

76
Q
Y 00

RA
LK
WA
15 )

SPA
AR NE kV L

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF National Grid SA
33 UNNE

1600

WA
00

49
D

DE
SPA

00
DE

00
N 15 40 T

3
31 NE

2
U

WI

D0

3w
1

DE
O

15

WI
12 D01 A GT-
1200D03
00 CRA
B 5(

WI

99
0

3u
44 22

1M

B
00
60 .)

OPERATIONAL SINGLE LINE DIAGRAM CA-1615439


T 11

1V
S

99

1M
1

205
16
A

D0

17
C 15 P

6M
90
E 20 TY

1N
(

00

17
CP
R

Y
FE

2
P 00 -R
D

00

T-
18

6-
L
0 SB

ROA

NE
15

1U
CP
FA

21
01

PA

00
00

30
EA
00

12 D130 A

SP
17
P-

LL
0
F

C-

00
18

Y
CD

D1
BS F

ER
83

12
55
AR

17
F OM

30
B/
03

TT
RM

WA
3. FO RO 5)

BA

00

R
10

35
S
AT GI 294
L
T PL 3

48
R-
V 1

AL
NE 2k 0x 0.00 2

Y
13 310FL+- P-
GT

DE
A

30
ON
AN OM 0

0
71
CH ARE

AR
PH
TT
3 F
(
RO 0)

160

00
01
16 0

D2 CT
20
L 1
180

45
N
AS
I RO 167

WI
L

331

UND
34 0

ER
D2

SE
NT

10
R

2
x

(TYP.)
NTE

DRA AVE
0

ME
I

0
PR

CO 000L+0.0
H3

00
SO
0
22 FF - 160 2
01

24
WEF

S
6985

90
GR (

BEF
EN 662

BU
00

BO
7.
OP FOR RM H2

00
18

YN
0

F
+R

35
150
FO

60
60 .

+6S
RC AT

00

21
00 S

.
6M

0
PL 22 CS

+R7
1M WIDE WALKWAY

1
16 )

FCU

0
CB

3
.

T
15
66

VC
220
P

D2

85

1200
MC
1

1
180 7
TY

AS
.

5.
00

0
+A

B
I
01

2
F
(

S.
2

+AM
0

C-
18

+R0

12 230
VC.

80
A

21
H1

SB-RD

3
90

59

FL

2
2
3

EC
.

B/

T-
02

1
00

MI
P-
80

+A

.
+U

05

50

CH
1

00
H0
65

D
3
P-
16

S.

0
+A

C.
0
80 TT

+R

0
15
10

FL

15
41

SD

2+
5

PR
+AV

SP
2

10
I

.
4M0 R1/R

+U
4M0

2
203

+AM

2A

495
S.
R1/ +

03
1800 F

R2

B
01

Y
.
1A/
VL

+R
R1/ + +

CH
0 050

R
0
SP

+4M

00
F

4+
0

150
50

TE
2

3.
80

+BB
7

+U
4M0 R1/R

160
ET
1

2B

D022

LE
H2

S.
SB-

+R0
R2
03

-
17

00
F

1B/

12

00
1.01

+M
00

D02
R1/ + +

VL

157 D04 B GT
5

36 1
6+
100

+4M

2
H2

1
2

ET.
CYBER
18

+BB

01.
4M0 R1/R

+U

TER

VAB
80

00
01

H
SEC(

0
R2
CZ)

05
EL
3 F

BC
+M
.

+R

21
H2

R1/ + +

80
CP
8+
+4M

99
3

2
2

DB
CYBER

+B
2U

01.
00

12
+S
4M1 R1/R

ET

00
1
C GT
2V

AV

03
H2 SEC( F X

R2

DC
00

90
3.03
NCZ)

07
2W

12
L

P.

+M

+R
C

87

CEN

MO
B

+BC
L

R1 + +
30

0+
+4M

1
=

B
SAS

+SC

16
2

Y
.

.
9

2
GR

N
H1

4M1 R1/R
S

ET

I
B +R02
GI

26

R
1
+ F

D0
SCP1

3950

MA
E

-0

11 /R2

02

38
F
09
5)

S
BL

+M

RE
.
GT
EA

R1/ + +
7

+B

-3
2+

CP

2
+4M

1
02
CA

1.01
H1 =SAS

.
.
F

12 D06

11
4M1 R1/R

02
+S

VR
09
X

62

15 D08 E GT
+SCP2

R2
5

F
kV

600
AR
2N

L
22 L

+R
+A

2N
H1
33 UNNE

R1/ + +

+BC

RAI
B
+4M

00
F

1W
0
4+

Y
2

50
2

0
1
10

.
=
SAS

4.
-0 LV

4M1 R1/R

R
VR

36
3

80

160
H1
SP

LOR
D

OM
+

SPAR
SCP3
T

960

R2

R0
DB

B
13

+A
40

0X

+BB -1B/2

R
2U

R1/ + +
02

+BB

6
F
+4M

6+

/2A +
AC

2
1 =SAS

.
H1

D0
2V

49
RO

CS
4M1 R1/R
93

04
SB-SP

SW 818

-1A R
3

00
+SLA1

R2
52

+( 00

LO

00
15
T3
2W

+A

+R
F

2
9

18

2
R1/ + +
H0 2

+4M

8+
5 L+0.

-0
1
F

3w
2
=

T.
S

6.
AS

50
4M2 R1/R
675

FF -
GR
33

F
F D

00
3

DCP
0
+
-R

R2
S

+R0

90 10
LB

17
7 1

1
FU

99
P H0

R1 + +

460

3u
-S

+4M
SB

0+

20
=

2
S
A

B
S

D
��

kV )

.
480

16

0
4M2 R1/R

D08
93
SB

F
00

06
E 5

000

1V
+

ELP
H0 SL
A2

21 /R2
1

19
00

00

+R
.

X806

R1/ + +
+4M

F
2+

1
=
S

MH
AS

M24 1/R2

16

8.
40
3

17
H0

-3
HV
21

I
128
+

48
S
L
25
B

+R0
2

13

R2
53

1N
1U

10.

AX
F

2950

Y
33

17
NG

R1/ + +
1

Y
+4M

R1/ +
H0 =
1V
S

2
84
A

17
S

R2

8.

WA
I

10. F
+R
500

C.

F
00
39
LL

GT
+

0
F

P
R C

BB
PA

+R0
SE
1

R2

100
Y,

23
1W
R1

OL
+4M 1/R2 + +4
SB-RD
-RD HB

100 160

LK
B,
PU OOK
Y

1U
+4M 1/R2 +
60
=

+4M
SA
SB

S
S

53
F
7

00

+R
26
BU
33

17
10

F
02
+

30
FC
304
P
B1

WA
+4M
F
H

00
F

25
H7

21

5
(
Y C

15
L

R1/ 28+

17
U-

+4M
=
SAS

F
2

231
R

44
75 H0

00
12

F
00
S
GI

R1/ 27+

R2

PP
+SAP1
34

DE
R

D1 .
RM

R
00
4

FUT
R2
1263
H0

16
=SAS

WI
0
12
30 6 +SAP2
H0

5
0
0

1x795 kCMIL ACSR/AW


25
L
= NE
SAS

MP
62

1M
240
60 .)
PA
G 70 F 8 FO
.

85
H0 +
85
SAP3
11
29
N
TY IO

01

-02

0
LI ECT
35

69

00
10
TY
PA N

150

260
B 0

RI
CI CON

GT

T
Y, 00 P NI

NE
U-
OM

G
H1

G
44

CU
R,

21
TY

BI
C GT
MU ER
F RO 5)

SE

P-
AY

69
W
(

CA
L
SE

0
2

RA
SO
H1

RM
CC

50
CE 303
T
00

60
CA V

R
00
1800
0
50

KW
FI

63
BI
1W 24 15
N.
5)
4 01
OF 85x0.00 OM
NE
H1 P-

01
62
58
RO
LI
DC

10
ON

WAL
12
1V 00 35FFL+-
TI

01
10

P-
6 EC

0
H1 0 ( GR
1U 15 16 00 0X
NN

TE
CO

SD
10
TY
18 SW 818 LI LY

T3
PA
RE AW
8

HV

88
P
H1

00
CI SUP
00
F/

00
0 kV 3
+(0.00 -SP
NI

DE
MD 01

NC 5
MU ER
15
F-

16 M 33 65) SB
LP F F/ DD

SR/
T

42
OO
0 I -DC MD 02 WA

25
WI
15
H2 L+
CO
DC -2

36
F-
.R 5)
/
80 FF -
NV
-DC CO DF DD

00
1

AC OR

35
-0 M F
NI 303 9
DC -1

00

0X
2 CP TP
NV S- DD
H2 16 AC -1 CO MPL
50 L UCT

00
DB
MMU 5x0.00

.
HV N VM

00
DC F LA L

1M
30

SEC

31
MI

1
D
33
-2
NE
CO 298

SEEPAGE
2 DB F
R2 -0 DC PA + (

172
H 2W
CP

65 kC
HB

18
1 FFL -

S
( ND
AC
5 R

BU
2V
HV 1
20

83
SEPTIC TANK
00
F-0 CFM
298 CO
00
H7
FO 5

0
3
FA
2U

CDP-03
-0

R"
0
150 1
CP 80
00
15

120
NG 79
AC =1

32
4
LV
Q
H2
16
HV

I OF
P
1x NDO

0
48

26
EN
MC
2N RO

"CONDOR" CONDUCTOR

5
6

50
H2
TA

OP ON
DA T/

CO . )

AD
NE

"
F BI

15

50
CA MG

43
P
P
8 I

00
04

33
H2 MR
RE AY NT TY

PIT
OF H-
1 ( SM

35
40
CO I -0
TR PME
0
H3
SP

RO

00

39
NG R AM

43

0
P
S.

30
E
RI
2
BL EQUI
H3

36
BEF
P

295
FO -S -RD
SB
00
4
H3 CA SB

R
03
AC OP
32

DE
CT

GT-

Y
H3
6
SH 0)
HV

B
J RK

8
0 0
WO x23

04
F
18

WI
8

0
H3

EL
0

PV
38 00 0.0

60
00

R
0 47 FFL+-

Y
H4 (

AV

5
D

00
40
100000

B
-R

SMH-01
2 8
SB H4 04

638
PV
P

GR
S.

8
F

6M
BE

04
4 U 8

40
H4 04

EA
FC

PV
PV
DN 00

R
01

0
6 01 3.

Y
H4 1.
32
AR

420

B
F D
H4
8 -R

(TYP.)
SB
F 02
00 E-
NEL EA
0 Y
WA
EN
H5

B
21
32
AS LK 03
OP CHAN L AR
RC 0
AI 10 WA P-
47
5

3.01
03 8
11

6
04

Y
ST CD H-
164 DE
RC I
PV E

Y
WI SM
A N RAV

RAMP

WA
R

R
1M 04
8
PV
DR G

LK
85
P R

00
M 0 -S R
00 FO

WA
2 SB

R
-0 350

23
45
T

31
87 CDP LE )
00
P
I S.

BEF
TO 300

DE
75WT

65
15

Y
WI
x2 50

ASPHALT AREA
01 FM
00 0

56
F-
.
00
FA C P
S.
32 =-0
AD
0 M
80 CF
AG ( =1 00 3

1M

B
L
32
Q
FF
Q=9F-0 C1

RO
Y
P EA
WT

2A -
01
N

S
Y

EP
F
WE

DE 00
P
S.

2B -
Y 01

S
WA 1.

WI 40

EP
LK

RWA
WA
P

1A -
S.

10

S
BEF

EP
DE
C3
P

4M
-S WI 02

1B -
00

5
3.

S
SB

RW

EP
1M

32

804

VSC
00

PC
B
01

8
-RD
H-

04
8
30
FM
F SM 04

ZA
B
PV

PV
FM

RW
BE
00

3.02

RW
SB
7
P
S. 8
03

Y
04
40
3. PV
9

B
RWZ

AC
8
04
PV
P
S.

8
C1
61

04
8 VB
04
P
S.

DC
EL

PV
PV
87 00
C2
C2 FM

32
VB

85
AV
FM
NK
TA

GR
IC 8
SE
PT 04
PV

EA

B
L
32
8
02 V04

10
H- P
3 AL
47
AR
SM 8

6
04

Y
P EP
A GE
PV W
COM
SE IT

26
P 8 Y

R
04
AT
PV
00 ST 0
AR
60 00 ND
6000

60

-M
M
CF

00 45
FM 8 0

17
04 90 3
OU
PV
P
S. P FM Q= F-0

15
S.
B

13
EA

Q 8
04 T
01 FM PV
5
F-
S
00
FA C P
S.

90
0 M
CF
A
88
80
=1 00 3
C
32
OU

Q
T

4000
77
Q=9F-0 C1
EA
E
R

4M WIDE ROAD
P

2A -
S
EP
EAD
00 SPR
IN

P
S.

2B -
S
EL
40

EP
OU
T

AV
GR

RWA
P

1A -
S.

S
EP
C3

1B -
00 EA

S
RW

EP
IN

R
32
OU
T

Y
AR

VSC
LL

PC
B

8
07

04
FM 8
04

ZA
PV
91

WA

PV
FM

EL

RW
00

RW
EA
I

P
N

S. 8

Y
04
40
PV

AV

B
OU
T

RWZ
8

AC
AR
04
PV

Y
P
S.

8
GR
C1

04
00 NDAR
VB

MR
8
04
P
S.

DC
PV
00
PV

OF
T

R
C2
IN

FM

ET
C2

E)
AL

Y
32
VB FM

M
DV
00
PH
UR

F
8

U
04

MD
PV
UT
AS

BO
(F

LS
60
32
8

MP
04
EAD PV
47 2

C
8

6
SPR

/D
04

Y
PV

DC
T
EL
AV
COM
R
GR

CAS
8

R
04

00
PV

00 AT
R

ST 0
30 85

10

R
PRE
M
CF
FM 8 0

17
04 90 3
PV
P
S. P
S. FM Q= F-0
EA

Y
8
04
P
S.
PV
M
CF
00 3

B
Q=9F-0 C1
Y
EA

2A -
S
Y

EP
P
S.

2B -
S
EP
RWA

1A -
S
EP
C3

1B -
S
RW

EP
ER

VSC

PC
B

07
FM 8
04

ZA
B FM PV
91

RW
RW
P
S. 8
04
PV

ZB

AC
RW
C1
P
S. VB

DC
C2
C2 FM
VB FM

0
8

00
04

R
PV
8
04 L
PV

20
1 A
L
M W
CO Y
AT
ST 0 D
AR
60
M
CF

E
FM 8
04
0

17
P FM PV
90 3
Q= F-0 UN
S.
EA O
04
8 B
PV
T
S
A
C
SPR
EAD E 3
AV
EL P
R 0
GR

T
38
9

32
77

SMH-02
E
SMH-03 SMH-04
MUNICIPALITY
52
65 N

-M
OPE L
RC NE
AN A
CH ARE

SEWER CONNECTION
N
AI EL
DR RAV

2
G

60
R
FO

44
10

LL
EA L

WA
L
AR
A

MUNICIPALITY
W

EL

ARY
RY
AV
A
D

UND
N
GR
U
O

3000 4732 3200 4000 3200 4000 3200 4500 4732 3200 4000 3200 4000 3200 4500 4732 3200 4000 3200 4000 3200 3000
B

BO
T
S
A

ST
EC
R
P

CA
PRE
FAF-01 FAF-01 FAF-01
Q=1800 CFM Q=1800 CFM Q=1800 CFM SEWER
MUNICIPALITY
WATER SUPPLY CONNECTION
CONNECTION

PV048 PV048 PV048 PV048 PV048 PV048 PV048 PV048 PV048 PV048
DRAWING/DOCUMENT ISSUED FOR
PV048 PV048
S.P
S.P
S.P
S.P
S.P
S.P
MUNICIPALITY BASE DESIGN
WATER SUPPLY
Y

Y
B

R
APPROVAL
OUT OUT

Q=900 CFM Q=900 CFM Q=900 CFM


EAF-03 S.P EAF-03 S.P EAF-03 S.P
CONNECTION
13

PV048
INFORMATION ONLY
PV048

PV048

PV048

PV048

PV048
Y

Y
B

R
IN
S.P IN
S.P S.P

OUT
C1 OUT
C1 C1

S.P S.P S.P CONSTRUCTION


R R R R
Y

Y
B

R
18.02.2025 MUS
IN

S-
EP A
IN

S-
EP A
S-
EP A
DATE BY
A

2 2 2
W

OUT OUT
R

R
P1 P2

P1 P2

P1 P2

You might also like