0% found this document useful (0 votes)
31 views1 page

D Daily Report 17 JAN 23

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views1 page

D Daily Report 17 JAN 23

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Safety First

DAILY DRILLING REPORT


Report No 17
Date: 17 1 2023
Rig Name FBOS-B6 Conssion NC151 Type Objective: DEVELOPMENT Company ZALLAF

SPUD DATE 1/1/2023 WELL No B9-NC151 Days : 17 Days Since Last Injury: 60

Present Operation: DRLG 12 1/4'' HOLE


Next Operation: POOH

Proposed TD 3600 R.O.P 3.4 Depth 2385 FD of Today 55 Total Footge 2385 Move From: Move To:
Rig
Move Distance: Time:
B
H
A

N (12 1/4" NBS 1X 8'' DC SS 11x8"DC, 8" jar,1X 8" DC,XO, 2x6 1/2" DC, 10x5" HWDP))
O
0

Bit No #3 TypeRSX716M-A1 Size 12 1/4'' WOB 25-28 RPM 90 Pressure 1000 STg W 92lbs Flow Rate 550

Pump No. 1: 70 Liner Size: 7'' Pressure: 400 T/Pressure 400 SCR Toolpusher MAHER AL OTHMAN
Mud
Pumps Pump No. 2: 70 Liner Size: 7'' Pressure: 400 T/Pressure 400 SCR Company Man WALID

Hole Size
12 1/4'' Casing Size 13 5/8'' Casing Shoe 738 Mud Weight 9

BOP A-Date Last P/T: 8/1/2023 B - PRESSURE 1500-200 C -Date Last F/T: 8/1/2023

TM for Today 107 Cumulative 288 Since Last Cut 544 Length of Rope Remaining: 3380 Safety Meeting date 17/1/2023 Supject Cleaning of the B8 NC-151 location

REPAIRS A-Last 24 Hrs 0 B-Month: 0 TOTAL PERSONNELS 75 SET CARD 3 TRIC CARD 1

From To OPERATIONS
00.00 7.00 Cont. drlg 12 1/4" hole f/ 2330' t/2382'-Circ. for sampling
Top of Tahara FM @ 2382'.
7.00 8.00 Circ. hole clean.
8.00 12.00 POOH w/12 1/4" bit t/ surface no drag no overpull.
12.00 19.00 P/U, M/U 8 1/2" core head and coring assembly (8 1/2" CH, 8 15/32 STB,CB, LDA,8 15/32 STB, Top sub, XO,
12x8"DC, 8" jar, 8" DC,XO, 2x6 1/2" DC, 10x5" HWDP)) and RIH t/ 2385'
19.00 22.00 Circ. hole to condition mud-Drop ball and start Cut core#2 (Tahara FM) f/ 2385' t/ 2398'-Observe ROP drop due to
core jam-Decided to POOH w/ core barrel.
22.00 00.00 POOH w/ core barrel#4 t/ 1300'

Time Disribution - Hours NOTES for Operation


Rih Time for
Rig U/D 0 Trips 16
Csg
0
Safety 1/2 1

Drilling 7 Servise 0 Fishing 0 2


Reaming 0 Repair 0 3
Log 0 Slip/Cut 0 4
CMT 0 NU Bop 0 5
C/Mud 1 Test Bop 0 6
Coring 0 NDBop 0 7

Diesel Used 2009 Diesel Balance 107,198

Field Break : Received: Dispatchure Requirements:

MT from Tripoli #0001193


Diesel 40000 lit

PERSONNEL In Rig 31 Camp 9 Clinte 14 Well Service 9 Visitor 0 Others 12 Note

No. of Vehicles/ Trucks : 9 Condition of Vehicles: Qty 8 Good 1 Bad


Crane PL 5-58015 Crane 514563 Forklift 5-14130 Truck 5-39846/530914 Water Truck Qty 2540997 Bulldozer N/A

140 Wt.: 1 90 Wt.: 1 50/20 Wt.: 1 40wt 6 37wt 1 ATF 2

Oxygen: Full 17 Empty 6 Acetylene: Full 6 Empty 5 Nitrogen Full 7 Empty 0

You might also like