0% found this document useful (0 votes)
35 views1 page

D Daily Report 14FAB 23

The Daily Drilling Report for Rig FBOS-B6 on February 13, 2023, details ongoing perforation operations and upcoming well testing. The report indicates a total of 73 personnel on site, with no injuries reported in the last 8 days. Key operations included logging tool activities and pressure testing, with a focus on safety and equipment status.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views1 page

D Daily Report 14FAB 23

The Daily Drilling Report for Rig FBOS-B6 on February 13, 2023, details ongoing perforation operations and upcoming well testing. The report indicates a total of 73 personnel on site, with no injuries reported in the last 8 days. Key operations included logging tool activities and pressure testing, with a focus on safety and equipment status.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Safety First

DAILY DRILLING REPORT


Report No 44
Date: 13 2 2023
Rig Name FBOS-B6 Conssion NC151 Type Objective: DEVELOPMENT Company ZALLAF

SPUD DATE 1/1/2023 WELL No B9-NC151 Days : 44 Days Since Last Injury: 8

Present Operation: PERFORATIONS


Next Operation: WELL TESTING

Proposed TD 3641 R.O.P Depth 3641 FD of Today Total Footge 3641 Move From: Move To:
Rig
Move Distance: Time:
B
H
A

N
O
0

Bit No #3 TypeRSX716M-A1 Size 12 1/4'' WOB 30-Dec RPM Pressure STg W 92lbs Flow Rate

Pump No. 1: m Liner Size: 7'' Pressure: T/Pressure SCR Toolpusher MOHAMMED
Mud
Pumps Pump No. 2: 70 Liner Size: 7'' Pressure: T/Pressure SCR Company Man RAMADAN

Hole Size
12 1/4'' Casing Size 13 5/8'' Casing Shoe 738 Mud Weight 9.4

BOP A-Date Last P/T: 11/2/2023 B - PRESSURE 1500-200 C -Date Last F/T: 11/2/2023

TM for Today 0 Cumulative 357 Since Last Cut 544 Length of Rope Remaining: 3290 Safety Meeting date 14/2/2023 Supject WORKING AT HIGHTS

REPAIRS A-Last 24 Hrs 0 B-Month: 0 TOTAL PERSONNELS 73 SET CARD 8 TRIC CARD 8

From To OPERATIONS
00.00 03.00 POOH W/WL Logging Tools and L/D Logging Tools, WL BOP and Shooting Nipple
03.00 13.00 P/U, M/U and RIH W/TCP-DST String T/2683f
13.00 16.00 HPJSM, R/U WL Logging Tools (GR-CCL) RIH and Correlate the Depth. Allocate RA Marker Sub at 2531.5f
16.00 17.00 POOH W/WL Logging Tools and L/D the Same
17.00 Space-out as Required to Set Perf. Guns against the Perf. Intervals (2672ft-2678ft).
18.00 Set the PKR, Slack-off Weight 33klb, Close Pipe Ram, Back Side PRESS Test 500psi F/15Min.Ok.
18.00 N/U SLB WH, L/U Surface Lines, Flex Hose and Testing Facilities
Flush Lines, P/T Upstream/Downstream the Same T/2600/500Psi Respectively F/15Min. Ok
00.00 WODL

00.00 06.00 OPERATIONS FROM 00.00 TO 06.00


00.00 Cont. WODL

Time Disribution - Hours NOTES for Operation


Rih Time for
Rig U/D 0 Trips 0
Csg Safety 1/2 1

Drilling 0 Servise 0 Fishing 0 2


Reaming 0 Repair 0 0 3
Log 0 Slip/Cut 0 0 P 4
CMT NU Bop 0 0 5
C/Mud 0 Test Bop 2 0 6
Coring 0 NDBop 0 0 7

Diesel Used 3100 Diesel Balance 62,808

Field Break : Received: Dispatchure Requirements:

PERSONNEL In Rig 31 Camp 9 Clinte 14 Well Service 15 Visitor 0 Others 5 Note

No. of Vehicles/ Trucks : 9 Condition of Vehicles: Qty 8 Good 1 Bad


Crane PL 5-58015 Crane 514563 Forklift 5-14130 Truck 5-39846/530914 Water Truck Qty 2540997 Bulldozer N/A

140 Wt.: 1 90 Wt.: 1 50/20 Wt.: 1 40wt 6 37wt 1 ATF 2

Oxygen: Full 23 Empty 1 Acetylene: Full 11 Empty 0 Nitrogen Full 7 Empty 0