SPUD DATE 1/1/2023 WELL No B9-NC151 Days : 44 Days Since Last Injury: 8
Proposed TD 3641 R.O.P Depth 3641 FD of Today Total Footge 3641 Move From: Move To:
Rig
Move Distance: Time:
B
H
A
N
O
0
Bit No #3 TypeRSX716M-A1 Size 12 1/4'' WOB 30-Dec RPM Pressure STg W 92lbs Flow Rate
Pump No. 1: m Liner Size: 7'' Pressure: T/Pressure SCR Toolpusher MOHAMMED
Mud
Pumps Pump No. 2: 70 Liner Size: 7'' Pressure: T/Pressure SCR Company Man RAMADAN
Hole Size
12 1/4'' Casing Size 13 5/8'' Casing Shoe 738 Mud Weight 9.4
BOP A-Date Last P/T: 11/2/2023 B - PRESSURE 1500-200 C -Date Last F/T: 11/2/2023
TM for Today 0 Cumulative 357 Since Last Cut 544 Length of Rope Remaining: 3290 Safety Meeting date 14/2/2023 Supject WORKING AT HIGHTS
REPAIRS A-Last 24 Hrs 0 B-Month: 0 TOTAL PERSONNELS 73 SET CARD 8 TRIC CARD 8
From To OPERATIONS
00.00 03.00 POOH W/WL Logging Tools and L/D Logging Tools, WL BOP and Shooting Nipple
03.00 13.00 P/U, M/U and RIH W/TCP-DST String T/2683f
13.00 16.00 HPJSM, R/U WL Logging Tools (GR-CCL) RIH and Correlate the Depth. Allocate RA Marker Sub at 2531.5f
16.00 17.00 POOH W/WL Logging Tools and L/D the Same
17.00 Space-out as Required to Set Perf. Guns against the Perf. Intervals (2672ft-2678ft).
18.00 Set the PKR, Slack-off Weight 33klb, Close Pipe Ram, Back Side PRESS Test 500psi F/15Min.Ok.
18.00 N/U SLB WH, L/U Surface Lines, Flex Hose and Testing Facilities
Flush Lines, P/T Upstream/Downstream the Same T/2600/500Psi Respectively F/15Min. Ok
00.00 WODL