0% found this document useful (0 votes)
17 views8 pages

Project Management System

The document outlines the functionality of the 'Cooltek OMS' operation management system, detailing its primary modules including Enquiry & Quotation, Project Management, Invoice & Financials, Material Management, HR Management, and Vendor Management. Each module is designed for specific user roles such as System Admin, Manager, Accountant, and Engineers, with defined access levels and responsibilities. The system aims to streamline various operational processes through a comprehensive data framework and user interface.

Uploaded by

arkabasu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views8 pages

Project Management System

The document outlines the functionality of the 'Cooltek OMS' operation management system, detailing its primary modules including Enquiry & Quotation, Project Management, Invoice & Financials, Material Management, HR Management, and Vendor Management. Each module is designed for specific user roles such as System Admin, Manager, Accountant, and Engineers, with defined access levels and responsibilities. The system aims to streamline various operational processes through a comprehensive data framework and user interface.

Uploaded by

arkabasu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 8

OPERATION MANAGEMENT SYSTEM – “Cooltek OMS”

The following data briefly summarizes the intended functionality of the required system. The customized product
should cater to, but not limited to, the described relationship matrix and inter-dependence of data framework.

PRIMARY MODULES:
SL NAME OF MODULE INTENDED USERS
.
1 ENQUIRY & QUOTATION System Admin, Manager, Sales Executive, Accountant, Project Engineer,
Jr. Engineer
2 PROJECT MANAGEMENT System Admin, Manager, Accountant, Project Engineer, Jr. Engineer,
Site Supervisor
3 INVOICE & FINANCIALS System Admin, Manager, Accountant, Jr. Accountant, Project Engineer
4 MATERIAL MANAGEMENT System Admin, Manager, Accountant, Jr. Accountant, Project Engineer,
Site Supervisor
5 HR MANAGEMENT (HRMS) System Admin, Manager, Accountant, Jr. Accountant, Project Engineer,
Jr. Engineer, Site Supervisor
6 VENDOR MANAGEMENT System Admin, Manager, Accountant, Jr. Accountant, Project Engineer,
Jr. Engineer

USER ROLES
SL USER ROLE ACCESS LEVEL
1 System Admin Control, Edit, View, Notify Everything.
Approving Authority for all levels of requests.
Require dedicated Dashboard on login.
2 Manager View & Notify Everything.
Control HRMS, Vendor Management, Invoice & Financials.
Approving Authority for all levels of requests.
Require dedicated Dashboard on login.
3 Accountant Control Invoice & Financials, Material Management.
View and Generate reports for All Project Inventory.
Approving Authority for Material Deviation Statement on receipt at site.
Control HRMS User Section, Vendor Management for Assigned Project.
Require dedicated Dashboard on login.
4 Sales Executive Control Enquiry & Quotation.
View Project Management, Material Management for Assigned Project.
Control HRMS User Section, Vendor Management for Assigned Project.
Require dedicated Dashboard on login.
5 Project Engineer Control Project Management, Material Management for Assigned Project.
View All Project Inventory Summary.
Approving Authority for Jr. Engineer & Site Supervisor requests.
Control HRMS User Section, Vendor Management for Assigned Project.
Require dedicated Dashboard on login.
6 Junior Engineer Create BOM for Assigned Project under Project Management.
Create BOM for Project BOQ under Enquiry & Quotation.
View Assigned Project Inventory Summary.
Control HRMS User Section, Vendor Management for Assigned Project.
Require dedicated Dashboard on login.
7 Site Supervisor Control Good Receipt and Material Issue under Material Management.
Create Daily Progress Report under Project Management.
View Assigned Project Inventory Summary.
Control HRMS User Section, Vendor Management.
Require dedicated Dashboard on login.
MODULE DETAILING:
 ENQUIRY & QUOTATION

ENQUIRY & QUOTATION

RETAIL/ PROJECTS GOVT. TENDER

CLIENT DETAILS CLIENT DETAILS


(refer Form) (refer Form)

CREATE DOWNLOAD ENTER PROJECT


QUOTE COSTING TOOL DETAILS
(on admin approval)
(refer Form)

UPLOAD BOQ
ENTER COSTING
SUMMARY
CREATE BOM (refer Form)
DOWNLOAD
COSTING TOOL
(on admin approval)
UPLOAD FINAL GENERATE PDF
SELECT TYPE COSTING
ENTER PRICE (refer Form)
(on admin approval) (SITC/ S+ITC)

UPLOAD FINAL
COSTING / REVIEW/ CREATE GENERATE PDF
UPLOAD CSV TERMS & CONDITIONS (refer Form)
FILE FOR
COMPLETING
ABOVE
COMPOSITE LEDGER
GENERATE QUOTATION NO.
AGAINST FORM FILL UP

As the entire module will take time to be completed, need to create


“Generate Quotation No.” option for Retail part w.e.f. 1st April, 2023.

CREATE PROVISION FOR ADMIN APPROVALS ADD REMINDER FOR STATUS UPDATE FOR
BEFORE ADDITION TO COMPOSITE LEDGER UNTAGGED PROJECTS EVERY FORTNIGHT.
 PROJECT MANAGEMENT

PROJECT MANAGEMENT

IMPORT PROJECTS FROM QUOTATION LEDGER


TAGGED AS "SUCCESSFUL" AND CREATE
"BOOKED PROJECT LEDGER"

SELECT INDIVIDUAL PROJECT FOR


DETAILING

PROJECT UPLOAD PROJECT


SCHEDULING BOQ

MILESTONE MATRIX
MATERIAL SCHEDULE OF
PLANNING RATES

DAILY PROGRESS
REPORT
UPLOAD BILL OF
QUANTITIES
RA BILLING

CREATE BILL OF MATERIALS AS


PER PRODUCT MASTER IN SYNC PART RATE TYPE
WILL TALLY DATA

PART QUANTITY TYPE


GENERATE CONSOLIDATED
BILL OF MATERIALS

FOR BOOKING CLIENT PO IN TALLY AS PER GENERATED BOM

FOR TRACKING CHALLAN WISE MATERIAL RECEIPT AT SITE

FOR ISSUING SUPPLIER PO FROM TALLY

As the entire module will take time to be completed, need to create


“Daily Progress Report” section at the earliest.
 INVOICE & FINANCIALS

INVOICE & FINANCIALS

IMPORT DATA FROM


"ONGOING PROJECT LEDGER"

INVOICING PROJECT FINANCIAL

CREATE INVOICE GENERATE INV. NO.

FROM FROM RA/ AMC


PRODUCT PROJECT BILL
MASTER BOQ COVER
ENTER DETAILS (as
per form)

CONSOLIDATED
"INVOICE LEDGER"

RA BILL EXPENSE
SUMMARY DETAILS
DYNAMIC
LIST FOR
GST FILING
TAG

PROJECT-WISE SUMMARY
(as per entry form)
PROJECT-WISE
MONTHLY SUMMARY
(as per enrty form)

CASHFLOW
STATEMENT

FOR CREATING INVOICE FROM PROJECT BOQ, ASK FOR SITC / S+ITC PRICING.
IF SITC IS DIVIDED INTO PARTS, ASK FOR DEFINING THE DIVISION IN %-AGE.
 MATERIAL MANAGEMENT

MATERIAL MANAGEMENT

CREATE PRODUCT MASTER


FROM TALLY DATA WITH
GST-HSN CODES

MATERIAL TRANSIT PROJECT INVENTORY


MANAGEMENT

CREATE CHALLAN
SELECT PROJECT FROM
"ONGOING PROJECT LEDGER"
SELECT PROJECT FROM "ONGOING
PROJECT LEDGER"
SELECT CHALLAN FOR MATERIAL
RECEIPT BY SITE SUPERVISOR
SPECIFY SERVICE
DELIVERY LOCATION
MATERIAL RECEIPT
ACKNOWLEDGEMENT BY
SELECT PRODUCTS FROM SITE SUPERVISOR
PRODUCT MASTER

GENERATE DEVIATION
ENTER MAKE, STATEMENT
QTY & RATE

GENERATE PDF WITH CREATE "MATERIAL RECEIPT


TOTAL VALUE GENERATE CHALLAN LEDGER" AS PER
MASTER LEDGER ACKNOWLEDGEMENT BY SITE
GENERATE PDF WITH SUPERVISOR
UNIT RATES

CREATE "MATERIAL ISSUE FORM"


WITH PRODUCTS AS PER "MATERIAL
RECEIPT LEDGER"

GENERATE DAILY
CONSUMPTION REPORT

GENERATE PROJECT-WISE
STOCK STATEMENT
 HR MANAGEMENT SYSTEM

HR MANAGEMENT SYSTEM (HRMS)

EMPLOYEE DETAIL MASTER LIST WITH


DOWNLOADABLE LINK FOR PHOTO & FAMILY
PHOTO (as per Entry Form)

GENERATE UNIQUE ID

GENERATE PDF FOR ID CARD

CONSOLIDATED STAFF LEDGER

TASK REPORTING SYSTEM ATTENDANCE & LEAVE LOAN REQUESTS


MANAGEMENT

POSTING OF TASKS INVOLVED


MONTHLY UPDATE OF GENERATE EMPLOYEE WISE
(BI-WEEKLY)
ATTENDANCE RECORDS FROM LOAN ELIGIBILITY CALCULATOR
TALLY PAYROLL DATA BASED ON PAYROLL & SERVICE
RECORDS

APPROVAL REQUEST TO NEXT


HIGHER USERS
GENERATE EMPLOYEE LEAVE
APPLICATION REQUEST FOR
APPROVAL BY HIGHER USERS GENERATE EMPLOYEE LOAN
APPLICATION REQUEST FOR
APPROVAL BY HIGHER
PROVISION FOR RATING DURING USERS
TASK ACKNOWLEDGEMENT
GENERATE EMPLOYEE-WISE
SERVICE BOOK/ RECORDS

GENERATE CONSOLIDATED GENERATE EMPLOYEE-


STAFF RATING LEDGER WISE LOAN
TRANSACTION
 VENDOR MANAGEMENT
VENDOR MANAGEMENT

SERVICE VENDORS PURCHASE VENDORS

CONTRACTOR ENLISTMENT PURCHASE VENDOR LEDGER WITH


(AS PER ENTRY FORM) PRODUCT CATEGORY DETAILS

GENERATE PROJECT-WISE PO
CREATE NEW PRODUCT MASTER FOR TO VENDORS IN PDF
CONTRACTOR SERVICE WORK

GENERATE PROJECT-WISE
CONTRACT MANAGEMENT PO LEDGER

FINAL RATE WITH BOQ


FROM SERVICES MASTER
WITH PROJECT TAGGING

ISSUE OF WO & GENERATE


AGREEMENT AFTER REVIEW
OF TERM & CONDITIONS

RA BILLING AS PER WO ON
PART QTY BASIS

You might also like