Inspection_Checklist_NCR
Inspection_Checklist_NCR
jsyos ds lapkyu esa lqjf{kr ;k=k loZizFke vko”;drk gS] laj{kk loksZifj
gSA rFkk laj{kk gsrq jsyos esa gj Lrj ij fujh{k.k fu/kkZfjr fd, x, gSa bu
fujh{k.kksa dks lkjxfHkZr cukus ds fy, mRrj e/; jsyos ds laj{kk foHkkx }kjk
fujh{k.k fu;ekoyh (rduhdh)*tkjh fd;k tk jgk gSA
(vkyksd tkSgjh)
egkizcU/kd
ifjp;
eq>s *balisD”ku eSuqvy& balisD”ku ckbZ vkfQllZ* dks tkjh djrs gq,
vR;Ur izlUurk gks jgh gS bl eSuqvy dks nks Hkkxksa esa cuk;k x;k gS Hkkx *d* esa
esa jsy ds lapkyu ls tqMs gq, ikWpksa QzaV ykbu foHkkx rFkk laj{kk foHkkx }kjk
fd, tkus okys fujh{k.kksa dh la[;k rFkk Hkkx *[k* esa fujh{k.k fd, tkus okys {ks=
ds fy, psd fyLV nh xbZ gSA
eSa bl eSuqvy dks cukus esa lHkh lacaf/kr foHkkxksa }kjk nh xbZ tkudkjh ds
fy, mudk vkHkkj O;Dr djrk gwWA
“kqHkdkeukvksa lfgr
(vkj-,l-oekZ)
Eqk[; laj{kk vf/kdkjh
mRrj e/; jsyos
NORTH CENTRAL RAILWAY
iz/kku dk;kZy;
HEAD QUARTER OFFICE
Lwkcsnkjxat] bykgkckn
SUBEDARGANJ, ALLAHABAD
Lakj{kk foHkkx
SAFETY DEPARTMENT
ekpZ 2013
March 2013
Contents
1 Safety department
2. Operating department
3. Civil Engineering department
4. Electrical department
5. Mechanical department
6. S& T department
1. Operating department
2. Civil Engineering department
3. Signal & Telecommunication department
4. Mechanical department
5. Electrical department
Annexures
I. Footplate Inspections
II. Crew Booking Office/Lobby
III. Inspection of Running Room
IV. Night Inspection of Station
V. Accident Relief Medical Van Auxiliary VAN (RHV)
VI. Check list of S&T department
Part-I
Inspection matrix
Part-II
(xii Whether S&T gears, cabin basement/relay room kept under locks
and its register maintained.
(xiii) Memos served by ASM to S&T staff for S&T failures.
(xiv) Cross check signal failure register with T-369 (3b). Also timings of
preparation of T-369 (3b) from TSR to ensure sufficient time for the
porter for following provision of GR.
(xv) Cross check shunting order with attaching/detaching register.
(xvi) Cross check private number with adjacent block station, cabins
and gates.
(xvii) Cross check caution order book and caution register.
(xviii) Detention to trains outside signal.
(xix) Cross check crank handle register with signal failure register.
(xx) Cross check number of emergency counters with the register.
(xxi) Whether Axle Counter failure register maintained and how
clearance of line ascertained in case of Axle Counter failures.
(xxii) Total failure of communication and No. of trains started without
line clear. Cross check with TSR.
(xxiii) Accident register, follow up action against accident prone staff
and suggested remedies/measures.
(xxiv) SM’s night inspections and safety meetings, effective or not.
(xxv) Scrutinize station inspection book and follow up action thereto.
(xxvi) Watch cases or loose/rough shunting Explain to staff about
dangers involved therein.
(xxvii) Adequate communications and lighting facilities in yard.
(xxviii) Possibilities of reducing detention to stock and shunting engine
hours.
(xxix) Cross check during PLC working, S&T supervisor & opts supervisor
reached station timely. No crossing or precedence is arranged
at the station.
(xxx) Whether the Block Instruments indicate the condition of Block
Section correctly and is corresponding with entries in TSR.
(xxxi) Acknowledgements of Loco Pilots and Guards should be
obtained when caution orders are handed over to them.
(xxxii) Whether the First Aid Box is complete with valid medicines.
(xxxiii) Check Disconnection/Reconnection register for proper records.
(xxxiv) Whether stabling load register maintained as per latest
instruction and sufficient chains & wooden wedges are available
for securing of load.
1.3 RULE BOOKS REGISTER AND CHARTS
2.0 CABINS
(i) Guards essential equipments of two stopping trains viz rule books
with latest amendment slip, HS lamp, tail lamp/board, and
current working time table, a red flag a green flag, First aid box,
fire extinguishers and PCP set of passenger trains. Test
knowledge of Guard about use of PCP.
(ii) Currency of fog and fusees.
(iii) Complete bio-data available or not.
(iv) Additional equipments i.e. one spare red flag, 2 vacuum hose
pipe washers, No. of pad locks as prescribed, one
vacuum/pressure indicator (gauge).
(v) Accident relief bands for Mail/Exp Guards only.
(vi) Availability of sealed TL box in Brake Van of passenger train and
check knowledge of passenger Guard for correct use of TL box.
(vii) Availability of pressure gauge on Brake van
(i) Functioning of head light, marker light and flasher light of engine,
speedometer, speedograph, hand and other brakes.
(ii) Loco Pilots essential equipments.
(iii) Whether upto date rule books & current working time table
available?
(iv) Whether adequate brake power and vacuum/air pressure
available?
(v) Whether Brake Power certificate and caution order issued
correctly?
(vi) Bio-data of Loco Pilot regarding competency, periodical
medical examination and safety camp etc.
(vii) If Loco Pilot wears spectacles, another pair of spectacles kept or
not.
(viii) Calling and repeating aspects of signal by Asstt. Loco Pilot/ and
Loco Pilot.
(ix) Whether Loco Pilot conducts continuity test (whenever required)
brake feel test and brake power test in First block section?
(x) If Loco Pilot observes the speed restrictions and other speed limits
of the section.
(xi) Exchange of all right signal between station staff and the crew.
(xii) Visibility of fixed signals whether extinguished or drooping.
(xiii) Whether Loco Pilot looks back from time to time to ensure train is
running in safe and proper manner.
(xiv) Whether Loco Pilot stops for 1”/2” on red automatic signal during
day/night respectively, exchanges all right signal with Guard
and proceeds at 15 KMPH speed upto next automatic signals?
(xv) Test the knowledge of Loco Pilot and Asstt. Loco Pilot about
protection of train disabled in block section, specially in case of
accident when on double line, adjacent line is blocked & other
relevant rules.
(xvi) Whether Loco Pilot leaves engine unmanned and permits
unauthorized person to drive the engine?
(xvii) Whether Loco Pilot stop for 5” in case of red modified semi
automatic signal and proceed at maximum speed of 10 Kmph.
(xviii) Availability of wooden wedges on loco.
(xix) Availability of spare air pipe.
(xx) Working of loco hand brake.
(xxi) Working of Audio Visual indication in Air brake locos.
8.1 STATIONS
(i) Loco Pilot and Guard look for Gateman danger SE signal.
(ii) Guards response if danger signal is shown to him.
(iii) Whether Loco Pilots stops 1” during 2” during night if Gate signal
is “ON”.
(iv) Whether Loco Pilot intermentely whistles at ‘WL’ board up to
unmanned L-xing Gate?
(v) Displaying of hand signal by gateman to an approaching train.
(vi) Timely closing and opening of gates.
(vii) Observance of speed limits by the driver if some engg. Restriction
is imposed.
(i) Whether Loco Pilot stops for 1”/2” at red automatic signal during
day and night respectively.
(ii) Loco Pilot exchanges all right signals with Guard before starting.
(iii) Loco Pilot proceeds at 15 KMPH speed up to next automatic
signals.
(iv) Whether Loco Pilot stop for 5” at red modified semi automatic
signal and proceed with maximum speed of 10 Kmph.
10.3 AT I.B.S.
(i) Joint check with Mech. & Medical officers once in three months.
(ii) List of equipment to be physically verified.
(iii) Personal verification of working of each tool and equipment.
(iv) Last inspecting officer may be held responsible if any equipment
fails at site.
Engineering Department
1.0 FORMATION
2.0 BALLAST
3.0 SLEEPERS
4.0 RAILS
5.0 FASTENING
(i) Whether tools and plants are sufficient and in good condition.
(ii) Check strength of the gang vis-a-vis muster sheet and utilization
of men.
(iii) Knowledge of gang about the Safety rules.
(iv) Checking of quality of previous days work of the gang and its
quantity
(v) Grievance/difficulty of the gang staff, if any
8.0 CURVE
(i) Physical condition and wear of Tongue rail, Stock rail and
crossing
(ii) Check rail clearances of wing rail & check rail
(iii) Throw of switch (95 to 115 mm)
(iv) Condition of fittings
(v) Standard fittings provided or not
(vi) GRSP worn-out/worked out, if any
(vii) Alignment and Unevenness
(viii) Whether the length of turnout is standard and location of stock
joint is correct
(ix) Gauge and cross level at specified location
(x) Gauge, cross level and versine in lead portion
Annexure 5.1
4.0 General
(iv) Quality of pre and post attention in track for machine working.
Officers of Machine Organisation will report deficiencies to Sr.
DENs/DENs.
(v) Safety aspects (Rules of protection, safety equipments,
Knowledge of safety rules).
(vi) Availability of the updated tamping charts with the machines as
well with the divisional officers.
(vii) Maintenance of records pertaining to the machine.
5.0 BRIDGES
(i) SER/LSC/Relay Room key is not taken more than once in a month for
schedule maintenance & supervisor takes it.
(ii) Switch on Relay Room Door is as per standard arrangement & spurious
logging is not there.
(iii) Cross check relay room register with data logger records and mechanical
counters / S&T control record - No. of times key taken and duration shall
match.
(iv) Key for Construction work is taken as per the programme agreed by Sr.
DSTE.
(v) Construction staff has given memo of the work done for each occasion of
key taken and has also recorded in the work register to be kept in relay
room by Construction works.
(vi) Block Instrument key is taken only after acceptance of either Failure
Memo or under accepted disconnection notice. Check from records.
(vii) Block Instrument key is not taken or instrument opened when it is on TOL /
Line Clear position. Check timing from TSR.
(viii) Double locks at in Relay Rooms/SER at stations are effective and it is not
possible to open without proper key. Try with all available keys with S&T
staff.
(ix) Check for duplicate keys in Signal Technicians duties room, tool box / bag.
(x) Signal Technicians duty room key is with Signal Technicians and Section
JE/SE/SSE only.
(xi) Relay Room key of S&T lock remains in custody of Signal Technicians of
Station / Section.
(xii) Exceptional report from data loggers to be checked if provided for – point
failure, signal failure and delay in signal going to ON after occupation of
controlling TC.
(xiii) All relays are properly sealed with screw fully tightened and an impression
on seal is proper.
(xiv) Spare relays are kept sealed in Relay Room.
(xv) Data Loggers / modem or its reset is shifted outside, wherever feasible.
(xvi) Panel, lever frame, SM frame, Block testing / overhauling is done.
(xvii) Panel, lever frame, SM frame required lever/slide/button collars are
available.
(xviii) In Relay Room loop or extra wire are not kept.
(xix) Air Conditioning System where provided is working
(i) Signal Failure Memo is issued for each failure recorded in SFR.
(ii) Each memo issued by SM is acknowledged.
(iii) Put right time & cause of failure are entered properly by SM & S&T staff
respectively.
(iv) Signal failures, which could have been attended from outside but relay
room key taken.
(v) Trains passed on signal during signal failure.
(vi) Train passed on signal when relay room key was taken during signal failure.
(vii) Total trains passed during failures as per TSR & SFR & T 369-3 B actually
issued.
(viii) T 369-3 B cancelled during signal failure & otherwise.
(i) Total Nos. and adequacy of duration for the type of work done.
(ii) No. of trains passed on signal during disconnection.
(iii) Cross check the functioning of the disconnected gear with data loggers
report and the work, if any done after reconnection.
(iv) Reconnection of Construction work on existing gear is after testing by
open line.
(v) All Supervisors & Maintainers are aware of the activities to be done with
and without disconnection.
1.4 COUNTERS
(i) Check all the counters are in working conditions and increment by one
only.
(ii) Counters are getting updated in both LCP
(iii) RRBU or EUUYN cancellations are done after receipt of memo from SM &
all memos kept serially numbered in guard file.
(iv) EWN operation during TC failure – corresponds with SFR record.
(v) ERRB cancellations are not too many & analysis of it.
(vi) Proper procedure of Axle Counter / MUX resetting is followed.
(i) Safety meetings are scheduled every month and all staff attended.
(ii) Signal lamp lasting arrangements for 3 hours.
(iii) Material shortage, stock / non-stock items and storage system.
(iv) Staff grievances.
(v) Staff Bio data book (Gyan Jyoti) with Competency certificate cum training
history book is with each maintainer and supervisor, as issued by Training
school/SSDE in-charge.
(vi) Staff is categorized as A, B, C category and 6 monthly review done.
(vii) Staff is not due for refresher course.
(i) Signal defects are attended and the remarks are put in.
(ii) Repeated cases of defects reported.
2.1 MAINTENANCE
(i) Maintenance by Signal Technician is regular & record kept in SMC and
site book.
(ii) Sectional JE/SE/SSE’s inspections are regular & record kept.
(iii) Quarterly inspections by SSE and monitoring system by him to ensure
quarterly inspection.
(iv) P-5 Schedule by SSE and corresponding disconnection memo of
adequate duration.
2.2 POINTS
(i) Point motors are opened for regular maintenance & not kept sealed
throughout the year except monsoon.
(ii) Epoxy coating of motor & detector assembly in flood prone area is done.
(iii) Ground connections are fitted as per standard drawing.
(iv) Wear & Tear on machine slides, looseness on pins in ground connection.
(v) Motor current under obstruction & normal and variation
(vi) Friction clutch trips under obstruction.
(vii) WJR timing for “N” & “R”
(viii) A ward on point motor corresponds with the KLR.
(ix) Cleanliness of carbon brush & availability of chamois leather.
2.4 SIGNAL
(i) LED is provided with current regulators with proper setting for
Conventional or LED ECR as per ECR provided
(ii) HMU functions is checked regularly as per schedule where provided.
(iii) Cases of repeated LED and CRU fusing/failure of a signal or particular
make.
(iv) Signal is secured properly and earthed.
(v) Rodents entry and ingress of moisture and rain water is properly plugged.
(vi) SPDs are provided across each aspect.
(i) Co-operative reset is effective & for point zone and it is from site.
(ii) Resetting of axle counter – analysis, repeated resets and cause thereof.
(iii) Channels voltages are in limit.
(iv) Resetting of MUX and analysis of it.
(v) Quad cable is terminated on M6/Link disconnect terminals – plan for
removing 8-way.
(vi) Availability of spares, card, field units & measuring instruments.
(vii) Checking system of spares, put for one day in service.
(viii) Storage of spare cards.
(ix) Axle Counter/MUX are provided with better earth through resistance
improvement compound.
(x) SPDs are provided for each channel
(xi) Shielded cable is used for channels connection to evaluator
(xii) Spurious or induced voltage in channels wrt earth is is not there.
(xiii) Telecom cable joints are not buried in ground but protected in location.
(xiv) Deflector plates are provided
2.8 PANELl/LCP
2.9 EI
2.13 DOCUMENTS
(i) Prints of approved tracing of completion circuit of the last alterations are
available.
(ii) Modifications, if any done, it as per approved circuit & approved
diagrams for that are available.
(iii) All documents as per list are available.
Mechanical Department
1. 0 DIESEL SHED
2.1 MECHANICAL
(i) Move radiator fan blades with hand clock wise and anti-clock wise
to detect any Backlash.
(ii) Move radiator fan blades up and down with jerk to check the
condition of radiator fan bearing.
(iii) Check RTM blower taper sleeve lock nut tightness.
(iv) Check the condition of ‘V’ belts.
(v) Check the leakage from the expansion tank bottom plate.
(vi) Check the clamping of water pipe on top of RTM blower.
(vii) Check the ECC base for any copper dust.
(viii) Check the condition of water cross over pipe of radiator and its
protection.
(i) Cleanliness.
(ii) Check oil level in Governor.
(iii) Check provision of grommet in high pressure tubes.
(i) Check adequate level of suspension bearing oil and its filling cap.
(ii) Check adequate level of cardium compound in gear case and its
cover.
(iii) Check tightness of gear case bolt.
(iv) Check if the rollers on the equalizing beam are free.
2.1.2 ENGINE IN RUNNING CONDITION
2.2 ELECTRICAL
(i) Check cleanliness and condition of finger tips of CK1 and CK2
Contractors.
(ii) Visually inspect the condition of Panels.
(i) Check for wiring of RCC for proper clamping (Radiator clutch
coil).
(i) Check for layout of axle generator wiring and its clamping.
(ii) Ensure that the cables are not rubbing with body.
(iii) Ensure that the TM covers are intact and properly secured.
(i) Check for operation of ECC and other circuit breakers like FP
Circuit breakers, Cr. Case Exhauster Motor circuit breakers.
(ii) Check for correct operation of BKT. Reverser, Power contractors.
(iii) Check for air leakages from pneumatic pipelines to reverser RXT
and power contractor magnet valves.
(iv) Check the operation of the following emergency switches Motor
cut out switch, Radiator Fan emergency switch, PCS, TRL, DMR.
3.5 PETROMAX
3.8 DETONATORS
3.9 COMPRESSOR
(i) Availability and adequacy of other tools like jacks, hard wood
Packing, camera, kitchenware, first aid equipment.
3.14 CAMERA
(i) Check the camera and its flash for its proper operation.
3.15 KITCHEN WARE, COOKING GAS ETC.
(i) Check the tools and equipment list and see that the tools,
gauges, spanner etc, are available in ART as per revised list.
(ii) Check all the measuring instruments are also kept as per
requirement.
4.3 GENERATOR
5.5 MATERIALS
(i) Housekeeping.
(ii) Compliance of stores imprests schedule.
(iii) Important item out of stock / in short supply. Check consumption
of all consumables per annum. Is it adequate to cover the
cleaning requirements throughout the years.
(iv) Non moving items/correctness of imprests sanction.
(v) Scrap return.
(vi) Proper storing of rubber item.
5.6 FINANCE
5.7 ESTABLISHMENT
(i) Vacancies
(ii) Staff grievances
(iii) HOD/Sick cases
(iv) Causality/absentees. Are attendance registers properly kept and
checked in time? Action taken on frequent and OR long
absentees.
(i) Check for cracks on horn gaps, side frame/ spring plank on
CASNUB Bogies.
(ii) Replace cracked/broken springs.
(iii) Check spring cambers for over loading.
6.4.5 MISCELLANEOUS
6.5.3 MISCELLANEOUS
(i) Ensure all angle cocks (except at rear end of train) are kept
open
(ii) Ensure Isolating cock of DVs to be in open position
(iii) Ensure BP & FP coupling at rear end of train is placed on support
(iv) Ensure CBCs are properly locked and operating handles
properly secured.
(v) Ensure proper closing of doors.
6.5.4 ADDITIONAL ITEMS FOR BOBR/BOBR’N’/BLC WAGONS
1.1 STATIONS:
1.2 ENROUTE:
1.4 GENERAL:
2.1 STATIONS/ENROUTE :
1. Train No..............................................
Engine No...........................................
Base ...................................................
Load...................................................
OPRS No./MV5 No..............................
From station ................................to station...........................................
Departure time.............................Arrival time......................................
i. Train engine.................................................................
ii. Brake van....................................................................
iii. Total no. of cylinders..................................................
No. of effective cylinders...........................................
Brake power % ...........................................................
10. Check
(a) Whether Loco Pilot follows correct procedure while passing a
defective Signal at ON.
(b) Whether Loco Pilot follows correct procedure while passing
an automatic Signal at ON/IBS at ON.
(c ) Whether the Loco Pilot checks personally authority to
proceed when delivered to him by Station staff.
(d) Whether engine crew exchange all right Signal correctly with
the Guard of train, station staff, with train crew of train passing on
adjacent lines.
(e) Whether Loco Pilot and Assistant Loco Pilot whistle freely while
approaching W/WL Boards upto level crossing gates and running
through Stations.
(f) Whether the engine crew look back frequently particularly on
curves to ensure safe and complete running of trains?
(g) Whether the Loco Pilot observe following correctly:-
i. Permanent speed restriction
ii. Engineering temporary speed restriction.
iii. Speed limits while entering and leaving form loop
line.
iv. Maximum permissible speed of
Mail/Express/Passenger/Goods train.
v. Other speed restrictions.
(h) Knowledge of critical locations to engine crew
(i) Alertness and sense of responsibility of ALP
(j) Knowledge of working on Gradient sections
(k) Observance of rules for preventing SPAD
(l) Knowledge of stabling a train
11. Whether Loco Pilot stop and start the train without jerk?
12. Whether the Loco Pilot ensures while stopping his train that
fouling mark is clear?
13. Calling out of Signal aspect between Loco Pilot/Assistant Loco
Pilot.
14. Whether engine crew are watching safe passage of trains on
adjacent line and checking tail board or Guard’s Signal on
adjacent line.
15. Whether ghat competency certificate is available?
16. Whether any unusual occurrence observed on run?
17. Whether any unauthorized person is travelling in loop?
18. Switching OFF of mobiles phones of LP/ALP
19. Sigma marks on second mast before every signals.
20. Loco Pilot’s knowledge to be tested in following:-
i. Protection of adjacent line on top priority during accident.
ii. Use of flasher light, when train stopped in section.
iii. Train delayed in block section.
iv. Train stalled in rising gradient.
v. Procedure to be followed to pass IBS at ON.
vi. Procedure to be followed when experienced jerked in
section.
vii. Ghat working rule.
viii. Procedure for working load without BPC.
ix. Loco Pilot’s duty during TSL working and all communication
failure.
x. Working of trains during train parting.
xi. Knowledge of whistle codes.
xii. Speed of train when headlight bulb is fused.
xiii. Working of train when headlight and marker light both are
failed or not working.
xiv. Whether Loco Pilot and Assistant Loco Pilot are in habit to
write defects in signals and track in books kept in lobbies?
1. Staff on duty:
Crew Booking supervisor
Shademan/detail check
2. Manual sign ‘ON’ and sign ‘OFF’ register in case of CMS failure.
3. Breathlyser test record to be counter signed by lobby incharge.
4. Bio-data register- how many Loco Pilots/Guards are due for
PME/Refresher/Safety camp.
5. Breathlyser instrument in working condition and total breathalyser
equipment available.
6. Board displaying staff wearing glasses displayed in lobby?
7. Board displaying correct safety circulars, safety bulletins and
headquarter bulletins is displayed in lobby – Yes/No.
8. List of CMS ID of all Running staff and supervisors.
Safety circular
Order/Instruction book
Caution order register
Safety bulletins
9. Whether caution order foils are daily received and filed correctly
and brought forward in caution order register every Monday.
10. Whether illuminated caution order boards displays Caution order
imposed section wise as per caution order.
11. Register indicating Loco Pilots screened in ABC category and
their monitoring by the respective LI’s is maintained.
12. Unusual incidences register is maintained at the lobby and Loco
Pilots/Guards are recording entries in the same. Yes/No
13. Staff detail books are properly maintained. Booking of crew as
per crew link.
14. Loco Pilot Observation Register is maintained properly and
failures recorded by the Loco Pilots are repeated promptly to
test room/PCOR on duty and compliance recorded of the same.
15. Whether First-Aid Box available in lobby is having the medicines
as per FA Box list and is being regularly checked. Availability of
stretcher.
16. Whether G&SR, Accident Manual with the latest correction slips
posted upto date are available with LF/Lobby incharge.
17. Functioning of CMS and CMS log book
18. Whether staff coming on duty are in proper uniform and in
possession of safety performance card and having spare
spectacles.
19. General Up keep of the lobby.
20. List of operationally weak LP/ALPs
21. Whether list of staff addicated to alcoholic drinks is available with
lobby incharge.
22. Whether the list of senior goods Loco Pilots who have been
screened and found fit to work on passenger trains is available
with lobby incahrge.
23. Staff available in lobby should be tested in regard to very
important duties of Loco Pilot & Guard during train operation,
about latest instructions and various corrections made in G&SR.
24. Safety posters and safety slogans are displayed in the lobby.
25. Complaints rederessal system.
26. Simulator training
27. System of CTR collection and dispatch to statistical branch and
compilation of GTKMs
ANNEXURE-III
The name of the Doctor In-charge & the last inspection should
be pasted in- side the Medical Van. The internal condition of the
Medical Van should be absolutely clear of dust etc. The other items to
be checked for medical-Vans are detailed as under:-
NO. OF STATIONS/BLOCK
SIGNAL & TELECOMMUNICATION DEPARTMENT
SECTIONS INSPECTED
LINE MOVEMENT CHART
NO. OF FOOTPLATE
NO. OF HOURS OF
Month of __________________20
Name _____________________
INSPECTION
HOURS
DATE
00
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Total:
Signature: _______________
Station Inspection
NOVEMBER
DECEMBER
SEPTEMBER
Sr. Name of the
FEBRUARY
OCTOBER
JANUARY
AUGUST
No. Stations/Block Sections
MARCH
APRIL
JUNE
MAY
JULY
Signature:
______________
Remarks and Signature of reviewing official
Form No. STIC – 2 B
Footplate Inspection
DAY- BLUE, NIGHT - RED
Name of UP DN
SN Stations/S
NOVEMBER
NOVEMBER
ections
DECEMBER
DECEMBER
SEPTEMBER
SEPTEMBER
FEBRUARY
FEBRUARY
OCTOBER
OCTOBER
JANUARY
JANUARY
AUGUST
AUGUST
MARCH
MARCH
APRIL
APRIL
JUNE
JUNE
MAY
MAY
JULY
JULY
Signature:
______________
Remarks and Signature of reviewing official
TENSION –PREVENTION
8.0 SIGNALS
Gang Insp. Once in a month Once in a month one Minimum one gang Minimum one
(all gangs) gang per JE/P.Way per SSE/P.Way gang per
Incharge every SSE/P.Way
month Incharge three
month
Push Trolley Once in a fortnight Once in a month Once in a month Once in three
Inspection month
Curve Once in Six month Once in Six month by One curve every Minimum one
by rotation with rotation with quarter under each curve in each
SSE/P.Way Incharge sectional JE/P.Way SSE/P.Way Incharge ADEN section in
every three
months.
Level Once in a month Once in a month Once in Six month Minimum One LC
crossing per SSE/P.Way
Incharge in three
months
Night Insp. Footplate Station/Ya R/Room Total Insp
Insp. rd/Lobby Insp.
Insp. Remarks
HQ Officers
COM 1 1
CFTM 1 1
CPTM 1 1 2
CTPM 1 1 2
Dy. COM/Goods 1 1 2
Dy.COM/Coaching 1 1 2
STM/Goods 1 1 2
STM/Planning 1 1 2
STM/Gen.&Rule 1 1 2
Divisional Officers
Sr. DOM 1 1 1 3
Detailed
Inspection
of one
major
station in six
month
Sr. DOM/G, 1 1 1 1 4
DOM/G
-do-
Sr. Scale 2 1 1 4
Detailed
Jr. Scale 2 1 1 4
Inspection
of one
major
station in six
month
Note : Above is minimum number of inspection more inspection can be done by officer
Mechanical Department
Month Inspection schedule
WORKSHOP/GEN C&W
HQ HQ Division
OFFICER / TYPE OF
SN CWE JAG (HQ) SS CRSE JAG JS JAG SS JS
INSPECTION
WS/ PLG Secy
1 Workshop 1 1
Coaching Depot
a Washing Line 2 3 4
b Platform 2 3 4
c Sick Line 1 2 2
d Br. Power 2 4
Checks 1
Jt. Insp. of
Infrastructural
facility of
2 2 2 2
Coaching
Maintenance 2 per 2 per 2 per
e
Depot, Pit year year year
Lines and Sick
Lines.
f Night
Inspection 1 2 2
g Rake 4 6
Inspection 2
Freight Yard
a Sick Line/ ROH 1 2 2
Depot
b Yard 4 2 2 3
1
c Night 1 1 1
Inspection
d Super Check 1 2 4
of Goods Rake
including
Brake Power
Check.
Jt. Inspection
3 of 2 2 2
infrastructural
facility of
wagon
maintenance 2 per 2 per 2 per
e
Depot, year year year
Examination 2
3
Yard & Sick
Line.
f Office 1 1 1
Inspection
g Qualities of 1 1 2
GDR Check
Diesel Shed
a Super Check
of locomotive
b Foot Plate
Inspection
4
c Shed Night
Inspection
d RDI
e 140 T Crane
(Maintenance
Aspect)
b Crew Booking
Lobby (Day/
Night)
c Running Room
5 d Ambush
Check
e Safety Seminar
f RDI
g ART/ ARME
h 140t Crane
Surprise night
i Insp.
Total 4* 2 2* 4* 4* 4* 4* 17 26 36
NOTE :-
1. * - Including Foot Plate/ One Night Inspection.
2. @ - The detail of Inspection has been given by this office L No. Mech./NCR/HAG-SAG/Insp
Mechanical Department
Monthly Inspection schedule
Diesel Shed
a Super 4 4 6
Check
of
locomot
ive
b Foot 1 1 2
Plate
Inspecti
on
c Shed 6 per year 1 2
Night
Inspecti
on
4 2 2 2
d RDI Quarterly Quarterly Once in a
month by
nominate
d
ADME(DS
L)
Operation &
a Foot 3 5 8
Plate
b Crew 1/1 2/1 2/1
Booking
Lobby
(Day/
Night)
c Running 1 1 1
Room
d Ambush 1 1 1
5 2 2 2
Check
NOTE :-
1. * - Including Foot Plate/ One Night Inspection.
2. @ - The detail of Inspection has been given by this office L No. Mech./NCR/HAG
Signal and Telecommunication department
Monthly Inspection schedule
Divisional Officer
JA 2 4 6
Sr.Scale/Jr.Scale 2 10 12
The above schedule of inspection is only indicative and actually the officers
shall carry out more inspections. Jr. Scale/Sr. Scale officer direct incharge of
the section shall spent maximum time in the field
The schedule inspection as defined above shall not include casual
inspections, visiting stations/spot while attending failure and
breakdowns/accidents and also while accompanying higher officials.
Inspection carried out by the officers independently without accompanying
higher officials shall only be treated as the finspection and counted in the
number of inspection for including the above schedule
Electrical Department
Monthly Inspection schedule
PHOD/HOD 1 1 2 4
JA grade 1 1 2 4
Senior Scale 2 1 2 5
Junior Scale 2 1 3 6
Electrical department
Monthly Inspection schedule
4.0 Traction Distribution
S.N. Description JA SS JS JA SS JS
13 Office inspection 1 1 1
Electrical department
Monthly Inspection Schedule
11 Night Inspection
12 Others
Electrical department
Monthly Inspection Schedule
Sick Line
Facilitation/Sub One in a One in 6 One in 4
3 year month month
4 Inspection of power
station/substation/DG
sets One in a
1 1 2 year
5 Major AC plants
One in a One in a
1 1 2 year year
6 Major pump Houses One in a
1 1 2 year
7 Station A One in 2 One in a
1 in 2 month 1 1 months year
8 Major
colonies/Hospitals/Heal
th units
1 in 2 month 1 1
9 Major service buildings
1 in 3 month 1 in 2 month 1
Engineering Department (Open line)
Monthly Inspection schedule
1 1 2 4
CTE
1 1 2 4
CBE
1 1 2 4
CE/TMC
1 1 2 4
CE/P&D
1 1 2 4
CE/TS
1 1 2 4
CE/G
Safety Department
Monthly Inspection schedule
Sr. DSO 2 6 8
DSO/ADSO 2 6 8