0% found this document useful (0 votes)
0 views

Air Balancing Report (1)

The document contains test certificates for air flow velocity and volume testing conducted for M/s. Thermofisher at a facility in Bangalore on December 4, 2022. The tests were performed using an Air Capture Hood, and the results indicate that the air flow velocities meet the specified requirements as per ISO 14644-1:2015 standards. Calibration details for the testing instrument are also provided, with the next calibration due on July 10, 2023.

Uploaded by

peaceforabdul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
0 views

Air Balancing Report (1)

The document contains test certificates for air flow velocity and volume testing conducted for M/s. Thermofisher at a facility in Bangalore on December 4, 2022. The tests were performed using an Air Capture Hood, and the results indicate that the air flow velocities meet the specified requirements as per ISO 14644-1:2015 standards. Calibration details for the testing instrument are also provided, with the next calibration due on July 10, 2023.

Uploaded by

peaceforabdul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Galihmtion lnd Ualidation Labotato]y

6J P-TGGh
Ground Floor, No 48/1-1168-1178/1, Nagarabhavi, 1st Stage, 1 st Block, Bengaluru, Bengaluru Urban, Karnataka'560072
ph : +91 - 080 23185660. Website: www.ptechprojects.com, E-mail: [email protected]

Certificote

Certificate No ACPHI22-231001
lustomer M/s.Thermofisher
)lant Date of Test o4.12.2022
Near SAI BABA Hospital ,Near lTPL,White Field
Test Reference ISO 14644-1:2015
Bangalore-560048

INSTRUMENT USED FOR TESTING

lnstrument Sr. Number T83801 41 3023


nstrument Used Air Capture Hood

Calibrated on 11.07.2022
Vlake TSI

Calibration Due on 10.07.2023


Model 8380

Area Of Test 'lst Floor


\HU NO 2

* oB'l {ED TEST RESI

Air Flow Rate Total Air Flow Rate Design CFM


in cfm in cfm
AHU NO. Aroa Filtor /Grill No
(A x AV) TFR CFM

SG-01 660

Ccll Culture-O1 SG-02 671 2003 2000 Fine

SG-03 672

SG.O1 750
Fine
2
1492 't 500
Coll Culturo-02
SG.O2 742

SG-01 259
Corridor-01
512 500 Fine
SG-02 253
Lr

INFERENCET i?;ti fne above Air Flow Velocity meets the specified requirements

l-est Corru.ic'ed I v est Wilnessed BY

\4/s. Ihermolisher
for P-Tech Calib rtron Ancl Validation Laboratory.
'
6I'.-,:,,',,3[,91;H1g3*,1,1,:,:i:::*fi :',:,,T,,::l-:,.'..*P,y
ph :+g1 - 0g0 23185660. Website:www.ptechprojects.com, E-mail:validation@ptechprolects,com

Certificote
* O,.. ,,o* Velocity, Volume Testing and Determination of Air Changes
Rates *

SAI BABA Hospital ,Near lTPL,White Field


14644-1:2015

Sr. Number

0n

*i.oetAHeo rEST RE$uLrs *

Fine

As per
disgn,air
quantity
should
be 400
The above Air Flow Velocity meets the specified requirements CFM

Test Conducted BY

for P-l e ch Calibrat,on And Validation Laboratory'


aP.TGGhcali[tation[nilUalidati0n1aborat0]y Ground Floor, No 48/1-1168-1178/1, Nagarabhavi, 1st Stage, 1 st Block, Bengaluru, Bengaluru Urban,
Karnataka-560072

ph : +91 - 080 23185660. Website: wwwptechprqects.com, E-mail: [email protected]

Certificote
* Alr Flow VelOcity'Volume T-esting and Determination of Aif Changes Rates )k

]ustomer Ceriiflcate No ACPHt22-231003


M/s,Thermofisher
rlant Date of Test 04.'12.2022
Near SAI BABA Hospital ,Near lTPL,White Field

Bangalore-560048 Test Reference ISO 14644-1:2015

ltt-

nstrument Used Air Capture Hood lnstrument Sr Number T83801 41 3023

vlake TSt Calibrated on 11.07 .2022

vlodel 8380 Calibration Due on 10.07.2023

Area Of Test 'lst Floor


\HU NO

I TAINED TEST RESULTS *


Air Flow Rato Total Air Flow Rate Design CFM
in cfm in cfm
AHU NO. Area Filter /Grill No
(A x AV) TFR CFM

SG-01 654

SG-02 635 As per


SG.O3 611 design,
sG-04 628 air
4078 4000
Pratome Lab
sG-05 689 quantity
sG-06 301 should
SG.O7 289 be 4500
SG-08 271
CFM
SG-01 587
643 '1726 1 700
Fine
Demo Lab SG-02

4 SG-03 496

SG-01 321

SG.O2 310

SG-03 JJO

SG.O4 ,OR

Corridor
SG.O5 312
315 1 3100 Area not
SG-06 301 clear
SG-07 325

sG-08 341

SG.O9 299

SG.1O 308

i :., i :i::::'

HFgngNC*ir..:"' The above Air Flow Velocity mcets the specified requiremonts

Test Conducied BY ,ssf .i.'{iilii:ii,,,1i, ii,.,ii:ii,

#Tea .8,\

qxtr tfo:!ffiti
o

Mls.Thermofisher
ror P-'r'^ ch Cu orrtiin
r i on Laboratory.

You might also like