JAWA- 9 & 10 (2 X 1000 MW)
COAL FIRED STEAM POWER PLANT PROJECT
OWNER PT. Indo Raya Tenaga RFI No. J910-DH02-P0UGF-045036
REQUEST
CONTRACTOR Consortium DHI & HK FOR DATE February 17, 2025
SUBCONTRACTOR PT. Arta Mas Graha Andalan
INSPECTION UNIT No. -
ATTENTION : Mr. Ihsanuddin Thoha
You are kindly requested to witness the inspection / test as scheduled below:
Date/Time 19-Feb-25 09:00 AM Location Fire Water Booster Pump House
Person in Charge Mr. Hikmatullah (0857-1785-6172)
Category □MECH. □ELEC. ☐I&C □CIVIL □ARCH. □COMMON □OTHERS
Construction PKG Name/No. Inspection for Elevation Survey
System/Comp./Equipment/BLDG Steel Structure
Field ITP for Steel Structure
Erection of General Service
Pump
J910-QM01-P0UMY-045079 _REV.2
Applied Procedure House, Feed Water Boiler Pump Procedure No./Rev No.
(AFC)
House, BOP Pipe Rack,
Workshop Warehouse & Shelter
Facility
4. Erection/Installation Works
4.1 Verify the Readiness of the
Foundation -Survey of Anchor Bolts
positioning and Location, -Check
Foundation Level Paragraph of Procedure 4./4.1/4.2/4.3
4.2 Bottom of Column Base Plate
Inspection Description on the Procedure Insapection, - Verify Base Plate
Free from Rust,Mill Scale,Oil, -
Verify Shear Key Holes
4.3 Check
Aligment(Leveling,Verticality,Straig
htness & Diagonal),-Check Fixation Inspection Point □H □W □SW □R
of Bolts, Shear Key Holes
Geometry and Dimensions.
Survey Inspection :
1. Elevation Monorail
Details for items
Quantity / Volume 1 Items
KKS No/Drawing No.(Rev. No.) J910-YK09-P0UGF-175281 - Fire Water Booster Pump House , Framing Plan, Rev. 0 (AFC)
1. Field ITP for structural erection of General Service Pump House, Feed Water Boiler Pump House,
BOP Pipe Rack, Workshop ware House & Shelter Facility.
Attachments 2. Survey Inspection Report
3. Photo's of Inspection
4. Drawing Approved (HK & IRT)
Result of Inspection
□ Accepted □Rejected □Waived □Cancelled
Comments / Note
Requested by Reviewed by Confirmation by Approved by
PT. Artha Mas Graha Andalan HK Construction Dept HK QC Manager Owner/Consultant
NAME Joe_Narko Azwardi Mario P
SIGN
DATE February 17, 2025 February 17, 2025 February 17, 2025
SURVEY REPORT
PROJECT DETAIL
Client : PT. HUTAMA KARYA : SR/A - HK/II/2025
Project Code : :0
Project Name : Jawa 9&10 (2x1.000MW) Coal Fired Steam Power Plant, Suralaya : 3/14/2025
No Point ORIENTATION SECTION/LINE Result Remarks
Y 9,348,172.267 1
Accepted
Elv. 13,689
Y 9,348,172.261 2
Accepted
Elv. 13,688
Y 9,348,172.266 3
Accepted
Elv. 13,685
Y 9,348,172.262 4
Accepted
Elv. 13,685
Y 9,348,172.265 5
Accepted
Elv. 13,684
Y 9,348,172.270 6
Accepted
Elv. 13,684
Y 9,348,172.271 7
Accepted
Elv. 13,688
Note : The Attached Drawing
Inspected By, Reviewed By, Reviewed & Approved By,
PT. Hutama Karya PT. Artamas PT. Hutama Karya IRT/OE
Surveyor QC Inspector Client's
Name : Name : Name : Name :
Date : Date : Date : Date :
SKETCH
Noted :
Submitted by Checked by Inspected by Withnesed by
Surveyor Sign/Date Construction Sign/Date QC Inspector Sign/Date IRT Inspector Sign/Date Sign/Date
(IRT)
Field ITP for Steel Structure Erection of General Service Pump
J910-QM01-P0UMY-045079
ATTACHMENT 7 (BTIR : BOLT TIGHTENING INSPECTION
ATTACHMENT
Notes :
Inspected By Reviewed & Approved By
PT. Artha Mas Graha Andalan PT. Hutama Karya IRT/OE
QC Inspector Client's
Name : Name : Name :
Date : Date : Date :