The document details a request for inspection of the Jawa 9 & 10 coal-fired steam power plant project, specifically for the elevation survey of the steel structure and associated facilities. The inspection is scheduled for February 19, 2025, and includes verification of foundation readiness and alignment checks. Results from previous inspections indicate that all surveyed points were accepted, with attachments including inspection reports and drawings provided.

Uploaded by

yokiori
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views5 pages

Cover RFI - Fire Water Booster Pump House Bolt Survey Inspection

The document details a request for inspection of the Jawa 9 & 10 coal-fired steam power plant project, specifically for the elevation survey of the steel structure and associated facilities. The inspection is scheduled for February 19, 2025, and includes verification of foundation readiness and alignment checks. Results from previous inspections indicate that all surveyed points were accepted, with attachments including inspection reports and drawings provided.

Uploaded by

yokiori
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 5

JAWA- 9 & 10 (2 X 1000 MW)

COAL FIRED STEAM POWER PLANT PROJECT

OWNER PT. Indo Raya Tenaga RFI No. J910-DH02-P0UGF-045036


REQUEST
CONTRACTOR Consortium DHI & HK FOR DATE February 17, 2025

SUBCONTRACTOR PT. Arta Mas Graha Andalan


INSPECTION UNIT No. -

ATTENTION : Mr. Ihsanuddin Thoha

You are kindly requested to witness the inspection / test as scheduled below:

Date/Time 19-Feb-25 09:00 AM Location Fire Water Booster Pump House

Person in Charge Mr. Hikmatullah (0857-1785-6172)

Category □MECH. □ELEC. ☐I&C □CIVIL □ARCH. □COMMON □OTHERS

Construction PKG Name/No. Inspection for Elevation Survey

System/Comp./Equipment/BLDG Steel Structure


Field ITP for Steel Structure
Erection of General Service
Pump
J910-QM01-P0UMY-045079 _REV.2
Applied Procedure House, Feed Water Boiler Pump Procedure No./Rev No.
(AFC)
House, BOP Pipe Rack,
Workshop Warehouse & Shelter
Facility
4. Erection/Installation Works

4.1 Verify the Readiness of the


Foundation -Survey of Anchor Bolts
positioning and Location, -Check
Foundation Level Paragraph of Procedure 4./4.1/4.2/4.3
4.2 Bottom of Column Base Plate
Inspection Description on the Procedure Insapection, - Verify Base Plate
Free from Rust,Mill Scale,Oil, -
Verify Shear Key Holes
4.3 Check
Aligment(Leveling,Verticality,Straig
htness & Diagonal),-Check Fixation Inspection Point □H □W □SW □R
of Bolts, Shear Key Holes
Geometry and Dimensions.

Survey Inspection :
1. Elevation Monorail

Details for items

Quantity / Volume 1 Items


KKS No/Drawing No.(Rev. No.) J910-YK09-P0UGF-175281 - Fire Water Booster Pump House , Framing Plan, Rev. 0 (AFC)
1. Field ITP for structural erection of General Service Pump House, Feed Water Boiler Pump House,
BOP Pipe Rack, Workshop ware House & Shelter Facility.
Attachments 2. Survey Inspection Report
3. Photo's of Inspection
4. Drawing Approved (HK & IRT)
Result of Inspection
□ Accepted □Rejected □Waived □Cancelled
Comments / Note

Requested by Reviewed by Confirmation by Approved by


PT. Artha Mas Graha Andalan HK Construction Dept HK QC Manager Owner/Consultant

NAME Joe_Narko Azwardi Mario P

SIGN
DATE February 17, 2025 February 17, 2025 February 17, 2025
SURVEY REPORT
PROJECT DETAIL
Client : PT. HUTAMA KARYA : SR/A - HK/II/2025
Project Code : :0
Project Name : Jawa 9&10 (2x1.000MW) Coal Fired Steam Power Plant, Suralaya : 3/14/2025

No Point ORIENTATION SECTION/LINE Result Remarks

Y 9,348,172.267 1
Accepted
Elv. 13,689
Y 9,348,172.261 2
Accepted
Elv. 13,688
Y 9,348,172.266 3
Accepted
Elv. 13,685
Y 9,348,172.262 4
Accepted
Elv. 13,685
Y 9,348,172.265 5
Accepted
Elv. 13,684
Y 9,348,172.270 6
Accepted
Elv. 13,684
Y 9,348,172.271 7
Accepted
Elv. 13,688

Note : The Attached Drawing


Inspected By, Reviewed By, Reviewed & Approved By,
PT. Hutama Karya PT. Artamas PT. Hutama Karya IRT/OE
Surveyor QC Inspector Client's

Name : Name : Name : Name :


Date : Date : Date : Date :
SKETCH

Noted :

Submitted by Checked by Inspected by Withnesed by


Surveyor Sign/Date Construction Sign/Date QC Inspector Sign/Date IRT Inspector Sign/Date Sign/Date
(IRT)
Field ITP for Steel Structure Erection of General Service Pump
J910-QM01-P0UMY-045079

ATTACHMENT 7 (BTIR : BOLT TIGHTENING INSPECTION

ATTACHMENT

Notes :
Inspected By Reviewed & Approved By
PT. Artha Mas Graha Andalan PT. Hutama Karya IRT/OE
QC Inspector Client's

Name : Name : Name :

Date : Date : Date :