ESTIMATE
To M/S JAY ART Date: 03.04.2025
Trade Star Building,Ground Floor,Office no - 3,B&C wing,Chakala Andheri (EAST) Estimate No. 2024-25/00599
Inq No. by mail
Inq Date 31.03.2025
Site: Somnath Gujarat
SUB.:- Estimate of Façade work.
AMOUNT
Sr. No. DESCRIPTION UNITS QTY RATE INR
1.00 FAÇADE WORKS.
GLAZING :Design, supply and install Curtain Wall glazing system designed to with
stand the design wind pressure of 1.85 kg/sq.mtr confirming to IS -875 part III. ( The
system must pass the proof test at 1.5 times design wind pressure.)with silicon gasket
in exposed groove & microwave cured EPDM gasket in unexposed areas, structural
and weather sealants of Dow Corning or approved equivalant make, Norton spacer
tape ,backer rod, clamping system with hot dip galvanized /aluminium alloy of 6005 T6
brackets designed to accommodate three dimensional movements, SS 304 grade
fasteners and anchor bolts of approved make, nylon separators to prevent bi-metallic
1.01 SQM 96 13,495 12,95,520
contacts,1.5 mm thk aluminium trims and flashings to seal the gaps between curtain
wall and the building structure all in complete required to perform as per specification
and drawing in conjunction with BOQ. The system shall be designed of 12mm Clear
Tuff Glass (Saint Gobain/Guardian/Asahi) & Powder Coting/ Anodizing 101*57 mm
Seriess Mullions / Tromsom spanning between the floors with slab bracket &
provision to accommodate movement at all floor levels . The system shall be designed
to accommodate single and or singel glass units. The system rate shall include with
necessary fittings & accessories.etc
1.02 DOOR : Quote extra over on Patch Door Hardware OZONE/DORMA XLC FITTING Sets 2 23,500 47,000
1.03 MS FABRICATION : Quote extra over MS Fabrication for Glazing Support on 3mtr lvl. KG 300 195 58,500
1.04 ACP CLADDING : Quote extra over ACP WORK FOR MS SECTION COVERING SQM 8 3,550 28,400
1.05 SS GRILLS : Quote extra over SS 304 GRILLS WITH POWDER COTTING SQM 12 6,450 77,400
-
TOTAL INR 15,06,820
Supply: Billing on supply area & Installation: Billing on installed area GST 18% 2,71,227.60
Round Off +
Rs. Seventeen LAKH , Sixty Eight THOUSAND & Forty Eight Only. G. TOTAL INR 17,78,048
Please confirm by return fax with sign & stamp Prepared by
M/S JAY ART For PRV INFRASTRUCTURE PVT.LTD.
01 of 02
2.00 ASSUMPTIONS FOR CALCULATION:
2.01 The above areas are approximate based on the drawing and on the view given for the areas to be cladded.
2.02 Any extra work required will be charged as per the nature of work as on actuals
2.03 Method of measurement : in inches on maximum extant & multiple of 3" & size below 3" will be consider in running feet & ACP Sheet / GLASS/ Windows
3.00 General TERMS & CONDITION:
3.01 The above rates are budgetary and will vary on actual shop drawing/changes in specification and on actual measurement. The quantities given in
3.02 Any change in the ensuing budget will be applicable at actuals.
3.03 Combination/Grid size to be decided by us to minimize wastages.
3.04 Any civil, Scaffolding & MS Fabrication alterations required will be done by Client.
3.05 All basic amenities like electricity, water, working place, site office, storage facility with security will be provided by Client at free of cost.
3.06 Accommodations/Food for the labours shall be provided by client at free of cost
3.07 Completion of work 120-150days after receipt of confirmed order and will depend on the following points.
a) Handing over of site for the work to start. b) Mobilizations of Materials
c) Continuous power supply. d) Payments & Permissions
3.08 Any damages/repairs caused by your other agencies or contractors will have to be reimbursed to us at Cost.
3.09 All quotations and contracts are contingent on war by Nations. natural calamities, riots, fire, etc., Force Majeure clause applicable.
3.10 Validity of quote15days and there after to be confirmed subject to escalation if any.
3.11 Cleaning of Glass/ACP/Louver/Sliding will be done once only at the time of handing over the site and any extra cleaning will be on charged.
3.12 Permissions for renovation & execution for the said work on premises from the Society & Others shall be obtained by the client
3.13 Any kind deposits/caution money in case of permission from society / others shall be bared by client
3.14 ESIC/PF/Any Kind of insurance is not covered in above budget & shall be borne by client as on actuals if applicable
4.00 BASIC RATES:
4.01 Basic rate of sheet all incl unloaded at site has been considered as Rs. 1300/M2 + GST. Actual supplied quantity shall be measured.
4.02 Basic rate of structural steel sections has been considered as Rs. 60/kg T + GST
4.03 Basic rate of Aluminium NALCO/ JINDAL ingot has been considered as Rs. 250/kg
4.04 We recommend heat soak testing for toughened glass. The cost for the same shall be extra.
4.05 If client procures directly, basic rate as mentioned ABOVE shall be deducted from the respective BOQ item rate for supply
5.00 PAYMENT:
5.01 10% advance along with Work order for System & shop Drawing Approvals.
5.02 60% advance for MATERIALS
5.03 00% Against Running bill for Process of Works
5.04 30% of completion of work.
5.05 Taxes will be charged as on actual basis as applicable on the date of Invoice as per statutory norms
5.06 BILL & PAYMENT CYCLE UPTO 15days.
6.00 Warranty & service
6.01 Service warranty for 12 months subject to full & final payment Settlement of the project
6.02 Subject manufacturer's warranty for the component used in project.
7.00 Warranty does not applicable or on the chargeable basis in case of
7.01 Physical damage, Leakage from exterior walls/ceiling, Cracks due to expansion & contraction, bulbs/tubes or any other electrical component for which the
8.00 Commercial Details
8.01 GSTIN: 27AAICP9055D1Z8 & PAN NO. : AAICP9055D
8.02 PF NO. : THTHA2371163000 & ESIC NO.: 31001160650001009
8.03 UDYAM REGISTRATION CERTIFICATE NO.: UDYAM-MH-33-0015308
8.04 CIN NO :U45309MH2016PTC288533
8.05 ISO SERTIFICATE NO. 1718Q21120798
8.06 RTGS Details : PRV INFRASTRUCTURE PVT.LTD.
8.07 ICICI BANK ( Vikhroli East Mumbai-400083)
8.08 ACCT NO : 124905000533 & IFSC CODE : ICIC0001249
Please confirm by return fax with sign & stamp Prepared by
M/S JAY ART For PRV INFRASTRUCTURE PVT.LTD.
02 of 02