SSPL-MEC-FRM-01
ROOT CAUSE FAILURE ANALYSIS Rev. 00, Date: 06-12-2023
Page No: 1 of 1
1. Plant : 2. Section : 3. Area :
4. System : 5. Date : 6. Shift :
7. Down Time (Hrs.) : From Time (Hrs) : To Times (Hrs) : 8. Shift :
9. Failure Description: 10. Action Taken for Restoration:
11. Reason of Failure – 12. Counter Measure:
1. Why?
2. Why?
3. Why?
4. Why?
5. Why?
13. Spares Utilized: 14. Attachments:
15. Suggestion for Modification: 16. Remarks:
Classification Of Misoperation Lack of Lack of Maintenance Incomplete Incomplete Repair Unforeseen Week Component
Failure Design interval Inspection
Analyze By General Manager Signature Strategic Business Unit Director Signature
Signature