F-PD-01 Process Flow Diagram

The document outlines a process flow diagram for the production of a part, detailing various operations from receiving raw materials to dispatch. It includes information on machinery used, inspection points, and suppliers involved in the process. The document is a revision dated July 1, 2019, and includes sections for preparation, checking, and approval by team members.

Uploaded by

kthkr768
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views

F-PD-01 Process Flow Diagram

The document outlines a process flow diagram for the production of a part, detailing various operations from receiving raw materials to dispatch. It includes information on machinery used, inspection points, and suppliers involved in the process. The document is a revision dated July 1, 2019, and includes sections for preparation, checking, and approval by team members.

Uploaded by

kthkr768
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

DOC.

NO: F/PD/01

AQE PROCESS FLOW DIAGRAM Rev.No.:-01


Rev. Date: 01/07/2019
Prototype Prelaunch Production PFD (origin Date):

PFD No : PFD/ Key contect / phone: PFD Rev.No.:

Part Name : PFD Rev.Date:

Part No./ Latest Change level :


Core Team:
Customer Name:

S.No. OPERATION NAME MACHINE/EQP. SOURCE SUPPLIER

10
1Rani electrode
As Per Std. Supplier End 2.Shri Chari 3
10
Receiving Inspection of Raw Chinta mani
Material + Storage
R.M Store In House

20 Cold forging Bolt Master Outsource Roohani fasterners

30 130 30 Color turning Adda Inhouse

40 Facing, Chemfering & Grooving CNC Inhouse

50 Threading Thread roll Inhouse


120
40 60 Grinding Centreless grinder Inhouse

70 Plating ________ Outsource Bikram plater & Deepak

80 Incoming Inspection of Plating Manually Inhouse


110
50 ` 90 Final Inspection Manually Inhouse

100 Packing Manually Inhouse

110 Dispatch Manually Inhouse


60 70 80 90
100

STORAGE / DESPATCH OP. & INSP. BOTH

OPERATION TRANSFER

INSPECTION INSP. + STORAGE

Sr.No. Rev.No. Rev. Date Detail Name & Sign

PREPARED BY: CHECKED BY: APPROVED BY: