The document outlines various methods for calculating charges for civil engineering services, including cost plus fixed fee, hourly billing rates, and fixed price agreements. It emphasizes the importance of defining the scope of services to estimate costs accurately and proposes equitable fixed fees. Additionally, it provides guidelines for minimum compensation rates for civil engineers based on project type and complexity, as well as regional wage standards.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
19 views2 pages
Charges of Civil
The document outlines various methods for calculating charges for civil engineering services, including cost plus fixed fee, hourly billing rates, and fixed price agreements. It emphasizes the importance of defining the scope of services to estimate costs accurately and proposes equitable fixed fees. Additionally, it provides guidelines for minimum compensation rates for civil engineers based on project type and complexity, as well as regional wage standards.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2
COST PLUS FIXED FEE
CHARGES OF CIVIL Under this agreement, the Civil
ENGINEERING Engineer is reimbursed for the actual costs of all services and supplies SERVICES related to the project including: salary cost, Overhead, Direct non salary CHARGES FOR CIVIL ENGINEERING expense, Fixed SERVICES ARE USUALLY COMPUTED The cost plus fixed fee basis requires USING ONE OF THE SIX METHODS; that the client and the Civil engineer Salary cost times multiplier plus direct define and agree upon the scope of salary expense (Reimbursable) services the Civil Engineer to Hourly Billing rates plus reimbursable perform. Per Diem Such definition of the scope of Cost plus fixed fee. (CPFF) service is essential to enable the Civil Fixed price engineer to estimate costs and Percentage of construction cost propose an equitable fixed fee amount. This must be incorporated SALARY COST TIMES MULTIPLIER into the client- engineer agreement. PLUS DIRECT SALARY EXPENSE (REIMBURSABLE) FIXED PRICE Are frequently used method of The fixed price method of determining charges for engineering compensation is frequently used for services. With this method, charges investigations and studies and for for engineering services are based basic services on design type mainly on direct salaries. projects where the scope and Salary cost defined as direct complexity of the assignment are salary plus employee benefits, clearly and fully defined. The fixed Multiplier is a factor that price amount can be calculated as compensates the civil engineer the sum total of estimated for overhead plus a reasonable engineering costs for the salaries, margin for contingencies, interest overhead and nonsalary expenses, or invested capital readiness to an allowance for contingencies serve and profit. interest on invested ( capital, Direct non-salary expenses readiness to serve, and a reasonable amount for profit. HOURLY BILLING RATE A fixed price agreement should The hourly billing rate method of contain a clearly stated time period compensation is very similar to the during which the services will be salary cost times multiplier in that performed and a provision for hourly billing rate includes all direct adjustment of compensation if the personnel expense, overhead and project is delayed for reasons beyond profit. the Civil Engineers control.
PER DIEM PERCENTAGE OF CONSTRUCTION
the term per diem normally refers to The percentage of construction cost an eight hour day. method is seldom used raw. Because The per diem charge should be of increasing complexity and large based on the complexity, risk and variation in tasks for projects, the important of the services and on the percentage of construction cost fee Civil Engineers professional standing, curves no longer have a direct expertise and breadth of experience. correlation to the required The Civil Engineer is also reimbursed engineering fees for specific projects. for travel and subsistence cost and This Method may be used to for other out of pocket expenses determined the compensation of the incurred when away from the home engineer for services where the office. principal responsibility is the detailed design or construction supervision of positions provided by the Civil facilities to be constructed. Service Commission.
Construction Cost is defined as the A Civil Engineer employed in the
estimated total cost of constructing private sector who signs and seals the facility to be covered by the the Civil Engineering plans, proposed detailed design or specifications and other related construction supervision services, documents of a certain project for excluding the fees and other costs of and in behalf of his employers shall such services, the cost of land and be compensated with a minimum right of way, and legal and 10% of the professional fee for the administrative expenses. project, over and above the basic The percentage fee shall consider the monthly salary- type, complexity, location, and magnitude of construction cost of the project and shall not exceed the following percentage of estimated construction cost: Feasibility studies - 3% Detailed engineering design - 6% Detailed architectural and engineering design - 8% Construction supervision - 10%
These percentages include only
those works normally undertaken in arriving at the expected outputs and do not include special studies or investigations. It is further emphasized that the above percentages are only ceilings and it does not necessarily mean that the said percentages shall always be adopted for each project. The actual percentage for a particular project will depend on the factors - the type, complexity, location, and magnitude of construction cost.
SCHEDULE OF MINIMUM BASIC FEES
When doing work on foreign assisted projects or in projects where international consultants participate, the Civil Engineer performing similar or equivalent work, should accept compensation that approximates the international standard rates. Civil Engineers regularly employed in the private sector shall have minimum compensation corresponding to 10% more than the minimum wage prevailing in the region as basic monthly salary. Civil Engineers employed in the government sector shall have minimum basic monthly salary corresponding to appropriate entry