4005
LOCATIONS TO BE AGREED ON SITE. 60 "U" SHAPE T10@200 "U" SHAPE T10@200 1. READ IN CONJUNCTION WITH ALL ARCHITECTS
2T12@200 T14@200(TOP & BOT.) AND MAIN CONSULTANTS DRAWINGS.
Y Y SLAB REINFORCEMENT BOTH WAYS SLAB REINFORCEMENT 2. THE SLAB HAS BEEN DESIGNED TO CARRY THE FOLLOWING LOADS:
31
SUPER IMPOSED DEAD LOAD: 5.00 kN/m²
SUPER IMPOSED LIVE LOAD : 2.00 kN/m²
3. SETTING OUT OF ALL SERVICE HOLES TO BE
CONFIRMED BY MEP SUB CONTRACTOR PRIOR
1200
1200
TO THE CONCRETE POUR.
1200 WIDE INFILL STRIP U.N.O. 4. FOR ALL SETTING OUT DIMENSIONS TO SLAB
(STRESSING PAN IN BEAMS) REFER TO MAIN CONSULTANT'S DRAWINGS.
REINFORCEMENT CAGE 2400 2400
PROP
PROP
PROP
PROP
PROP
PROP
MAY OCCUR IN THE SLABS BEFORE STRESSING SUCH MINOR CRACKS
PLACE AFTER COMPLETION Scale N.T.S DO NOT AFFECT THE BEHAVIOR OF THE P.T SLABS AND COULD
OF STRESSING WORKS. MIN.150mm EVENTUALLY BE GROUTED.
BEAM TOP REINFORCEMENT BEAM TOP REINFORCEMENT
T16@200 CTRS L=1800mm T16@200 CTRS L=1800mm
AS PER SECTIONS AS PER SECTIONS
CRANE OPENING TYPICAL REINFORCEMENT 7. DURING CONSTRUCTION WHERE DESIGN LOADS FOR P.T SLAB
ARE LESS THAN UPPER SLAB OWN WEIGHT.
FACES OF POCKET TO BE STRAIGHT BARS BTM STRAIGHT BARS BTM
SCABBLED AND POCKET INFILLED 50Ø BACK PROPPING MUST BE PROVIDED TO DISTRIBUTE THE WEIGHT
T12@200TOP&BTM LINKS Top Slab OF UPPER SLAB UNDER CONSTRUCTION OVER TWO ALREADY
WITH PROPRIETARY NON SHRINK 15° 600
CEMENTITIOUS MORTAR. 300 180mm DEEP POCKET. Reinforcement(if any) STRESSED SLABS BELOW.
BEAM DEPTH
N.T.S. L MAX.OF(T10@250 ; MESH) 1- GENERAL ARRANGEMENT: 2- TENDONS:
TYPICAL SLAB EDGE -COLUMNS LIVE END ANCHORAGE
CONTINUOUS COLUMN
POCKET DETAIL AT ANGLE TERMINATED COLUMN
DEAD END ANCHORAGE
U-BARS SHAPE( ) Bottom Slab
50Ø TOP STRESSING PAN BOX.
CONSTRUCTION JOINT 2/6T16 BARS L=2000 L/2 L/2 MAX.OF(T10@250 ; MESH) Reinforcement(if any)
BEAM BTM. REINF'T PLANTED COLUMN
LINKS
SEE NOTE AS PER SECTIONS INDICATES DRAPE MEASURED FROM
1000
High Yield steel
Number of rebars
- P.T.B : POST - TENSIONED BEAMS
141
TYPICAL DETAIL AT CONSTRUCTION JOINT SECTION Y-Y ADD 2T16 ADD 2T16
600
TOP AND BTTM. TOP AND BTTM.
MATERIALS:
N.T.S.
ADD 3T12@100 L=1500mm CONCRETE.
TOP AND BTM CONCRETE MINIMUM STRENGHT
50
401
401
STRANDS:
SEVEN WIRES STRAND -LOW RELAXATION
ADD T12 ADD T12 AREA=98 mm²
1000 1000
Y≤500mm
600
Bottom Slab Bottom Slab
Bottom Slab Bottom Slab ADD 2T16 -WOOBLE FACTOR =0.0066/m
Reinforcement(if any)
SECTION E-E Reinforcement(if any) -WEDGE PULL IN =6mm.
1000
Reinforcement(if any) Reinforcement(if any)
E
SECTION D-D TOP AND BTTM.
141
TYPICAL OPENING REINFORCEMENT DETAILS TYPICAL OPENING REINFORCEMENT DETAILS U-BARS SHAPE( )
C D
L
COLUMN ABOVE
ADD T12 TOP & BOTT. OPENING DIMENSION ≤ 500mm ONE OPENING DIMENSION > 500mm MAX.OF(T10@250 ; MESH)
SHORING METHOD
TOP REINF. OVER COLUMN IN ONE PHASE L = 1750mm
TO BE CAST WITH SLAB - A PROPER SHORING METHOD STATEMENT IS TO BE DONE BY THE CONTRACTOR TO INSURE THAT
8Ø 8Ø ANY POST TENSION SLAB IS NOT LOADED MORE THAN HALF ITS SERVICE LOAD BEFORE 28 DAYS.
-THE CONTRACTOR HAS TO SEND THE METHOD STATEMENT TO THE PT SUPPLIER FOR APPROVAL
ANCHOR BLOCK TO BE FIXED MAX. OF(T10@250 ; TOP MESH) Top Slab VENT PIPE EXTENDS PRIOR THE EXECUTION OF ANY PT SLAB.
4T10 (2TOP+2BTM) STRANDS TO BE
MIN 100mm
T10@250 L=1000mm or T10@250 L=1000mm or TO FORMWORK PRIOR TO INSTALLATION POCKET TENDON DUCTS Reinforcement(if any) VERTICALLY TO PROTRUDE DEGREASED 150
Bottom Slab Reinf. (if any) Bottom Slab Reinf. (if any) OF ADJACENT REINFORCEMENT. THROUGH TOP OF SLAB Slab To Be Cast Slab To Be Cast
FLAT DUCT
A
TYPICAL
FLAT DUCT Fully Propped Fully Propped
A B B
100
50Ø 50Ø
POCKET
CHAIRS
3Cm
T10@60mm N°=7
Top Slab Top Slab
Reinforcement(if any) Reinforcement(if any) ADD 3T10@250
600 600 600 CTRS(U-BARS) PER DEAD END
2T10 2T10
130
IF NO TOP REINFORCEMENT
4T12 IS PROVIDED
L=1.0m
Min. 240mm
stirr. Ø8
nx100
90 150
°
TYPICAL DETAIL@SLEEVE OPEN BELOW TENDONS 1800
Bottom Slab REV date by DETAILS
MAX. (T10@200 ; BOTTOM MESH) Reinforcement(if any)
SECTION A-A
Bottom Slab ADD 4T12 BOTTOM STRAIGHT BARS Bottom Slab
SECTION B-B Project No. :
TYPICAL SECTION FOR SLABS REINF'T DETAIL AT PANS. TENDONS ARE TO BE NOMINALLY COLUMN HEAD REINFORCEMENT
TO BE NOMINALLY DISPLACED TO
N1
LINE OF LINK
DISPLACED TO AVOID VERTICAL
COLUMN REINFORCEMENT AVOID TENDONS IF NECESSARY TOP REINFORCEMENT
LINE OF LINKS MUST BE PLACED
6Ø
6Ø
T2 LAYER T2 LAYER AT THE CORNERS OF THE COLUMNS. POST TENSION DESIGN AND SUB-CONTRACTOR:
ADD 2x2T10 L BARS
HL
N3 WHEN MORE THAN TWO LINES OF LINKS
SINGLE LEG LINK DOUBLE LEG LINK
SPACING OF T1 BARS 8Ø HL ARE TO BE PLACED, THEY SHOUD BE
SHAPE:( ) TO BE BENT
AFTER STRESSING AS PLAN T10 LACERS T10 LACERS EVENLY SPACED.
S
CLOSSD LINKS T10@45mm N°=6 COLUMN SHEAR LINK DETAIL (U.N.O.) TOP REINFORCEMENT
CL T10 LACER BARS
S0
S0
N3
COLUMN HEAD
SPACING OF T2 BARS COLUMN HEAD
Top Beam Reinforcement Top Beam SHAPE:( ) REINF LAYER T1
REINF LAYER T2
25
Reinforcement AS PLAN
N2 N2
600
S0 S
DEVELOPED STRUCTURES ENGINEERING
S S0
Drawing Title :
90
°
S0
SLAB BTM REINF N1 : NUMBER OF LINE OF LINKS
ALONG THE LONG COLUMN SIDE
T10 LACER BARS TO BE
Add 2T16 L=1800mm ISSUED FOR :
N2 : NUMBER OF LINE OF LINKS
S
ADDED IF NEEDED
TYPICAL TOP VIEW N3
ALONG THE SHORT COLUMN SIDE
APPROVAL
TYPICAL SECTION A-A N.T.S.
N3 : NUMBER OF STUDS (SHEAR LINKS)
PER LINE OF LINK
N.T.S.
A A S0 : FIRST LINK DISTANCE FROM COLUMN FACE Drawing Number: Revision
S : LINKS SPACING
Bottom Beam Reinforcement 00
T : LINKS DIAMETER
TYPICAL PUNCHING DETAILS N1 HL : thk-TOP COVER-BOTTOM COVER WHERE
Scale: 1:100 (A1) Engineer: J.A Drawn by: Z.N.
TYPICAL SECTION FOR BEAMS REINF'T DETAIL AT PANS. N.T.S. (thk) IS THE SLAB THICKNESS. TOP COVER AND
BOTTOM COVER AS PER GENERAL NOTES. Drawing Status: Date: 00 00 2022
Sign: