0% found this document useful (0 votes)
11 views2 pages

Arrival 1

This document is an Arrival Report submitted by Syed Saadat Ali Zaidi to the Assistant Manager at Jia Bagga Sub Division Lahore. It complies with an office order from the Superintending Engineer dated November 11, 2021. The report is submitted in a respectful manner.

Uploaded by

Saadat Zaidi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views2 pages

Arrival 1

This document is an Arrival Report submitted by Syed Saadat Ali Zaidi to the Assistant Manager at Jia Bagga Sub Division Lahore. It complies with an office order from the Superintending Engineer dated November 11, 2021. The report is submitted in a respectful manner.

Uploaded by

Saadat Zaidi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

LAHORE ELECTRIC SUPPLY COMPANY

To,
The Assistant Manager (Op)
Jia Bagga Sub Division Lahore.

Subject: ARRIVAL REPORT.

Most respectfully I beg to submit my Arrival Report in compliance with

Superintending Engineer (O) Central Circle LESCO Office Order No.1261-64, dated 11-

11-2021(F.N), today on A.N

Yours Obediently,

Syed Saadat Ali Zaidi


LS-I

You might also like