0% found this document useful (0 votes)
15 views10 pages

Berita Acara Survey Dan Assessment Perangkat Ixia - 250306 - 092404

The document outlines the assessment and survey conducted on telecommunications equipment at Telkomsel's Telecommunication Centre on March 4, 2025. It details the power and network requirements for the Ixia GYG_E100.4 device, including specifications for cabling materials and equipment placements across various floors. Additionally, it includes remarks on the site survey and approvals from relevant stakeholders.

Uploaded by

faishal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views10 pages

Berita Acara Survey Dan Assessment Perangkat Ixia - 250306 - 092404

The document outlines the assessment and survey conducted on telecommunications equipment at Telkomsel's Telecommunication Centre on March 4, 2025. It details the power and network requirements for the Ixia GYG_E100.4 device, including specifications for cabling materials and equipment placements across various floors. Additionally, it includes remarks on the site survey and approvals from relevant stakeholders.

Uploaded by

faishal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

Corporate Service Standard User Access Telkomsel

Telecommunication Centre (TTC) dan


Management STOCore
TELKOMSEL Version 1.0

BERITA ACARA SURVEY DAN ASSESSMENT PERANGKAT


04// 03// TTC Gayungan // 2025

Bahwa Pada
Hari Selasa Tanggal 04 Bulan Maret tahun 2025

Telah Dilakukan Pekerjaan Assessment Perangkat :

Nama/Jenis Perangkat/Service : Ixia GYG_E100.4

Ketentuan Estimasi Power


• Flore/Site : PDU_5th_Floor_E5_Contaiment_Room/UPS.A1 2nd_Floor
dan UPS.B1_1st_Floor
• Power DC : ……………………………..……………Amper
Inverter/PDU/iPDU : ……………………………MCB: ……Ampere
Rectifier : …………………………………………………….
• Power AC : 3 Ampere
UPS : A 200Kva, B 200Kva
Inverter/PDU/iPDU : iPDU_1QF2 _10.4_Ampere MCB:63 Ampere
iPDU_2QF2 _10.2_Ampere MCB:63 Ampere

Ketentuan Estimasi Network

• Floor/Site : 5th_Floor_E.5_Contaiment_Room
• Router/Catalist : Tools/Tap Aggregator Ixia

Sub Con/Mitra Vendor Pelaksana : PT Telemedia Mitra Erajaya /

HP: Iswan Sukamto( 081365536514)

NODIN/SIK : VISIT/EXT/04032025/TTCGAYUNGAN/840889

Remark : Telah dilakukan site survey perangkat ixia Tap Aggregator

Demikian Berita Acara Ini Dibuat Dengan Sebenarnya,


Surabaya, 4 Maret 2025

Diajukan, Disetujui, Disetujui, Mengetahuai


Mitra Owner Project Area 3 OFM Telkomsel Regional 6 CTO Telkomsel Regional 6

( Iswan Sukamto ) (Faishal Arif Darmawan) ( ………………… ) ( …………………..


Firmansyah )

PT Telekomunikasi Selular
Standard User Access Telkomsel Telecommunication Centre (TTC) dan STO Core
Corporate Service Standard User Access Telkomsel
Telecommunication Centre (TTC) dan
Management STOCore
TELKOMSEL Version 1.0

Equipment
Requirment:

Cabling Material
Hasil Survey:

• Proposed space 1 U untuk IXIA_E100G.4 berada di Rack #2 Contaimen E.5 Room 2 nd


Floor
• Perangkat BLF_GYG.1&2 berada satu ruangan di E.5 Room 5th Floor
• Perangkat PE-MOBILE.1 berada di 7.2 Room 2nd Floor
• Perangkat PE-MOBILE.2 berada di A.4 Room 4 th Floor
• Koneksi OAM mgmt IXIA E100.4 di cs-sw-gayungan.5 berada B.3 Room 3 rd Floor

Material support :

Leng
NO Equipment Name Qty Remark
th
(M)
Patchcore/Fiberoptic
Patchcore Duplex Single Mode LC-LC 6 90 Fr: R5.PE-MOBILE.1, floor To : Flex Tap
Patchcore Duplex Single Mode LC-LC 6 80 Fr: R5.PE-MOBILE.2, To : Flex Tap
1 Patchcore Duplex Single Mode LC-LC 12 3 Fr: Flex Tap, To : Ixia Aggregator E100-3
Patchcore Duplex Single Mode LC-LC 6 12 Fr: BLF-GYG-401, To : Flex Tap
Patchcore Duplex Single Mode LC-LC 6 12 Fr: BLF-GYG-402, To : Flex Tap
UTP kabel 1 80 Fr: cs-sw gyg.5 to Ixia mgmt. GYG_E100.4
2 Flex Tap Mount 1 - Propose space (1 U)

PT Telekomunikasi Selular
Standard User Access Telkomsel Telecommunication Centre (TTC) dan STO Core
Corporate Service Standard User Access Telkomsel
Telecommunication Centre (TTC) dan
Management STOCore
TELKOMSEL Version 1.0

Lapiran:
N Foto Remark
O
1

Spesifikasi
Perangkat

LLD Surround

PT Telekomunikasi Selular
Standard User Access Telkomsel Telecommunication Centre (TTC) dan STO Core
Corporate Service Standard User Access Telkomsel
Telecommunication Centre (TTC) dan
Management STOCore
TELKOMSEL Version 1.0

Layout 5th Floor


Penempatan
Rack Ixia Tap
Aggregator
GYG_E100.4
BLF_GYG_401
BLF_GYG_402

Layout 4th Floor


PEMOBOLE.1
Gayungan

PT Telekomunikasi Selular
Standard User Access Telkomsel Telecommunication Centre (TTC) dan STO Core
Corporate Service Standard User Access Telkomsel
Telecommunication Centre (TTC) dan
Management STOCore
TELKOMSEL Version 1.0

Layout 2nd Floor


PEMOBILE.2
Gayungan

Layout 2nd Floor


PEMOBILE.2
Gayungan

PT Telekomunikasi Selular
Standard User Access Telkomsel Telecommunication Centre (TTC) dan STO Core
Corporate Service Standard User Access Telkomsel
Telecommunication Centre (TTC) dan
Management STOCore
TELKOMSEL Version 1.0

Dimensioning
proposed
Ixia_E100.4
at Rack 2
Contaiment
5th floor

Penempatan
Ixia Tap
Aggregator di
2nd
Floor_E5_Room
Rack 2
Contaiment

PT Telekomunikasi Selular
Standard User Access Telkomsel Telecommunication Centre (TTC) dan STO Core
Corporate Service Standard User Access Telkomsel
Telecommunication Centre (TTC) dan
Management STOCore
TELKOMSEL Version 1.0

Proposed
penempatan Ixia
Tap Aggregator di
dalam Rack 2
Contaiment

Proposed MCB
RPDU Ixia Tap
Aggregator
MCB Source A
(63A)
MCB Source B
(63A)

PT Telekomunikasi Selular
Standard User Access Telkomsel Telecommunication Centre (TTC) dan STO Core
Corporate Service Standard User Access Telkomsel
Telecommunication Centre (TTC) dan
Management STOCore
TELKOMSEL Version 1.0

10

Display iPDU
Contaiment
Rack 2
Load Power
Source A
(10,4A)

Load Power
Source B
(10,2A)

11

Proposed MCB
iPDU Ixia Tap
Aggregator
MCB Source A
(63A)
MCB Source B
(63A)

12

UPS A1
Voltase : 220V
Total Load :
68.1KVA

PT Telekomunikasi Selular
Standard User Access Telkomsel Telecommunication Centre (TTC) dan STO Core
Corporate Service Standard User Access Telkomsel
Telecommunication Centre (TTC) dan
Management STOCore
TELKOMSEL Version 1.0

13

UPS B1
Voltase : 220V
Total Load :
72.8KVA

14

Rack
cs_sw_gayungan.
5

15

Rack #4
BLF_GYG.401

PT Telekomunikasi Selular
Standard User Access Telkomsel Telecommunication Centre (TTC) dan STO Core
Corporate Service Standard User Access Telkomsel
Telecommunication Centre (TTC) dan
Management STOCore
TELKOMSEL Version 1.0

16

Rack #5
BLF_GYG.402

16

Rack
GYG_PE-
MOBILE.1

Rack
GYG_PE-
MOBILE.2

PT Telekomunikasi Selular
Standard User Access Telkomsel Telecommunication Centre (TTC) dan STO Core

You might also like